| Tender | Date of Issue | Due Date & Time | Date of Opening & Time |
| Construction Office | |||
| Providing Electrical Installation in Central Animal House in (Basic Medical Sciences Block) P.U. | 20-05-2013 | 27-05-2013 at 03:30 | 27-05-2013 at 03:30 |
| Providing Electrical Installation in Central Animal House in (Basic Medical Sciences Block) Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| P/F of Aluminium Curtain Glazing, Joinery & False Ceiling for the Building of College Bhawan | 16-05-2013 | 20-05-2013 at 03:30 | 20-05-2013 at 03:30 |
| P/F of Aluminium Curtain Glazing,Joinery & False Ceiling for the Building of College Bhawan and Extension of Student Holiday Home Building for Youth Welfare Department in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing 8 passenger Elevator & Electrical Installation of lifts | 10-05-2013 | 21-05-2013 | 27-05-2013 |
| Providing 8 passenger Elevator & Electrical Installation of lifts | |||
| Construction Office | |||
| Quotation | 08-05-2013 | 22-05-2013 at 03:30 | 22-05-2013 at 03:30 |
| 1. M.S. Angle (40x40x5mm) 1408 kg 2. M.S. Sheet(18G) 1021 kg 3. Welding Rods(10no.) 12 pkt (10 No. Wt. 1 pkt = 2.5 kg/pkt) 4. Cutting Blade (14”) 4 Nos. Date of Opening of Quotations will be announced later on | |||
| Dean Students Welfare | |||
| for Contractorship for the Messes / Canteens and Shops in Punjab University & regional centre | 07-05-2013 | 31-05-2013 at 05:00 | 20-06-2013 at 09:30 |
| for Contractorship for the Messes / Canteens and Shops in Punjab University campus, SSGPURC Bajwara, Hoshiarpur & Regional Centre, Ludhiana Hostels for the session 2013-14 shall be held on 20th June’ 2013 in case of messes / canteens and 21st June’ 2013 in case of Hostel shops at 9.30 a.m. in the office of the DSW (Student Centre, Ist Floor). | |||
| Construction Office | |||
| Providing Electrical installation in Security post near Alumini House and near Dental College gate | 10-05-2013 | 17-05-2013 at 03:30 | 17-05-2013 at 03:30 |
| Providing Electrical installation in Security post near Alumini House and near Dental College gate in Panjab University, South Campus, Sector 25, Chandigarh | |||
| Department of Chemistry | |||
| FOR THE PURCHASE OF FLUORESCENCE SPECTROPHOTOMETER | 06-05-2013 | 19-05-2013 at 03:00 | 20-05-2013 at 04:00 |
| FOR THE PURCHASE OF FLUORESCENCE SPECTROPHOTOMETER Date & Time of opening of the Price bids in the department: 4.00 p.m. of 23rd May, 2013 | |||
| Construction Office | |||
| Maintenance of Open Spaces in South Campus, Sector-25, Panjab University, Chandigarh | 23-04-2013 | 15-05-2013 at 03:30 | 15-05-2013 at 03:30 |
| Maintenance of Open Spaces in South Campus, Sector-25, Panjab University, Chandigarh through Contractual Agency | |||
| Construction Office | |||
| Providing Electrical Installation (Remaining Work) for the Construction of Girls Hostel no.9 from | 26-04-2013 | 30-04-2013 at 03:30 | 30-04-2013 at 03:30 |
| Providing Electrical Installation (Remaining Work) for the Construction of Girls Hostel no.9 from (3rd floor to 6th floor) in P.U. South Campus, Chandigarh. | |||
| Construction Office | |||
| Renovation in U.I.H.M.T Building in P.U. Campus, Sector-14, Chandigarh. | 26-04-2013 | 02-05-2013 | 02-05-2013 |
| Renovation in U.I.H.M.T Building in P.U. Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing water supply and sanitary installation for ext. counter of bank in the existing buiding | 25-04-2013 | 01-05-2013 at 03:30 | 01-05-2013 at 03:30 |
| Providing water supply and sanitary installation for extension counter of bank in the existing building to install ATM and to create strong room for the bank at SSGPURC, Hoshiarpur (Pb). | |||
| Construction Office | |||
| SITC of fire hydrant system installed at Girls Hostel no. 3 in Panjab University Campus Sector-14, | 30-04-2013 | 06-05-2013 at 03:30 | 06-05-2013 at 03:30 |
| SITC of fire hydrant system installed at Girls Hostel no. 3 in Panjab University Campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Electrical installation in Security post near Alumini House & near Dental College gate in Sector 25 | 25-04-2013 | 03-05-2013 at 03:30 | 03-05-2013 at 03:30 |
| Providing Electrical installation in Security post near Alumini House and near Dental College gate in Panjab University, South Campus, Sector 25, Chandigarh | |||
| Registrar's Office | |||
| Auction Notice for Shop No. 2 situated in Sector-25 and Shop No. 45, Sector-14 | 04-04-2013 | 17-04-2013 at 11:00 | 17-04-2013 at 11:00 |
| Auction Notice for Shop No. 2 situated in Sector-25 and Shop No. 45, Sector-14 | |||
| Construction Office | |||
| SITC of fire hydrant system at Library Building, Aruna Ranjit Chandra hall, Administrative Block | 22-04-2013 | 29-04-2013 at 03:30 | 29-04-2013 at 03:30 |
| SITC of fire hydrant system at Library Building, Aruna Ranjit Chandra hall, Administrative Block in Panjab University Campus Sector-14, Chandigarh. | |||
| Registrar's Office | |||
| For Supply of Furniture for Administrative Block ,Panjab University | 03-04-2013 | 10-04-2013 at 04:00 | 10-04-2013 at 04:00 |
| For Supply of Furniture for Administrative Block ,Panjab University Date and Time of Opening of Tenders will be announced later on | |||
| Construction Office | |||
| Renovation of Toilet and Pantry adjoining to Chairman’s Room Physics deptt. in Panjab University | 28-03-2013 | 04-04-2013 at 03:30 | 04-04-2013 at 03:30 |
| Renovation of Toilet and Pantry adjoining to Chairman’s Room Physics deptt. in Panjab University campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Fire Hydrant System Installed at Library Building in P.U. Campus, Sec-14, Chandigarh. | 28-03-2013 | 04-04-2013 at 03:30 | 04-04-2013 at 03:30 |
| Fire Hydrant System Installed at Library Building in P.U. Campus, Sec-14, Chandigarh. | |||
| Construction Office | |||
| P/F Wall Paneling in Metal Tiles & Wall Paneling of Fulltone (Perforated) Tiles for The Construct | 01-04-2013 | 03-04-2013 at 03:30 | 03-04-2013 at 03:30 |
| P/F Wall Paneling in Metal Tiles & Wall Paneling of Fulltone(Perforated) Tiles for The Construction of 10 Meters Indoor Shooting Range in P.U. Campus, Sector-14, Chandigarh | |||
| Registrar's Office | |||
| For the purchase of furniture from reputed firms/ manufactures | 26-03-2013 | 10-04-2013 at 05:00 | 10-04-2013 at 05:00 |
| For the purchase of furniture from reputed firms/ manufactures Date and Time of Opening of Tenders will be announced later on | |||
| Construction Office | |||
| Various Tenders | 01-04-2013 | 05-04-2013 at 03:30 | 05-04-2013 at 03:30 |
| 1. Providing 8 passenger Elevator & Electrical Installation in lift well and machine room with Buyback of Existing lift in A. C. Joshi Library in P.U. Campus, Sector-14, Chandigarh 2. Providing 8 passenger Elevator & Electrical Installation in lift well and machine room less Building of Emerging Area in Social Sciences in P.U. Campus, Sector-14,Chandigarh 3. Providing 8 passenger Elevator in lift well machine room less in Guru Teg Bahadur Bhawan Building in P.U. Campus, Sector-14, Chandigarh 4. Providing 8 passenger Elevator in lift well machine room less in Boys Hostel No. 8 in P.U. South Campus, Chandigarh 5. Providing 8 passenger Elevator in lift well machine room less in Guest House Building in P.U. Campus, Sector-14, Chandigarh 6. Providing 8 passenger Elevator in lift well machine room less in College Bhawan and Student Holiday Home Building For Youth Welfare Department in P.U. Campus, Sector-14, Chandigarh | |||
| University Institute of Pharmaceutical Sciences | |||
| Quotations are invited for hiring Langoor with Trainer | 20-03-2013 | 30-03-2013 at 05:00 | 30-03-2013 at 05:00 |
| Quotations are invited for hiring Langoor with Trainer Date of Opening of Quotations will be announced later on | |||
| Construction Office | |||
| Replacement of old switchgear and providing panel in Construction Office in Panjab University | 18-03-2013 | 26-03-2013 at 03:30 | 26-03-2013 at 03:30 |
| Replacement of old switchgear and providing panel in Construction Office in Panjab University Campus, Sector 14 Chandigarh. | |||
| Directorate of Sports | |||
| Quotation for Annual Maintenance Contract for the running A. C. Plants of the Gymnasium Bulding | 07-03-2013 | 22-03-2013 at 05:00 | 22-03-2013 at 05:00 |
| Quotation for Annual Maintenance Contract for the running A.C. Plants of the Gymnasium Bulding Date of Opening of Quotations will be announced later on | |||
| Directorate of Sports | |||
| Quotation for the purchase of 1600 Kgs. Of T C C A (Tetra Chalora Cyamenic Acid) for the Panjab Univ | 07-03-2013 | 22-03-2013 | 22-03-2013 |
| Quotation for the purchase of 1600 Kgs. Of T C C A (Tetra Chalora Cyamenic Acid) for the Panjab Univversity Date of Opening of Quotations will be announced later on | |||
| Construction Office | |||
| P/L of Tile Terracing and Polycarbonate Sheets at Ducts for Construction of 100 Bedded Hospital ( | 14-03-2013 | 18-03-2013 at 03:30 | 18-03-2013 at 03:30 |
| P/L of Tile Terracing and Polycarbonate Sheets at Ducts for Construction of 100 Bedded Hospital (Ist Phase) in P.U. South Campus, Chandigarh | |||
| Department of Physics | |||
| DOCUMENT FOR THE PURCHASE OF X-RAY DIFFRACTION SPECTROMETER | 07-03-2013 | 22-03-2013 at 03:30 | 25-03-2013 at 03:30 |
| TENDER DOCUMENT FOR THE PURCHASE OF X-RAY DIFFRACTION SPECTROMETER | |||
| Construction Office | |||
| Supply of Cast Iron Benches of 5 feet length with iron strips | 05-03-2013 | 12-03-2013 at 03:30 | 12-03-2013 at 03:30 |
| “1. Supply of Cast Iron Benches of 5 feet length with iron strips (colour green strips with green colour sides with flower on top)approx 70kg onwards weight Date of Opening of Quotations will be announced later on | |||
| Construction Office | |||
| Various Tenders | 18-03-2013 | 22-03-2013 at 03:30 | 22-03-2013 at 03:30 |
| Re-plastering and Apex of external area of T-II type houses (1 to 32) in Panjab University South Campus Sector-25, Chandigarh. Emerging areas in social sciences at Panjab University Campus, Sector-14, Chandigarh. | |||
| Registrar's Office | |||
| Multizone Portable DFMD(Waterproof/Weatherproof) | 20-02-2013 | 04-03-2013 at 03:00 | 04-03-2013 at 03:00 |
| Sealed Quotations for the purchase of Multizone Portable DFMD(Waterproof/Weatherproof) Date & Time of Opening will be notified later | |||
| Construction Office | |||
| P/F W.S. & S.I. for the 3rd Block (2nd floor to 6th floor) for The Construction of Girls Hostel No | 27-02-2013 | 01-03-2013 at 03:30 | 01-03-2013 at 03:30 |
| P/F W.S. & S.I. for the 3rd Block (2nd floor to 6th floor) for The Construction of Girls Hostel No. 9 (2nd phase) in P.U. South Campus, Chandigarh. | |||
| Construction Office | |||
| P/F of Dholpur Sand Stone and Red Agra Sand Stone on the External Sides of Construction of College | 28-02-2013 | 04-03-2013 at 03:30 | 04-03-2013 at 03:30 |
| P/F of Dholpur Sand Stone and Red Agra Sand Stone on the External Sides of Construction of College Bhawan and Extension of Student Holiday Home Building for Youth Welfare Department in P.U. Campus, Sector-14, Chandigarh | |||
| University Institute of Engineering & Technology | |||
| supply of Tube Luminometer | 26-02-2013 | 06-03-2013 at 16:00 | 07-03-2013 at 11:00 |
| Sealed tenders are invited from the manufactures/authorized dealers for the supply of Tube Luminometer (equipments) for UIET, Biotechnology branch. | |||
| University Institute of Engineering & Technology | |||
| Tube Luminometer (equipments) | 25-02-2013 | 06-03-2013 at 04:00 | 07-03-2013 at 11:00 |
| Sealed tenders are invited from the manufactures/authorized dealers for the supply of Tube Luminometer (equipments) for UIET, Biotechnology branch. | |||
| Registrar's Office | |||
| FOR SUPPLY OF FURNITURE for Administrative Block staff in Panjab University | 22-02-2013 | 07-03-2013 at 03:00 | 07-03-2013 at 03:00 |
| FOR SUPPLY OF FURNITURE for Administrative Block staff in Panjab University DATE & TIME OF OPENING: To be notified later | |||
| Sophisticated Analytical Instrumentation Facility, CIL and UCIM | |||
| For High Resolution FE-SEM with EDS | 22-02-2013 | 15-03-2013 at 03:00 | 15-03-2013 at 03:00 |
| for High Resolution FE-SEM with EDS Date & Time of Opening will be notified later Corrigendum: >Corrections in “Specifications for High Resolution FESEM with EDS ”: Corrections in “Specifications for High Resolution FESEM with EDS ” | |||
| Sophisticated Analytical Instrumentation Facility, CIL and UCIM | |||
| FOR the PURCHASE OF STEREOZOOM MICROSCOPE | 22-02-2013 | 15-03-2013 at 03:00 | 15-03-2013 at 03:00 |
| FOR the PURCHASE OF STEREOZOOM MICROSCOPE DATE & TIME OF OPENING: To be notified later Corrigendum: >SPECIFICATIONS FOR STEREOZOOM MICROSCOPE”: SPECIFICATIONS FOR STEREOZOOM MICROSCOPE” | |||
| Construction Office | |||
| P/L of GRC Tiles (6th & 7th storey) for Construction of Boys Hostel No. 8 in P.U. South Campus | 22-02-2013 | 27-02-2013 at 03:30 | 27-02-2013 at 03:30 |
| P/L of GRC Tiles (6th & 7th storey) for Construction of Boys Hostel No. 8 in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Replacement of old switchgear and providing panel in Construction Office in Panjab University Campus | 27-02-2013 | 08-03-2013 at 03:30 | 08-03-2013 at 03:30 |
| Replacement of old switchgear and providing panel in Construction Office in Panjab University Campus, Sector 14 Chandigarh. | |||
| Construction Office | |||
| Estimate for Providing Electrical Installation Rewiring (Recessed type) in T-II type (6nos.) houses | 27-02-2013 | 08-03-2013 at 03:30 | 08-03-2013 at 03:30 |
| Estimate for Providing Electrical Installation Rewiring (Recessed type) in T-II type (6nos.) houses in Panjab University South Campus, Sector-25, Chandigarh | |||
| Dr. S. S. Bhatnagar University Institute of Chemical Engineering & Technology | |||
| TENDER DOCUMENT FOR PURCHASE OF EQUIPMENTS (DYNAMIC RHEOMETER AND ZETASIZER) | 15-02-2013 | 08-03-2013 at 15:00 | 11-03-2013 at 15:00 |
| TENDER DOCUMENT FOR PURCHASE OF EQUIPMENTS (DYNAMIC RHEOMETER AND ZETASIZER) | |||
| Construction Office | |||
| Maintenance of Public Health in non-residential buildings(Arts Block) in Panjab University Campus, | 14-02-2013 | 21-02-2013 at 03:30 | 21-02-2013 at 03:30 |
| Maintenance of Public Health in non-residential buildings(Arts Block) in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Constructions of extension counter of bank in the existing building to install ATM | 18-02-2013 | 22-02-2013 at 03:30 | 22-02-2013 at 03:30 |
| Constructions of extension counter of bank in the existing building to install ATM and to create strong room for the bank at SSGPURC, Hoshiarpur (Pb). | |||
| Dean Students Welfare | |||
| Quotations for purchase the printing paper of Campus Reporter 2012-2013 | 14-02-2013 | 28-02-2013 at 05:00 | 28-02-2013 at 05:00 |
| 1. Paper for text 20” x 30”/80 GSM Maplitho paper : 230 Reams Ballarpur/H.P.C. make 2. Paper for Messages 20” x 30”/100 GSM Art paper : 35 Reams 3. Paper for Cover 23” x 36”/250 GSM Art card : 3 Reams Date of Opening of Quotations will be announced later on | |||
| Dean Students Welfare | |||
| Quotations for Colour printing for campus reporter | 14-02-2013 | 28-02-2013 at 05:00 | 28-02-2013 at 05:00 |
| 1. Printing of 20x 30/8 Colour set with 8 pages or 15” x 20”/4 pages quantity 5000 paper supply by the Department. 2. Printing of Title pages on 18x23/4 size with lamination quantity 5000. Date of Opening of Quotations will be announced later on | |||
| Dr. S. S. Bhatnagar University Institute of Chemical Engineering & Technology | |||
| FOR THE PURCHASE OF DYNAMIC RHEOMETER BET SURFACE AREA AND PORE SIZE DISTRIBUTION ANALYZER | 06-02-2013 | 26-02-2013 at 03:00 | 27-02-2013 at 03:00 |
| FOR THE PURCHASE OF i) DYNAMIC RHEOMETER ii) BET SURFACE AREA AND PORE SIZE DISTRIBUTION ANALYZER | |||
| Construction Office | |||
| Exterior and Interior Painting at UIET building block no. 1 in Panjab University Campus Sector-25, | 18-02-2013 | 21-02-2013 at 03:30 | 21-02-2013 at 03:30 |
| Exterior and Interior Painting at UIET building block no. 1 in Panjab University Campus Sector-25, Chandigarh. | |||
| Construction Office | |||
| Exterior and Interior Painting at UIET building block no. 2 in Panjab University Campus Sector-25, | 18-02-2013 | 21-02-2013 at 03:30 | 21-02-2013 at 03:30 |
| Exterior and Interior Painting at UIET building block no. 2 in Panjab University Campus Sector-25, Chandigarh | |||
| Dr. S. S. Bhatnagar University Institute of Chemical Engineering & Technology | |||
| DYNAMIC RHEOMETER and BET SURFACE AREA AND PORE SIZE DISTRIBUTION ANALYZER | 05-02-2013 | 26-02-2013 at 15:00 | 27-02-2013 at 15:00 |
| DYNAMIC RHEOMETER and BET SURFACE AREA AND PORE SIZE DISTRIBUTION ANALYZER | |||
| Construction Office | |||
| Providing and Fixing of Pressed Steel Frames for the construction of Building of Hostel for Intern | 08-02-2013 | 12-02-2013 at 03:30 | 12-02-2013 at 03:30 |
| Providing and Fixing of Pressed Steel Frames for the construction of Building of Hostel for International Students and Research Schollars in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| P/F of Study Table for The Construction/Extension of Girls Hostel No. 9 (2nd phase) in P.U. South | 08-02-2013 | 12-02-2013 at 03:30 | 12-02-2013 at 03:30 |
| P/F of Study Table for The Construction/Extension of Girls Hostel No. 9 (2nd phase) in P.U. South Campus, Chandigarh. | |||
| Construction Office | |||
| Outsourcing the work of Landscaping & Maintenance of Parks and Open Spaces of Residential Complex | 08-02-2013 | 22-02-2013 at 03:30 | 22-02-2013 at 03:30 |
| Outsourcing the work of Landscaping & Maintenance of Parks and Open Spaces of Residential Complex, Sector-25, Panjab University, Chandigarh | |||
| Construction Office | |||
| For Supply of One no. Ride-on -Roller | 06-02-2013 | 20-02-2013 at 03:30 | 20-02-2013 at 03:30 |
| For Supply of One no. Ride-on -Roller | |||
| Construction Office | |||
| Quotations of Various Items | 28-01-2013 | 05-02-2013 at 03:30 | 05-02-2013 at 03:30 |
| Quotations of Various Items Date of Opening of Quotations will be announced later on | |||
| Construction Office | |||
| Providing and Laying of Pre-coated Aluminium Sheets for The Const. of 10 Mts Indoor Shooting rang | 28-01-2013 | 30-01-2013 at 03:30 | 30-01-2013 at 03:30 |
| Providing and Laying of Pre-coated Aluminium Sheets for The Construction of 10 Meters Indoor Shooting Range in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| P/F of W.S. & S.I. for the 2nd Block of Construction of Girls Hostel No. 9 (2nd floor to 6th floor | 30-01-2013 | 01-02-2013 at 03:30 | 01-02-2013 at 03:30 |
| P/F of W.S. & S.I. for the 2nd Block of Construction of Girls Hostel No. 9 (2nd floor to 6th floor) in P.U. South Campus, Chandigarh. | |||
| Construction Office | |||
| Providing and fixing Paver Blocks with kerbs for development of Park in Residential Area | 06-02-2013 | 20-02-2013 at 03:30 | 20-02-2013 at 03:30 |
| Providing and fixing Paver Blocks with kerbs for development of Park in Residential Area near Mori Gate, Panjab University Campus, Sector-14, Chandigarh Date of Opening of Tenders will be announced later on | |||
| Dr. S. S. Bhatnagar University Institute of Chemical Engineering & Technology | |||
| Tender Document For Purchase Of Equipments | 25-01-2013 | 13-02-2013 at 15:00 | 18-02-2013 at 15:00 |
| Tender Document For Purchase Of Equipments | |||
| Construction Office | |||
| Providing Lighting arrangement on the Approach Road to Gurudwara and Mandir in P.U. | 23-01-2013 | 29-01-2013 at 03:30 | 29-01-2013 at 03:30 |
| Providing Lighting arrangement on the Approach Road to Gurudwara and Mandir in Panjab University Campus, Sector 14 Chandigarh. | |||
| Construction Office | |||
| Providing Electrical Installation Rewiring (Recessed Type) of Toilets in A Type houses (60 nos.) (1- | 23-01-2013 | 29-01-2013 at 03:30 | 29-01-2013 at 03:30 |
| Providing Electrical Installation Rewiring (Recessed Type) of Toilets in A Type houses (60 nos.) (1-60) in Panjab University Campus, Sector 14 Chandigarh. | |||
| Construction Office | |||
| Replacement of old switchgear and providing panel in Construction Office in Panjab University Campus | 28-01-2013 | 04-02-2013 at 03:30 | 04-02-2013 at 03:30 |
| Replacement of old switchgear and providing panel in Construction Office in Panjab University Campus, Sector 14 Chandigarh. | |||
| Construction Office | |||
| Various items of Furniture | 22-01-2013 | 31-01-2013 at 03:30 | 31-01-2013 at 03:30 |
| Supply of furniture for the University Constituent Colleges at Balachaur (Nawanshaher), Nihal Singhwala (Moga), Guru Har Sahai (Ferozepur) and Sikhwala (Muktsar). Corrigendum: >Corrigendum: furniture for the University Constituent Colleges: Tenders for supply of Institutional Furniture items for Panjab University Constituent colleges due on 31.01.2013. | |||
| Construction Office | |||
| Maintenance of lawns and hedges and all other plants within the boundary walls of 22 Nos. houses | 22-01-2013 | 30-01-2013 at 03:30 | 30-01-2013 at 03:30 |
| Maintenance of lawns and hedges and all other plants within the boundary walls of 22 Nos. type-I and 9 Nos. F-type houses and also the road berms in front of these houses in Panjab University Campus, Sector-25,Chandigarh. Date of Opening of Tenders will be announced later on | |||
| Construction Office | |||
| Providing Electrical Installation Rewiring (Recessed type) in A Type houses 27 nos. in P. U. | 17-01-2013 | 24-01-2013 at 03:30 | 24-01-2013 at 03:30 |
| Providing Electrical Installation Rewiring (Recessed type) in A Type houses 27 nos. in Panjab University Campus, Sector-14 and South Campus, Sector-25, Chandigarh | |||
| Construction Office | |||
| Providing Electrical Installation Rewiring (Recessed type) in E-1 Type (12 nos.) houses in P. U. | 17-01-2013 | 24-01-2013 at 03:30 | 24-01-2013 at 03:30 |
| Providing Electrical Installation Rewiring (Recessed type) in E-1 Type (12 nos.) houses in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing replacement of old switchgear and providing panel in Arts Block 2, 3, 4 (remaining work) i | 17-01-2013 | 24-01-2013 at 03:30 | 24-01-2013 at 03:30 |
| Providing replacement of old switchgear and providing panel in Arts Block 2, 3, 4 (remaining work) in Panjab University Campus, Sector 14 Chandigarh. | |||
| Construction Office | |||
| P/L Structural Glazing, False Ceiling, Water Proofing etc. for the Construction/Extenstion | 16-01-2013 | 21-01-2013 at 03:30 | 21-01-2013 at 03:30 |
| P/L Structural Glazing, False Ceiling, Water Proofing etc. for the Construction/Extenstion of (2nd phase) of University Institute of Hotel Management & Tourism in P.U. Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| P/F W.S. & S.I. for the 1st Block (2nd floor to 6th floor) for the Construction of Girl Hostel No. 9 | 16-01-2013 | 21-01-2013 at 03:30 | 21-01-2013 at 03:30 |
| P/F W.S. & S.I. for the 1st Block (2nd floor to 6th floor) for the Construction of Girls Hostel No. 9 in P.U. South Campus, Chandigarh. | |||
| Construction Office | |||
| P/F G.R.C. Tiles, Structural Glazing etc. for the Construction of (2nd phase) of Women Sports Hostel | 16-01-2013 | 21-01-2013 at 03:30 | 21-01-2013 at 03:30 |
| P/F G.R.C. Tiles, Structural Glazing etc. for the Construction of (2nd phase) of Women Sports Hostel in P.U. Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| P/F G.R.C. Tiles for the Construction/Extenstion of (2nd phase) of UIHMT | 16-01-2013 | 21-01-2013 at 03:30 | 21-01-2013 at 03:30 |
| P/F G.R.C. Tiles for the Construction/Extenstion of (2nd phase) of University Institute of Hotel Management & Tourism in P.U. Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Environmental Clearance for Construction of 20 nos. Houses Type-I (four storey) in P.U. South Campus | 15-01-2013 | 21-01-2013 at 03:30 | 21-01-2013 at 03:30 |
| Environmental Clearance for Construction of 20 nos. Houses Type-I (four storey) in P.U. South Campus, Chandigarh and Construction of 20 nos. Houses Type-III(four storey) from State Environmental Impact Assessment Authority, Chandigarh | |||
| Construction Office | |||
| Various Tenders | 30-01-2013 | 04-02-2013 at 03:30 | 04-02-2013 at 03:30 |
| Various Tenders | |||
| Construction Office | |||
| P/F of False Ceiling for the Building of 10 Meters Indoor Shooting Range in P.U. Campus, Sector-14 | 02-01-2013 | 04-01-2013 | 04-01-2013 |
| P/F of False Ceiling for the Building of 10 Meters Indoor Shooting Range in P.U. Campus, Sector-14, Chandigarh | |||
| Establishment Branch | |||
| EMPANELMENT OF ADVERTISING AGENCIES | 11-01-2013 | 21-01-2013 at 05:00 | 21-01-2013 at 05:00 |
| Applications are invited from Advertising Agencies (INS Accredited) for empanelment Date of Opening of Applications will be announced later on | |||
| Construction Office | |||
| P/L of L.T. cables for connecting U.I.A.M.S. / Alumini House Buildings with 11 K.V. Substation | 02-01-2013 | 04-01-2013 at 03:30 | 04-01-2013 at 03:30 |
| P/L of L.T. cables for connecting U.I.A.M.S. / Alumini House Buildings with 11 K.V. Substation & making provision of Auto change over switch for bearing the electricity load of U.I.E.T. B-2/Workshop in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Providing Lighting Arrangement on the Approach Road to Music Deptt. in P. U. Campus Sector-14 | 11-01-2013 | 17-01-2013 at 03:30 | 17-01-2013 at 03:30 |
| Providing Lighting Arrangement on the Approach Road to Music Deptt. in Panjab University Campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing of Flood lights & High mast poles in Park near 'C' type houses in Panjab University Campus | 11-01-2013 | 17-01-2013 at 03:30 | 17-01-2013 at 03:30 |
| Providing of Flood lights & High mast poles in Park near 'C' type houses in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Submain Cables/ Distribution Boards in Boys Hostel no. 4 in P. U. campus Sector-14 | 11-01-2013 | 17-01-2013 at 03:30 | 17-01-2013 at 03:30 |
| Providing Submain Cables/ Distribution Boards in Boys Hostel no. 4 in Panjab University campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing Main/Submain cables and Panels in Boys Hostel No. 7, in P. U. Campus, Sector-14 | 11-01-2013 | 17-01-2013 at 03:30 | 17-01-2013 at 03:30 |
| Providing Main/Submain cables and Panels in Boys Hostel No. 7, in Panjab University Campus, Sector-14, Chandigarh. | |||
| Registrar's Office | |||
| TENDER DOCUMENT FOR INSTALLATION AND MAINTENANCE OF CCTV SURVEILLANCE SYSTEM | 05-01-2013 | 28-01-2013 at 15:00 | 28-01-2013 at 15:15 |
| TENDER DOCUMENT FOR INSTALLATION AND MAINTENANCE OF CCTV SURVEILLANCE SYSTEM Corrigendum: >Corrigendum to CCTV tender: Item : IP PTZ Camera: 36x or better instead of 37x Zoom/ 37x Installation of Cameras include required software as per specifications of Cameras/DVR | |||
| Construction Office | |||
| Re-flooring of the building of the Department of Gandhian Studies in Panjab University Campus Sect | 04-01-2013 | 10-01-2013 at 03:30 | 10-01-2013 at 03:30 |
| Re-flooring of the building of the Department of Gandhian Studies in Panjab University Campus Sector-14, Chandigarh | |||
| A. C. Joshi Library | |||
| Tender For Sale Of Waste Paper, Marked Answer Books | 24-12-2012 | 18-01-2013 at 14:30 | 18-01-2013 at 15:00 |
| Tender For Sale Of Waste Paper, Marked Answer Books | |||
| Construction Office | |||
| Up gradation of water supply (From C to E-I type houses) in Panjab University Campus Sector-14 Ch | 28-12-2012 | 03-01-2013 at 03:30 | 03-01-2013 at 03:30 |
| Up gradation of water supply (From C to E-I type houses) in Panjab University Campus Sector-14 Chandigarh | |||
| Construction Office | |||
| Additions/Alterations at level-1 in Panjab University holiday home Dingle Estate, Shimla. | 26-12-2012 | 31-12-2012 at 03:30 | 31-12-2012 at 03:30 |
| Additions/Alterations at level-1 in Panjab University holiday home Dingle Estate, Shimla. | |||
| Construction Office | |||
| Construction of retaining wall in P.U teachers holiday home (Three bridge building) Shimla (H.P.) | 20-12-2012 | 27-12-2012 at 03:30 | 27-12-2012 at 03:30 |
| Construction of retaining wall in P.U teachers holiday home (Three bridge building) Shimla (H.P.) | |||
| Construction Office | |||
| Fabrication of 8 Nos Aluminium Cabin in UIET Workshop in Panjab University, South Campus Sector-25 | 21-12-2012 | 28-12-2012 at 03:30 | 28-12-2012 at 03:30 |
| Fabrication of 8 Nos Aluminium Cabin in UIET Workshop in Panjab University, South Campus Sector-25, Chandigarh | |||
| Construction Office | |||
| Construction of roads in residential area behind store in Panjab University | 24-12-2012 | 31-12-2012 at 03:30 | 31-12-2012 at 03:30 |
| Construction of roads in residential area behind store in Panjab University | |||
| Construction Office | |||
| Ramp (for the use of physical challenged persons) at entrance of construction office in P.U. | 26-11-2012 | 30-11-2012 at 03:30 | 30-11-2012 at 03:30 |
| Ramp (for the use of physical challenged persons) at entrance of construction office in Panjab University Campus Sector-14, Chandigarh Note: Opening date may be later decided by JPC. | |||
| Construction Office | |||
| Raising of Boundary wall at S.S.G.P.U. Regional Centre in Hoshiarpur. | 04-12-2012 | 10-12-2012 at 03:30 | 10-12-2012 at 03:30 |
| Raising of Boundary wall at S.S.G.P.U. Regional Centre in Hoshiarpur. | |||
| Construction Office | |||
| P/F of W.S. & S.I. work for 3rd block for The Construction of Girls Hostel No. 9 in P.U. South Cam | 23-11-2012 | 29-11-2012 at 03:30 | 29-11-2012 at 03:30 |
| P/F of W.S. & S.I. work for 3rd block for The Construction of Girls Hostel No. 9 in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Construction/ Extension Portion (Stair Case) of Statistics In P.U. Campus, Sector-14, Chandigarh | 30-11-2012 | 04-12-2012 at 03:30 | 04-12-2012 at 03:30 |
| Construction/ Extension Portion (Stair Case) of Statistics In P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing and laying Paver Tiles for front passage and back entry to hall towards Maths Dept. | 23-11-2012 | 29-11-2012 at 03:30 | 29-11-2012 at 03:30 |
| Providing and laying Paver Tiles for front passage and back entry to hall towards Mathematics Deptt. For Examination Hall Building in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Up gradation of water supply (From C to E-I type houses) in Panjab University Campus Sector-14 | 03-12-2012 | 07-12-2012 at 03:30 | 07-12-2012 at 03:30 |
| Up gradation of water supply (From C to E-I type houses) in Panjab University Campus Sector-14 Chandigarh | |||
| Construction Office | |||
| Construction of Road Gullies in Panjab University Campus Sector-25 Chandigarh | 03-12-2012 | 07-12-2012 at 03:30 | 07-12-2012 at 03:30 |
| Construction of Road Gullies in Panjab University Campus Sector-25 Chandigarh | |||
| Bhai Ghanaiya Ji Institue of Health | |||
| AUCTION NOTICE of junk items (mainly iron/wooden/instruments) | 20-11-2012 | 05-12-2012 at 12:30 | 05-12-2012 at 12:30 |
| AUCTION NOTICE of junk items (mainly iron/wooden/instruments) | |||
| Construction Office | |||
| Providing Electrical Installation Work For The Construction of Girl Hostel 9 from (3rd to 6th floor) | 16-11-2012 | 20-11-2012 at 03:30 | 20-11-2012 at 03:30 |
| Providing Electrical Installation Work For The Construction of Girls Hostel No. 9 from (3rd floor to 6th floor) in P.U. South Campus, Chandigarh | |||
| Bhai Ghanaiya Ji Institue of Health | |||
| Expression of interest from hospitals | 09-11-2012 | 26-11-2012 | 26-11-2012 |
| Panjab University, a leading educational institution is inviting expression of interest from hospitals having bed strength of not less than 25, and other ophthalmological and other hospitals/ health centers providing day care procedures, for empanelment to provide treatment at the rates approved by the University to its beneficiaries including students, faculty, staff, retired employees and their eligible dpendents, totalling about 25,000 (approx). | |||
| Bhai Ghanaiya Ji Institue of Health | |||
| Expression of interest from hospitals for FIX PACKAGES FOR WHICH EMPANELMENT IS PROPOSED. | 31-10-2012 | 20-11-2012 at 05:00 | 20-11-2012 at 05:00 |
| Expression of interest from hospitals for FIX PACKAGES FOR WHICH EMPANELMENT IS PROPOSED. Date of Opening of Expression of interest will be announced later on | |||
| Construction Office | |||
| P/L of Marble Flooring / Vitrified Tiles / Water Proofing Treatment & Stainless Steel Railing for | 01-11-2012 | 02-11-2012 at 03:30 | 02-11-2012 at 03:30 |
| P/L of Marble Flooring / Vitrified Tiles / Water Proofing Treatment & Stainless Steel Railing for the construction of 10 Meters Indoor Shooting Range in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Up-gradation of Water Supply System in Panjab University Campus Sector-25 Chandigarh | 07-11-2012 | 07-11-2012 at 03:30 | 07-11-2012 at 03:30 |
| Up-gradation of Water Supply System in Panjab University Campus Sector-25 Chandigarh | |||
| Construction Office | |||
| Up gradation of water supply (From C to E-I type houses) in Panjab University Campus Sector-14 Ch | 07-11-2012 | 09-11-2012 at 03:30 | 09-11-2012 at 03:30 |
| Up gradation of water supply (From C to E-I type houses) in Panjab University Campus Sector-14 Chandigarh | |||
| Construction Office | |||
| Construction of Road Gullies in Panjab University Campus Sector-25 Chandigarh | 07-11-2012 | 09-11-2012 at 03:30 | 09-11-2012 at 03:30 |
| Construction of Road Gullies in Panjab University Campus Sector-25 Chandigarh | |||
| Construction Office | |||
| Renovation of Faculty House (2nd phase) in Panjab University Campus, Sector-14, Chandigarh. | 06-11-2012 | 08-11-2012 at 03:30 | 08-11-2012 at 03:30 |
| Renovation of Faculty House (2nd phase) in Panjab University Campus, Sector-14, Chandigarh. | |||
| Department of Physics | |||
| TENDER DOCUMENT FOR THE PURCHASE OF MICRO ANALYTICAL BALANCE | 27-10-2012 | 15-11-2012 at 15:30 | 16-11-2012 at 15:30 |
| TENDER DOCUMENT FOR THE PURCHASE OF MICRO ANALYTICAL BALANCE | |||
| Construction Office | |||
| Providing Air Conditioners in Auditorium of USOL Department in Panjab University Campus, Sector-14, | 31-10-2012 | 05-11-2012 at 03:30 | 05-11-2012 at 03:30 |
| Providing Air Conditioners in Auditorium of USOL Department in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Construction of boundary wall around various categories of houses in Panjab University Sector-25, Ch | 30-10-2012 | 02-11-2012 at 03:30 | 02-11-2012 at 03:30 |
| Construction of boundary wall around various categories of houses in Panjab University Sector-25, Chandigarh. | |||
| Construction Office | |||
| Construction of pavement area in U.I.E.T in Panjab University, Sector-25 Chandigarh. | 01-11-2012 | 05-11-2012 at 03:30 | 05-11-2012 at 03:30 |
| Construction of pavement area in U.I.E.T in Panjab University, Sector-25 Chandigarh. | |||
| Dean Students Welfare | |||
| Quotations of purchase of Furniture Wooden Boxes Bed & Steel Almirah | 15-10-2012 | 18-10-2012 at 05:00 | 18-10-2012 at 05:00 |
| Quotations of purchase of Furniture Wooden Boxes Bed & Steel Almirah for P.U. Hostels & DSW office for the session 2012-2013 Date of Opening of Quotations will be announced later on | |||
| Construction Office | |||
| Renovation of lab no. 16 instrument room no 22 and instrument room no 25 A UIPS | 22-10-2012 | 30-10-2012 at 03:30 | 30-10-2012 at 03:30 |
| Renovation of lab no. 16 instrument room no 22 and instrument room no 25 A (Pharmaceutical Department) at UIPS in Panjab University Campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Renovation of Lab no. 38 in Pharmacy Department in P.U. Campus Sector -14, Chandigarh | 22-10-2012 | 30-10-2012 at 03:30 | 30-10-2012 at 03:30 |
| Renovation of Lab no. 38 in Pharmacy Department in P.U. Campus Sector -14, Chandigarh | |||
| Construction Office | |||
| Renovation of toilets (ladies/Gents) at U.B.S. deptt. of P.U. Campus, Sector-14, Chandigarh | 19-10-2012 | 26-10-2012 at 03:30 | 26-10-2012 at 03:30 |
| Renovation of toilets (ladies/Gents) at U.B.S. deptt. of P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing and Laying of vitrified floor & wall tiles for construction of centre of Emerging Areas | 10-10-2012 | 12-10-2012 at 03:30 | 12-10-2012 at 03:30 |
| Providing and Laying of vitrified floor & wall tiles for construction of centre of Emerging Areas in Science and Technology for (Block- III) in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Addition/Alteration work for Emerging Area in Social Sciences in P.U. Campus, Sector-14, Chandiga | 05-10-2012 | 09-10-2012 at 03:30 | 09-10-2012 at 03:30 |
| Addition/Alteration work for Emerging Area in Social Sciences in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| P/F of Dholpur Sand Stone and Red Agra Stone on the outer surface of building of College Bhawan in | 15-10-2012 | 18-10-2012 at 03:30 | 18-10-2012 at 03:30 |
| P/F of Dholpur Sand Stone and Red Agra Stone on the outer surface of building of College Bhawan in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing and Laying of vitrified floor & wall tiles for construction of centre of Emerging Areas | 10-10-2012 | 12-10-2012 at 03:30 | 12-10-2012 at 03:30 |
| Providing and Laying of vitrified floor & wall tiles for construction of centre of Emerging Areas in Science and Technology for (Block- II) in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| S/F of Sand and fixing of Dholpur Sand Stone for the building of 10 meters shooting range in P.U. | 15-10-2012 | 18-10-2012 at 03:30 | 18-10-2012 at 03:30 |
| S/F of Sand and fixing of Dholpur Sand Stone for the building of 10 meters shooting range in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing Electrical Installation (i.e. Wiring/Rewiring) in Sports Store & Toilets in Univ ground | 12-10-2012 | 22-10-2012 at 03:30 | 22-10-2012 at 03:30 |
| Providing Electrical Installation (i.e. Wiring/Rewiring) in Sports Store & Toilets in university grounds in Panjab University Campus, Sector-14, Chandigarh | |||
| Directorate of Sports | |||
| TENDER fOR Machines for Physiotherapy Centre | 01-10-2012 | 17-10-2012 at 12:00 | 17-10-2012 at 12:30 |
| 1. Examination Couch/plinth 4 nos. 2. Manual Therapy Plinth 1 no. 3. Combination Therapy Unit 1 no. 4. Quadriceps Table(international electro medical co.) 1 No. | |||
| Construction Office | |||
| Construction of boundary wall around various categories of houses in Panjab University Sector-25, | 08-10-2012 | 12-10-2012 at 03:30 | 12-10-2012 at 03:30 |
| Construction of boundary wall around various categories of houses in Panjab University Sector-25, Chandigah | |||
| Construction Office | |||
| Providing and Laying 40mm thick Semidence Bitumanstic topping on existing road and parking for Par | 08-10-2012 | 12-10-2012 at 03:30 | 12-10-2012 at 03:30 |
| Providing and Laying 40mm thick Semidence Bitumanstic topping on existing road and parking for Paramedical Science Block no.-2 in P.U. South Campus P.U. Chandigarh. | |||
| Construction Office | |||
| Ramp (for the use of physical challenged persons) at entrance of construction office in Panjab Univ | 27-09-2012 | 05-10-2012 at 03:30 | 05-10-2012 at 03:30 |
| Ramp (for the use of physical challenged persons) at entrance of construction office in Panjab University Campus Sector-14, Chandigarh Date of Opening of Quotations will be announced later on | |||
| Construction Office | |||
| Construction of Boundary wall around Boys Hostel No. 5 in P. U. Campus, Sector-14, Chandigarh. | 08-10-2012 | 12-10-2012 at 03:30 | 12-10-2012 at 03:30 |
| Construction of Boundary wall around Boys Hostel No. 5 in P. U. Campus, Sector-14, Chandigarh. Corrigendum: >Construction of boundary wall: Construction of boundary wall around various categories of houses in P.U.Sector25, instead of Construction of Boundary wall around Boys Hostel No. 5 in P. U. Campus | |||
| Construction Office | |||
| Providing and Laying 40mm thick Semidence Bitumanstic topping on existing road and parking | 08-10-2012 | 12-10-2012 at 03:30 | 12-10-2012 at 03:30 |
| Providing and Laying 40mm thick Semidence Bitumanstic topping on existing road and parking for Dental Hospital in P.U. South Campus P.U. Chandigarh . | |||
| Construction Office | |||
| Providing and Laying 40mm thick Semidence Bitumanstic topping on existing road and parking | 08-10-2012 | 12-10-2012 at 03:30 | 12-10-2012 at 03:30 |
| Providing and Laying 40mm thick Semidence Bitumanstic topping on existing road and parking for Paramedical Science Block no.-1 in P.U. South Campus P.U. Chandigarh. | |||
| Construction Office | |||
| S/I/T/C of Fire Fighting Hydrant System at UIAMS Building in P.U. South Campus, Chandigarh | 01-10-2012 | 04-10-2012 at 03:30 | 04-10-2012 at 03:30 |
| S/I/T/C of Fire Fighting Hydrant System at UIAMS Building in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Renovation/Furnishing of House No. H-I in Panjab University Campus Sector-14, Chandigarh | 26-09-2012 | 28-09-2012 at 03:30 | 28-09-2012 at 03:30 |
| Renovation/Furnishing of House No. H-I in Panjab University Campus Sector-14, Chandigarh | |||
| A. C. Joshi Library | |||
| P/F of Red Agra Stone/Dholpur Stone for the construction of 10 meters shooting range in P.U. Campus, | 26-09-2012 | 28-09-2012 at 03:30 | 28-09-2012 at 03:30 |
| P/F of Red Agra Stone/Dholpur Stone for the construction of 10 meters shooting range in P.U. Campus, Sector-14, Chandigarh | |||
| A. C. Joshi Library | |||
| P/L of GRC Tiles for Construction of vertical extenstion of Boys Hostel No. 8 (IInd Phase) in P.U. | 12-09-2012 | 14-09-2012 at 03:30 | 14-09-2012 at 03:30 |
| P/L of GRC Tiles for Construction of vertical extenstion of Boys Hostel No. 8 (IInd Phase) in P.U. South Campus, Chandigarh | |||
| Department of Microbiology | |||
| For the purchase of analytical cum semi preparative high pressure gradient HPLC system | 18-09-2012 | 01-10-2012 at 12:00 | 03-10-2012 at 12:00 |
| For the purchase of analytical cum semi preparative high pressure gradient HPLC system | |||
| Registrar's Office | |||
| TENDER FOR SUPPLY OF ANSWER BOOKS WITH OMR FRONT COVERED | 20-09-2012 | 17-10-2012 at 15:00 | 17-10-2012 at 16:00 |
| SUPPLYING OF ANSWER-BOOKS (36 & 40 PAGES) HAVING OMR FRONT COVER | |||
| Registration & Stores (R & S) | |||
| Stationary Items for PU | 10-09-2012 | 26-09-2012 | 26-09-2012 |
| Stationary Items for PU | |||
| Dean Students Welfare | |||
| quotation of old newspapers & magazines | 15-09-2012 | 24-09-2012 | 25-09-2012 |
| quotation of old newspapers & magazines | |||
| Construction Office | |||
| Outsourcing the work of Landscaping & Maintenance of Parks and Open Spaces of Residential Complex | 21-09-2012 | 04-10-2012 at 03:30 | 04-10-2012 at 03:30 |
| Outsourcing the work of Landscaping & Maintenance of Parks and Open Spaces of Residential Complex, Sector-25, Panjab University, Chandigarh Date of Opening of Tenders will be announced later on | |||
| Construction Office | |||
| Providing Air Conditioners in Auditorium of USOL Department in Panjab University campus, Sector-14, | 14-09-2012 | 26-09-2012 at 03:30 | 26-09-2012 at 03:30 |
| Providing Air Conditioners in Auditorium of USOL Department in Panjab University campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Electrical work in extension of Lab no.1 Room no. 33 Institute of Pharmaceutical Sciences in P.U. | 14-09-2012 | 18-09-2012 at 03:30 | 18-09-2012 at 03:30 |
| Electrical work in extension of Lab no.1 Room no. 33 Institute of Pharmaceutical Sciences in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Electrical installation of 4 nos.Air conditioner in Auditorium of Zoology Department in Pa | 05-09-2012 | 18-09-2012 | 18-09-2012 |
| Providing Electrical installation of 4 nos.Air conditioner in Auditorium of Zoology Department in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Creation of a Mechanical Lab (E.I work) in U.I.E.T in P.U. Campus, Sector-25 | 05-09-2012 | 18-09-2012 at 03:30 | 18-09-2012 at 03:30 |
| Creation of a Mechanical Lab (E.I work) in U.I.E.T in Panjab University Campus, Sector-25 and South Campus, Chandigarh | |||
| Construction Office | |||
| Providing street lighting around newly constructed T-1 complex in P.U., South Campus Sector 25 | 06-09-2012 | 18-09-2012 at 03:30 | 18-09-2012 at 03:30 |
| Providing street lighting around newly constructed T-1 complex in Panjab University, South Campus Sector – 25, Chandigarh. | |||
| Construction Office | |||
| Up-gradation of Water Supply System in Panjab University Campus Sector-25 Chandigarh. | 03-09-2012 | 07-09-2012 at 03:30 | 07-09-2012 at 03:30 |
| Up-gradation of Water Supply System in Panjab University Campus Sector-25 Chandigarh. | |||
| Construction Office | |||
| Up-gradation of Water Supply System in Panjab University Campus Sector-14 Chandigarh. | 03-09-2012 | 07-09-2012 at 03:30 | 07-09-2012 at 03:30 |
| Up-gradation of Water Supply System in Panjab University Campus Sector-14 Chandigarh. | |||
| Construction Office | |||
| Providing Air Conditioners in Auditorium of USOL Department in Panjab University campus | 31-08-2012 | 14-09-2012 at 03:30 | 14-09-2012 at 03:30 |
| Providing Air Conditioners in Auditorium of USOL Department in Panjab University campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Electrical Installation in PURSE Lab (Optical Lab), Library in Geology Department in P.U. | 31-08-2012 | 14-09-2012 at 03:30 | 14-09-2012 at 03:30 |
| Electrical Installation in PURSE Lab (Optical Lab), Library in Geology Department in Panjab University Campus Sector-14, Chandigarh. | |||
| Publication Bureau | |||
| Notice Inviting Quotations for printing and binding of the book | 24-08-2012 | 04-09-2012 at 05:00 | 04-09-2012 at 05:00 |
| Notice Inviting Quotations for printing and binding of the book Date of opening of Quotations will be communicating later | |||
| University Institute of Engineering & Technology | |||
| Notice for EMD Fees for Tenders of UIET | 22-08-2012 | 07-09-2012 | 07-09-2012 |
| Notice for EMD Fees for Tenders of UIET Date of Opening of Tenders will be announced later on | |||
| Construction Office | |||
| Renovation of Toilet/Bathroom 'E-I’ type houses in Panjab University Campus Sector-14 , Chandigarh. | 24-08-2012 | 31-08-2012 at 03:30 | 31-08-2012 at 03:30 |
| Renovation of Toilet/Bathroom 'E-I’ type houses in Panjab University Campus Sector-14 , Chandigarh. | |||
| Construction Office | |||
| Renovation of Toilet/Bathroom 'D' & ‘E’ type houses in P. U. Campus Sector-14 | 23-08-2012 | 30-08-2012 at 03:30 | 30-08-2012 at 03:30 |
| Renovation of Toilet/Bathroom 'D' & ‘E’ type houses in Panjab University Campus Sector-14 , Chandigarh. | |||
| Construction Office | |||
| Renovation of Toilet/Bathroom 'C’ type houses in Panjab University Campus Sector-14 , Chandigarh | 23-08-2012 | 30-08-2012 at 03:30 | 30-08-2012 at 03:30 |
| Renovation of Toilet/Bathroom 'C’ type houses in Panjab University Campus Sector-14 , Chandigarh | |||
| Construction Office | |||
| Renovation of Toilet/Bathroom 'T-II’ type houses in Panjab University Campus Sector-25 , Chandigarh | 24-08-2012 | 31-08-2012 at 03:30 | 31-08-2012 at 03:30 |
| Renovation of Toilet/Bathroom 'T-II’ type houses in Panjab University Campus Sector-25 , Chandigarh | |||
| Construction Office | |||
| Renovation of Toilet/Bathroom 'F’, ’G’ & ‘T-I’ type houses in P.U. University Campus Sector-14 & | 24-08-2012 | 31-08-2012 at 03:30 | 31-08-2012 at 03:30 |
| Renovation of Toilet/Bathroom 'F’, ’G’ & ‘T-I’ type houses in Panjab University Campus Sector-14 & 25, Chandigarh. | |||
| Construction Office | |||
| Renovation of Toilet/Bathroom 'A' & ‘B’ type houses in P. U Campus Sector-14 | 23-08-2012 | 30-08-2012 at 03:30 | 30-08-2012 at 03:30 |
| Renovation of Toilet/Bathroom 'A' & ‘B’ type houses in Panjab University Campus Sector-14 , Chandigarh. | |||
| Dean Students Welfare | |||
| Stationery articles and other material | 17-08-2012 | 23-08-2012 | 24-08-2012 |
| Stationery articles and other material | |||
| Construction Office | |||
| Provision of LT cable from transformers to pump house near gate no 2 in Panjab University Campus, | 14-08-2012 | 22-08-2012 at 03:30 | 22-08-2012 at 03:30 |
| Provision of LT cable from transformers to pump house near gate no 2 in Panjab University Campus, Sector-25, Chandigarh | |||
| University Institute of Engineering & Technology | |||
| THE SUPPLY OF Virtual Intrumention Lab-ECE | 06-08-2012 | 07-09-2012 at 11:00 | 07-09-2012 at 11:30 |
| THE SUPPLY OF VirTHE SUPPLY OF Virtual Intrumention Lab-ECEtual Intrumention Lab-ECE | |||
| University Institute of Engineering & Technology | |||
| THE SUPPLY OF Producation and Manufacturing -MECH | 06-08-2012 | 07-09-2012 at 11:00 | 07-09-2012 at 11:30 |
| THE SUPPLY OF Producation and Manufacturing -MECH | |||
| University Institute of Engineering & Technology | |||
| THE SUPPLY OF Multimedia Lab | 06-08-2012 | 07-09-2012 at 11:00 | 07-09-2012 at 11:30 |
| THE SUPPLY OF THE SUPPLY OF Multimedia LabMultimedia Lab THE SUPPLY OF Multimedia Lab | |||
| Dr. S. S. Bhatnagar University Institute of Chemical Engineering & Technology | |||
| THE SUPPLY OF Microelectronics Lab | 06-08-2012 | 07-09-2012 at 11:00 | 07-09-2012 at 11:30 |
| THE SUPPLY OF Microelectronics Lab THE SUPPLY OF Microelectronics Lab THE SUPPLY OF Microelectronics Lab | |||
| University Institute of Engineering & Technology | |||
| THE SUPPLY OF Furniture | 06-08-2012 | 07-09-2012 at 11:00 | 07-09-2012 at 11:30 |
| THE SUPPLY OF Furniture THE SUPPLTHE SUPPLY OF FurnitureY OF Furniture | |||
| University Institute of Engineering & Technology | |||
| THE SUPPLY OF Electric Trainer | 06-08-2012 | 07-09-2012 at 11:00 | 07-09-2012 at 11:30 |
| THE SUPPLY OF Electric Trainer THE SUPPLY OF Electric Trainer THE SUPPLY OF Electric Trainer | |||
| University Institute of Engineering & Technology | |||
| THE SUPPLY OF Electric Panels | 06-08-2012 | 07-09-2012 at 11:00 | 07-09-2012 at 11:30 |
| THE SUPPLY OF Electric Panels TEQIP-II/CH/CH1G01/19 THE SUPPLY OF Electric Panels | |||
| University Institute of Engineering & Technology | |||
| THE SUPPLY OF Desktop Computers | 06-08-2012 | 07-09-2012 at 11:00 | 07-09-2012 at 11:30 |
| THE SUPPLY OF Desktop Computers THE SUPPLY OF Desktop Computers THE SUPPLY OF Desktop Computers | |||
| University Institute of Engineering & Technology | |||
| PROCUREMENT OF EQUIPMENT | 06-08-2012 | 07-09-2012 at 11:00 | 07-09-2012 at 11:30 |
| PROCUREMENT OF EQUIPMENT PROCUREMENT OF EQUIPMENT PROCUREMENT OF EQUIPMENT | |||
| University Institute of Engineering & Technology | |||
| NATIONAL COMPETITIVE BIDDING PROCUREMENT OF EQUIPMENT | 06-08-2012 | 07-09-2012 at 11:00 | 07-09-2012 at 11:30 |
| PROCUREMENT OF EQUIPMENT PROCUREMENT OF EQUIPMENT PROCUREMENT OF EQUIPMENT | |||
| University Institute of Engineering & Technology | |||
| THE SUPPLY OF Analysis and motion simulation software- MECH | 06-08-2012 | 07-09-2012 at 11:00 | 07-09-2012 at 11:30 |
| THE SUPPLY OF Analysis and motion simulation software- MECH | |||
| University Institute of Engineering & Technology | |||
| TENDER DOCUMENT FOR PURCHASE OF SOFTWARE/EQUIPMENTS | 06-08-2012 | 07-09-2012 at 11:00 | 07-09-2012 at 11:30 |
| TENDER DOCUMENT FOR PURCHASE OF SOFTWARE/EQUIPMENTS | |||
| Construction Office | |||
| Tender Notice For Supply of One no. Ride-On Lawn Mover (Lawn Tractor) | 17-08-2012 | 29-08-2012 at 03:30 | 29-08-2012 at 03:30 |
| Tender Notice For Supply of One no. Ride-On Lawn Mover (Lawn Tractor) Date of opening of Tender will be communicating later Corrigendum: >For Supply of One no. RideOn Lawn Mover (Lawn Tractor): technical specifications may be read as following: 1. Engine power 450600 cc instead of 650700 cc 2. Engine net power 810 KW instead of 1012 KW All other specifications, termsconditions remain unchanged. | |||
| Dean Students Welfare | |||
| GROUP INSURANCE SCHEME FOR CAMPUS STUDENTS | 06-08-2012 | 14-08-2012 at 05:00 | 14-08-2012 at 05:00 |
| Benefits to be covered under the Group Insurance Scheme of students in case of death and partial disability for the session 2012-13 Date of opening of Quotations will be communicating later | |||
| Construction Office | |||
| Providing Air Conditioners in Auditorium of USOL Department in Panjab University campus, Sector-14 | 09-08-2012 | 23-08-2012 at 03:00 | 23-08-2012 at 03:00 |
| Providing Air Conditioners in Auditorium of USOL Department in Panjab University campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Electrical Installation in PURSE Lab (Optical Lab), Library in Geology Department in P.U. | 09-08-2012 | 23-08-2012 at 03:30 | 23-08-2012 at 03:30 |
| Electrical Installation in PURSE Lab (Optical Lab), Library in Geology Department in Panjab University Campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Quotation | 01-08-2012 | 13-08-2012 at 03:30 | 13-08-2012 at 03:30 |
| Quotation Due on 13.08.2012 at 3.30 P.M Date of opening of Quotations will be communicating later | |||
| Directorate of Sports | |||
| TENDER FOR SPORTS UNIFORM | 01-08-2012 | 16-08-2012 at 03:00 | 16-08-2012 at 03:30 |
| TENDER DOCUMENT SPORTS UNIFORM Corrigendum: >The financial bids are to be submitted physically along with the tenders: The financial bids are to be submitted physically along with the tenders in the Directorate of Sports upto 16.8.2012 at 3.00 p.m. not through etendering as the tender is an open tender not etender. | |||
| Directorate of Sports | |||
| TENDER FOR SPORTS MEDALS | 01-08-2012 | 16-08-2012 at 03:00 | 16-08-2012 at 03:30 |
| TENDER DOCUMENT SPORTS MEDALS Corrigendum: >The financial bids are to be submitted physically along with the tenders: The financial bids are to be submitted physically along with the tenders in the Directorate of Sports upto 16.8.2012 at 3.00 p.m. not through etendering as the tender is an open tender not etender. | |||
| Directorate of Sports | |||
| TENDER FOR SPORTS EQUIPMENT | 01-08-2012 | 16-08-2012 at 03:00 | 16-08-2012 at 03:30 |
| TENDER DOCUMENT FOR SPORTS EQUIPMENT Corrigendum: >The financial bids are to be submitted physically along with the tenders: The financial bids are to be submitted physically along with the tenders in the Directorate of Sports upto 16.8.2012 at 3.00 p.m. not through etendering as the tender is an open tender not etender. | |||
| Directorate of Sports | |||
| TENDER FOR SPORTS UNIFORM (CAMPUS SPORTS) | 01-08-2012 | 16-08-2012 at 03:00 | 16-08-2012 at 03:30 |
| TENDER FOR SPORTS UNIFORM (CAMPUS SPORTS) Corrigendum: >The financial bids are to be submitted physically along with the tenders: The financial bids are to be submitted physically along with the tenders in the Directorate of Sports upto 16.8.2012 at 3.00 p.m. not through etendering as the tender is an open tender not etender. | |||
| Directorate of Sports | |||
| TENDER FOR SPORTS EQUIPMENTS (Campus Section) | 01-08-2012 | 16-08-2012 at 03:00 | 16-08-2012 at 03:30 |
| TENDER FOR SPORTS EQUIPMENTS (Campus Section) Description of Items Shoes ,Hockey Shoes, Football Shoes, Cricket Bat, Water polo Balls, Hockey Shin Guard, Cricket Helmet, Cricket Mat (Full Size), Cricket Mat (Half) ,Volleyball Balls, Hockey Balls, Cricket Kit Bag, Cricket Batting Gloves, Softball Balls, Baseball Balls, Shuttle Cock, Squash Balls Archery Arrows , Plastic Tables, Korfball Basket Tennis Balls, Tennis Racket Corrigendum: >The financial bids are to be submitted physically along with the tenders: The financial bids are to be submitted physically along with the tenders in the Directorate of Sports upto 16.8.2012 at 3.00 p.m. not through etendering as the tender is an open tender not etender. | |||
| Construction Office | |||
| Providing street lighting arrangements in front of houses B (25-48) & B (103-108) in P.U. | 26-07-2012 | 09-08-2012 at 03:30 | 09-08-2012 at 03:30 |
| Providing street lighting arrangements in front of houses B (25-48) & B (103-108) in Panjab University Campus, Sector-14, Chandigarh. | |||
| Centre for Medical Physics (U.I.E.A.S.T.) | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS MEDICAL PHYSICS(BaF2 Detector System) | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS FOR MEDICAL PHYSICS(BaF2 Detector System) | |||
| Centre for Nanoscience & Nanotechnology (U.I.E.A.S.T.) | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS FOR NANOSCIENCE & NANOTECHNOLOGY(LB FILM) | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS FOR NANOSCIENCE & NANOTECHNOLOGY(LB FILM) | |||
| Centre for Nanoscience & Nanotechnology (U.I.E.A.S.T.) | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS OF NANOSCIENCE & NANOTECHNOLOGY(NANOVOLTMETER) | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| TENDER DOCUMENT FOR THE PROCUREMENT OF VARIOUS ITEMS OF NANOSCIENCE & NANOTECHNOLOGY(NANOVOLTMETER) | |||
| Sophisticated Analytical Instrumentation Facility, CIL and UCIM | |||
| TENDER FOR THE PROCUREMENT OF 25 Kwp Off - Grid Solar Photovoltaic Electric Power Plant | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| 25 Kwp Off - Grid Solar Photovoltaic Electric Power Plant .(Without Batteries) Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >Corrigendum FOR THE PROCUREMENT OF 25 Kwp Off Grid Solar Photovoltaic Electric Power Plant: TENDER DOCUMENT FOR THE PROCUREMENT OF 25 Kwp Off Grid Solar Photovoltaic Electric Power Plant | |||
| Sophisticated Analytical Instrumentation Facility, CIL and UCIM | |||
| TENDER FOR THE PROCUREMENT OF Multi – Color Bench Top High Speed Sorter Flow Cytometer Sysyem | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| Multi – Color Bench Top High Speed Sorter Flow Cytometer System Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >following corrections in “ Annexure A” of the main document of “Multi – Color Bench Top High Speed: following corrections in “ Annexure A” of the main document of “Multi – Color Bench Top High Speed Sorter Flow Cytometer System” | |||
| Sophisticated Analytical Instrumentation Facility, CIL and UCIM | |||
| TENDER FOR THE PROCUREMENT OF Laser scanning confocal microscope System | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| Laser scanning confocal microscope System Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >Corrigendum: Tenderers are required to make following corrections in Annexure A of the main tender document of Laser scanning confocal microscope System Corrigendum: >Corrections in “Annexure A” of the main tender document of “Laser scanning confocal microscope Syste: Tenderers are required to make following corrections in “Annexure A” of the main tender document of “Laser scanning confocal microscope System” | |||
| Stem Cell & Tissue Engineering | |||
| TENDER FOR THE PROCUREMENT OF Cell transaction instrument/Nucleofaction | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| Cell transaction instrument/Nucleofaction Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF Cell tranfection instrument/Nucleofaction: FOR THE PROCUREMENT OF Cell tranfection instrument/Nucleofaction | |||
| Department of Botany | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS(HPLC) | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| NAME OF ITEM: HIGH PRESSURE GRADIENT (HPLC) Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items Corrigendum: >Corrigendum For HPLC: Corrigendum For HPLC | |||
| Computer Centre | |||
| TENDER FOR THE PROCUREMENT OF ETHERNET SWITCHES | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| ITEM NO 1 Ethernet Switch Distribution Switch ITEM NO 2 Ethernet Switch Layer 3 switch ITEM NO 3: Ethernet Switch Layer 2 switch NAME OF ITEM: 10G SFP+ Transceiver NAME OF ITEM: SFP Transceiver NAME OF ITEM: LC-ST SM patch cords Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF ETHERNET SWITCHES: FOR THE PROCUREMENT OF ETHERNET SWITCHES | |||
| Dean Research Office | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS of ANIMAL HOUSE | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| NAME OF ITEM: Auto clave horizontal Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items | |||
| Institute of Forensic Science & Criminology | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS (Ultra pure Water System) | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| 1. For Complete Laboratory Ultra pure Water System from tap 2. Integrating Sphere attachment for UV-Vis Spectrophotometer (UV-2550 model, Shimazdu make) 3.Elisa Reader Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items | |||
| Department of Zoology | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS(TRINOCULAR SEMI AUTOMATED RESEARCH DIGITAL MICROSCOPE) | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| NAME OF ITEM: TRINOCULAR SEMI AUTOMATED RESEARCH DIGITAL MICROSCOPE WITH DIGITAL CAMERA AND IMAGE ANALYSER S/W Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items | |||
| University Institute of Pharmaceutical Sciences | |||
| FOR THE PROCUREMENT OF 1. UV VIS SPECTROPHOTOMETER 2. DIAPHRAGM PUMP 3. RECIRCULATING CHILLER | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| TENDER DOCUMENT FOR THE PROCUREMENT OF 1. UV VIS SPECTROPHOTOMETER 2. DIAPHRAGM PUMP 3. RECIRCULATING CHILLER / COOLER DEEP FREEZE Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items Corrigendum: >Corrigendum: UV VIS SPECTROPHOTOMETER: Corrigendum for UV VIS Spectrophotometer Corrigendum: >Corrigendum for the UV Spectrophotometer with research peltier system and integrating sphere.: Corrigendum for the specifications of UV Spectrophotometer with research peltier system and integrating sphere. | |||
| Department of Physics | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| NAME OF ITEM: Tender for Amplifiers (Timing Filter) – 3 Nos. (CANBERRA or ORTEC 474 (better or equivalent)) Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items | |||
| Department of Physics | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| NAME OF ITEM: Compute Nodes – 3 Nos. and accessories Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items | |||
| Department of Physics | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| TENDER FOR LaBr3(Ce) DETECTOR SYSTEM Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items | |||
| Centre for Microbial Biotechnology (U.I.E.A.S.T.) | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| NAME OF ITEM: ANALYTICAL CUM SEMI PREPARATIVE HIGH PRESSURE GRADIENT HPLC Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items | |||
| Department of Microbiology | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS | 20-07-2012 | 06-08-2012 | 07-08-2012 |
| NAME OF ITEM: Protein Purification System NAME OF ITEM: Lyophilizer +Accessories Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items | |||
| Institute of Forensic Science & Criminology | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| FOR ION CHROMATOGRAPHY Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items | |||
| Dr. Harvansh Singh Judge Institute of Dental Sciences & Hospital | |||
| TENDER FOR THE PURCHASE/FABRICATION OF MOBILE DENTAL VAN, EQUIPMENTS AND CONSUMABLE ITEMS | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| TENDER DOCUMENT FOR THE PURCHASE/FABRICATION OF MOBILE DENTAL VAN, EQUIPMENTS AND CONSUMABLE ITEMS Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >Addendum to Tender of Mobile Dental Van, EquipmentsConsumable Items: Addendum to tender to DR. Harvansh Singh Judge Institute of Dental SciencesHospital, Sector25, Panjab University, Chandigarh. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items Corrigendum: >(Corrigendum): In continuation of open press tender of Mobile Dental Van, EquipmentsConsumable Items of Dr. Harvansh Singh Judge Institute of Dental SciencesHospital, Sector25, Panjab University, Chandigarh, dated 20.7.2012 the following corrigendum | |||
| Sophisticated Analytical Instrumentation Facility, CIL and UCIM | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| for 160 KVA DIESEL GENERATING SET Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items | |||
| Sophisticated Analytical Instrumentation Facility, CIL and UCIM | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| FOR “CHN-S-O ORGANIC ELEMENTAL ANALYZER Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items | |||
| Sophisticated Analytical Instrumentation Facility, CIL and UCIM | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS(GC-MS/MS SPECTROMETER) | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| FOR GC-MS/MS SPECTROMETER Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items Corrigendum: >Tenderers are required to make following corrections in “ Annexure A” of the main document of GCMS: Tenderers are required to make following corrections in “ Annexure A” of the main document of GCMS/MS Instrument | |||
| Sophisticated Analytical Instrumentation Facility, CIL and UCIM | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| Various Chemicals Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items | |||
| Department of Chemistry | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS | 20-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| NAME OF ITEM: Fourier Transform Infrared Spectrophotometer Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF VARIOUS ITEMS: FOR THE PROCUREMENT OF VARIOUS ITEMS | |||
| Department of Anthropology | |||
| TENDER FOR THE PROCUREMENT OF VARIOUS ITEMS | 18-07-2012 | 06-08-2012 at 03:00 | 07-08-2012 at 11:00 |
| TENDER DOCUMENT FOR THE PROCUREMENT OF VARIOUS ITEMS ULTRASOUND BONE DENSITOMETER CM-200 Date & Time of opening of the Price bids in respective institutes/departments /centres: Consult the respective department. Corrigendum: >FOR THE PROCUREMENT OF various items: FOR THE PROCUREMENT OF various items | |||
| Swami Sarvanand Giri Regional Centre | |||
| Sealed quotations for canteen shop in the campus ofPANJAB UNIVERSITY SSG REGIONAL CENTRE, BAJWARA | 20-07-2012 | 10-08-2012 at 04:00 | 10-08-2012 at 04:00 |
| Sealed quotations are invited from interested parties/persons to run canteen shop in the campus on lease basis for 3 years. Date of opening of Quotations will be communicating later | |||
| Construction Office | |||
| Providing street lighting arrangements near main ground towards G.H. no. 4, 5 &7, in PU | 30-07-2012 | 07-08-2012 at 03:30 | 07-08-2012 at 03:30 |
| Providing street lighting arrangements near main ground towards G.H. no. 4, 5 &7, in Panjab University Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Air Conditioners in Auditorium of USOL Department in Panjab University campus, Sector-14, | 24-07-2012 | 30-07-2012 at 03:30 | 30-07-2012 at 03:30 |
| Providing Air Conditioners in Auditorium of USOL Department in Panjab University campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing flood lights in Arts Block no. 3,4,5,7, Fine Arts, Gandhian Studies, Law Department in Pu | 30-07-2012 | 07-08-2012 at 03:30 | 07-08-2012 at 03:30 |
| Providing flood lights in Arts Block no. 3,4,5,7, Fine Arts, Gandhian Studies, Law Department in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Provision of Additional ceiling fans & Replacement of old defective ceiling fans in Admin Office | 30-07-2012 | 07-08-2012 at 03:30 | 07-08-2012 at 03:30 |
| Provision of Additional ceiling fans & Replacement of old defective ceiling fans in Administrative office in Panjab University Sector-14, Chandigarh. | |||
| Legal & Estate | |||
| Auction Notice | 09-07-2012 | 26-07-2012 at 11:00 | 26-07-2012 at 11:00 |
| An open auction of Shop No. 2 situated in South Campus, Panjab University, Sector-25, Chandigarh will be held on 26-07-2012 at 11 A.M. in the Common Room (First Floor), Student Center, P.U. Chandigarh. | |||
| Construction Office | |||
| Various Tendors | 13-07-2012 | 13-08-2012 at 03:30 | 13-08-2012 at 03:30 |
| 1. Construction of 20 Nos. Houses Type-I (five Storey) in P.U. South Campus, Chandigarh 2. Construction of 20 Nos. Houses Type-III (five Storey) in P.U. South Campus, Chandigarh 3. Addition/ Alternation to the Existing building of Dental Institute for accommodation to P.G. course in P.U. South Campus, Chandigarh 4. Providing 8 passenger Elevator & Electrical Installation in lift well and machine room less with Buyback of Existing lift in A. C. Joshi Library in P.U. Campus, Sector-14, Chandigarh 5. Providing 8 passenger Elevator & Electrical Installation in lift well and machine room less Building of Emerging Area in Social Sciences in P.U. Campus, Sector-14, Chandigarh 6. Providing 8 passenger Elevator in lift well machine room less in Guru Teg Bahadur Bhawan Building in P.U. Campus, Sector-14, Chandigarh 7. Providing 8 passenger Elevator in lift well machine room less in Boys Hostel No. 8 in P.U. Campus, Sector-14, Chandigarh 8. Providing 8 passenger Elevator in lift well machine room less in Guest House Building in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| S/E/T/C of Ductable A.C. Unit Guru Teg Bahadur Bhawan Building In P.U. Campus, Sector-14, Chandigarh | 16-07-2012 | 20-07-2012 at 03:30 | 20-07-2012 at 03:30 |
| S/E/T/C of Ductable A.C. Unit with Eco Friendly Refrigerant Based Gas at Existing 1st Floor Of Guru Teg Bahadur Bhawan Building In P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Laying storm water line near Teacher flat in P.U. campus, Sector-14, Chandigarh | 18-07-2012 | 24-07-2012 at 03:30 | 24-07-2012 at 03:30 |
| Laying storm water line near Teacher flat in P.U. campus, Sector-14, Chandigarh | |||
| A. C. Joshi Library | |||
| Providing and Laying 40mm thick Semidence Bitumanastic topping on existing road and parking for Pa | 13-07-2012 | 19-07-2012 at 03:30 | 19-07-2012 at 03:30 |
| Providing and Laying 40mm thick Semidence Bitumanastic topping on existing road and parking for Paramedical Science Block no.-2 in P.U. South Campus P.U. Chandigarh. | |||
| Construction Office | |||
| Providing and Laying 40mm thick Semidence Bitumanastic topping on existing road and parking | 17-07-2012 | 24-07-2012 at 03:30 | 24-07-2012 at 03:30 |
| Providing and Laying 40mm thick Semidence Bitumanastic topping on existing road and parking for Paramedical Science Block no.-1 in P.U. South Campus P.U. Chandigarh | |||
| Construction Office | |||
| Various Tenders | 20-07-2012 | 30-07-2012 at 03:30 | 30-07-2012 at 03:30 |
| 1. Renovation of remaining portion of Account Branch (1st floor) at administrative block in Panjab University Campus Sector-14, Chandigarh. 2. Renovation of wash room/toilets in the AC Joshi Library in Panjab University Campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Renovation of Washrooms and Toilets Extension Building of Girls Hostel No. 4 (Kasturba Hall) | 17-07-2012 | 24-07-2012 at 03:30 | 24-07-2012 at 03:30 |
| Renovation of Washrooms and Toilets Extension Building of Girls Hostel No. 4 (Kasturba Hall) in Panjab University Sector- 14, Chandigarh. | |||
| A. C. Joshi Library | |||
| The supply of One no. Ride-On Lawn Mover (Lawn Tractor) | 27-06-2012 | 27-07-2012 at 03:30 | 27-07-2012 at 03:30 |
| “The machine has full control from driver’s seat with the help of LCD display, electromagnetic clutch for blade engagement and cutting height adjustment with 7 positions from 30-90 mm, powerful engine 650-700cc and cutting deck width 100-110cm, hydrostatic steering (HST) with adjustable comfort seat, 300-350 litre grass box capacity with two collecting mulching blades, Wheel sizes 15”-18”, engine power 10-12kw at 2500 rpm with battery charger, Noise levels upto 100 db Engine Make: - B & S/ Stiga/ Honda” | |||
| Construction Office | |||
| Providing street lighting arrangements in front of houses B (25-48) & B (103-108) in P. U. | 28-06-2012 | 05-07-2012 at 03:30 | 05-07-2012 at 03:30 |
| Providing street lighting arrangements in front of houses B (25-48) & B (103-108) in Panjab University Sector-14, Chandigarh. | |||
| Construction Office | |||
| Making Provision of Ductable A.C. Unit with R410A Refrigerant Based Gas on the G.Floor Of Exam. Hall | 29-06-2012 | 05-07-2012 at 03:30 | 05-07-2012 at 03:30 |
| Making Provision of Ductable A.C. Unit with R410A Refrigerant Based Gas on the Ground Floor Of Examination Hall In P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing and Laying 40mm thick Semidence Bitumanastic topping on existing road and parking | 29-06-2012 | 05-07-2012 at 03:30 | 05-07-2012 at 03:30 |
| Providing and Laying 40mm thick Semidence Bitumanastic topping on existing road and parking for Paramedical Science Block no.-1 in P.U. South Campus P.U. Chandigarh. | |||
| Construction Office | |||
| Providing and Laying 40mm thick Semidence Bitumanastic topping on existing road and parking for Pa | 27-06-2012 | 03-07-2012 at 03:30 | 03-07-2012 at 03:30 |
| Providing and Laying 40mm thick Semidence Bitumanastic topping on existing road and parking for Paramedical Science Block no.-2 in P.U. South Campus P.U. Chandigarh | |||
| Construction Office | |||
| Quotation of Horticulture Division | 15-06-2012 | 04-07-2012 at 03:30 | 04-07-2012 at 03:30 |
| 1. Garbage container (dustbin) of 4.5 cum capacity for tractor drawn Container Lifter made with MS sheet thickness of 10 SWG on the base and sides of 12 SWG and shall be fabricated out of 14 SWG. Sides and base will be strengthened with MS angle 40x40x5mm and channel of size 75x40mm. Containers will be provided with four doors on the top and one door at the back for loading and unloading of garbage duly coated with anti rust primer and two coats of fine quality enamel paint complete in all respects. 12 nos. Date of opening of Quotations will be communicating later | |||
| Construction Office | |||
| Repair of Chairs in Auditorium of USOL in Panjab University Campus, Sector-14, Chandigarh | 18-06-2012 | 22-06-2012 at 03:30 | 22-06-2012 at 03:30 |
| Repair of Chairs in Auditorium of USOL in Panjab University Campus, Sector-14, Chandigarh Corrigendum: >Repair of Chairs in Auditorium of USOL in Panjab University Campus, Sector14, Chandigarh: Repair of Chairs in Auditorium of USOL in Panjab University Campus, Sector14, Chandigarh | |||
| Construction Office | |||
| Proposed Cabin in the Corner of R & S Branch (Ground Floor) in Administrative Block, Panjab Univer | 18-06-2012 | 22-06-2012 at 03:30 | 22-06-2012 at 03:30 |
| Proposed Cabin in the Corner of R & S Branch (Ground Floor) in Administrative Block, Panjab University, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing and Laying 40mm thick Semidence Bitumanastic topping on existing road and parking | 15-06-2012 | 22-06-2012 at 03:30 | 22-06-2012 at 03:30 |
| Providing and Laying 40mm thick Semidence Bitumanastic topping on existing road and parking for Paramedical Science Block no.-1 in P.U. South Campus P.U. Chandigarh. | |||
| Construction Office | |||
| Providing Upgradation/replacement of A.C. Plant for the P.U. Library Building in P.U. Campus | 21-06-2012 | 25-06-2012 at 03:30 | 25-06-2012 at 03:30 |
| Providing Upgradation/replacement of A.C. Plant for the P.U. Library Building in P.U. Campus, Sector-14, Chandigarh | |||
| University Institute of Applied Management Sciences | |||
| NOTICE INVITING QUOTATIONS FOR RUNNING UIAMS CANTEEN | 11-06-2012 | 25-06-2012 at 04:00 | 25-06-2012 |
| Applications are invited from interested persons to run UIAMS canteen at Sector 25, South Campus, Panjab University, Chandigarh for the session 2012-2013. Date of opening of Quotations will be communicating later | |||
| Dean Students Welfare | |||
| Quotation of Purchase of ISI/BSI Electric Material | 06-06-2012 | 15-06-2012 at 05:00 | 15-06-2012 at 05:00 |
| 1. Flourescent Tube 4’ Philips 2. Complete fitting with rod Electronic Chock Philips 3. Choke 40w ( copper) Philips 4. Chock 40 w ( electronics) Philips 5. Tube holder set 6. Patti 4’ 7. Blubs 100 W 8. CFL Philips 18 Walt 9. C.F.L. 8 Walt 10. PVC Cable ISI 1.5 MM 91 meter Havels/Policap 11. PVC Cable ISI 2.5 MM 91 meter Havels/Policap 12. PVC Cable ISI 4 MM 91 meter Havels/Policap 13. PVC Cable ISI 6 MM 91 meter Havels/Policap 14. MCB Switch (16 AMP) , (6 AMP) ( 32AMP) Sigma or Havels 15. Chock 150 Walt for MH Lamps Philips 16. Chock 250 Walt for MH Lamps Philips 17. MCB D.P. 40 AMP Sigma or Havels 18. MCB D.P. 60 AMP Sigma or Havels 19. MCB TPN 63 AMP Havels 20. MCB Box 4 way 21. MCB Box 8 way 22. MH Lamp 150 walt, 250 walt, 400 walt, Crompton, Havels, Philips 23. Ignator Philips 24. Geyser Element ISI 25. Thomas Tate ISI 26. Fan Canters ISI (2.5 MFD) 27. Fan Regulator 28. Fan Barring Fans as following companies Usha, Crompton Greaves & Orient 29. Celling Fan ( 48’) 30. Celling Fan (56’) 31. Wall Fan ( 16’) 32. Exhaust Fan ( 18’) 33. Exhaust Fan ( 15’) 34. Exhaust Fan ( 12’) 35. Padistal Fan ( 16’) 36. On off Switch ISI 5 AMP 37. Shocket ISI 5AMP 38. On off Swtich ISI 15 AMP 39. Shocket ISI 15 AMP 40. Insulation Tape ISI Date of opening of Quotations will be communicating later | |||
| Dean Students Welfare | |||
| Quotation of Purchase of Sanitary Material | 06-06-2012 | 18-06-2012 at 05:00 | 18-06-2012 at 05:00 |
| Sr. No. Items 1 Orissa Pan 23” Ist quality white Make Johnson 12 Wash Basin 22” x 16 Ist quality White Make Johnson 3 Low level Cistern Ist quality white Make Jhonson 4 Low level Cistern Ist quality white Make Jhonson 5 Half Stall urinal Ist quality colour white make Johnson 6 GI Fittings, Make SVW, NVRISI Rate list attached 7 GI Pipe Jindal B Class Size ½”, Size ¾”, Size 1”, Size 1 ¼”, Size ½”, Size 2’ 8 C.I. Pipe 2 fitting ISI rate list attached less 10% 9 ISI Make Gate Valve Gun Metal Heavy Size ½” , Size ¼, Size 1 Heavy duty, Size 1 ¼’ DRP Make, Size 1 ½ ISI, Size 2” 10 Drip Seal 11 Lead 12 Rassa 13 C.P. Waste for washbasin (Brass) 14 P.V.C. Connection 15 Waste Pipe 1 ¼’ Heavy 16 C.P. Long Band for Orrisa pan 17 C.P. Pillar Cock ½ (Powergold) 18 C.P. Angle Cock (Powergold) Terms & Conditions Items No. 1-5, 9, 10, 13-18, Vate 12.5% extra Items No. 6-8, 11 & 12 Vat 4% extra Date of opening of Quotations will be communicating later | |||
| Construction Office | |||
| Provision of Additional ceiling fans & Replacement of old defective ceiling fans in Admin. office | 04-06-2012 | 12-06-2012 at 03:30 | 12-06-2012 at 03:30 |
| Provision of Additional ceiling fans & Replacement of old defective ceiling fans in Administrative office in Panjab University Sector-14, Chandigarh. | |||
| Construction Office | |||
| Various Tenders | 15-06-2012 | 27-06-2012 at 05:00 | 27-06-2012 at 05:00 |
| Sr. no. Name of work Estimated Cost Earnest Money Time Limit 1. Completion of Additional Accommodation of Engineering Institute at P.U.R.C, Hoshiarpur. Rs. 93.20 Lacs Rs. 1.86 Lacs 9 Months 2. SITC of fire hydrant system & smoke detection & fire alarm system installation at Library Building in Panjab University Campus Sector-14, Chandigarh. Rs. 18.50 Lacs Rs. 0.37 Lacs 3 Months 3. SITC of fire hydrant system & smoke detection & fire alarm system installation at Aruna Ranjit Chandra hall in Panjab University Campus Sector-14, Chandigarh. Rs. 20.50 Lacs Rs. 0.41 Lacs 3 Months 4. SITC of fire hydrant system & smoke detection & fire alarm system installation at Administrative Block in Panjab University Campus Sector-14, Chandigarh. Rs. 29.30 Lacs Rs. 0.59 Lacs 4 Months 5. Renovation/Interior and Exterior of type-E, VVBIS teacher’s flats, Hoshiarpur. Rs. 38.50 Lacs Rs. 0.77 Lacs 4 Months | |||
| University School of Open Learning | |||
| TENDER FOR type-setting/PRINTING and binding ETC. | 30-05-2012 | 08-06-2012 at 04:00 | 12-06-2012 at 11:00 |
| TENDER FOR type-setting/PRINTING and binding ETC. valid FOR ONE YEAR FROM THE DATE OF AGREEMENT (Extendable for another one year) Date of opening of Tender will be communicating later | |||
| Swami Sarvanand Giri Regional Centre | |||
| TENDER DOCUMENT FOR PURCHASE OF EQUIPMENT | 25-05-2012 | 09-07-2012 at 04:00 | 12-07-2012 at 12:00 |
| TENDER DOCUMENT FOR PURCHASE OF EQUIPMENT | |||
| Department of Botany | |||
| PURCHASE OF HPLC SYSTEM IN MINISTRY OF FOOD PROCESSING INDUSTRIES (MFPI) PROJECT | 23-05-2012 | 08-06-2012 at 05:00 | 11-07-2012 at 11:00 |
| FOR THE PURCHASE OF HPLC SYSTEM IN MINISTRY OF FOOD PROCESSING INDUSTRIES (MFPI) PROJECT | |||
| Construction Office | |||
| Various Quotation | 21-05-2012 | 12-06-2012 at 03:30 | 12-06-2012 at 03:30 |
| 1. Earthen Pots 12” 3000 no. 2. Cow dung manure (well rotten) 15,000cft. | |||
| Construction Office | |||
| Providing and fixing the water storage tank at Chemical Engineering Deptt. in Panjab University Ca | 21-05-2012 | 01-06-2012 at 03:30 | 01-06-2012 at 03:30 |
| Providing and fixing the water storage tank at Chemical Engineering Deptt. in Panjab University Campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing and Laying 40mm thick Semidence Bitumanastic topping on existing road and parking | 21-05-2012 | 30-05-2012 at 03:30 | 30-05-2012 at 03:30 |
| Providing and Laying 40mm thick Semidence Bitumanastic topping on existing road and parking for Paramedical Science Block no.-1 in P.U. South Campus P.U. Chandigarh. | |||
| Construction Office | |||
| Provision of Water - coolers in Administrative Block. And Aruna Ranjit Chandra Hall in P. U. Campu | 21-05-2012 | 01-06-2012 at 03:30 | 01-06-2012 at 03:30 |
| Provision of Water - coolers in Administrative Block. And Aruna Ranjit Chandra Hall in P. U. Campus, Chandigarh | |||
| Dean Students Welfare | |||
| P.U. Campus Hostels Contractorship for Messes, Canteens and Shops for the session 2012-13. | 16-05-2012 | 08-06-2012 at 05:00 | 21-06-2012 at 09:30 |
| P.U. Campus Hostels Contractorship for Messes, Canteens and Shops for the session 2012-13. Interview shall be held on 21st June’ 2012 for messes/canteens and 22nd June’ 2012 for shops at 9.30 a.m. in the Office of the DSW (Student Centre, 1st Floor). | |||
| Construction Office | |||
| Providing Electrical Installation Rewiring (Recessed type) in B type (5nos.) and T-II type (5nos.) | 15-05-2012 | 29-05-2012 at 03:30 | 29-05-2012 at 04:30 |
| Providing Electrical Installation Rewiring (Recessed type) in B type (5nos.) and T-II type (5nos.) houses in Panjab University Campus, Sector-14 and South Campus, Sector-25, Chandigarh | |||
| Construction Office | |||
| Connecting the flood lights provided for lightening the common pool area of Woman Hostel no. 1 in P | 15-05-2012 | 21-05-2012 at 03:00 | 21-05-2012 at 03:30 |
| Connecting the flood lights provided for lightening the common pool area of Woman Hostel no. 1 in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing flood lighting & high mast lighting near Pump House in P.U. Campus, chd. | 22-05-2012 | 29-05-2012 at 03:30 | 29-05-2012 at 04:30 |
| Providing flood lighting & high mast lighting near Pump House in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Construction of road upto porch of Paramedical Science Block no.-2 in P.U. South Campus Chd. | 18-05-2012 | 23-05-2012 at 03:30 | 23-05-2012 at 03:30 |
| Construction of road upto porch of Paramedical Science Block no.-2 in P.U. South Campus P.U. Chandigarh. | |||
| Construction Office | |||
| Rewiring of Panjab University Extension Library at Ludhiana | 15-01-2012 | 21-01-2012 at 03:30 | 21-01-2012 at 03:30 |
| Rewiring of Panjab University Extension Library at Ludhiana | |||
| Construction Office | |||
| Applying Antitermite treatment in U.B.S. Building in Panjab University, Sec-14, Chandigarh. | 16-01-2012 | 22-01-2012 at 03:30 | 22-01-2012 at 03:30 |
| Applying Antitermite treatment in U.B.S. Building in Panjab University, Sec-14, Chandigarh. | |||
| Construction Office | |||
| Providing and fixing floor tile and B.R.C. fabric grills at Community Education and Disability Stu | 14-05-2012 | 18-05-2012 at 03:30 | 18-05-2012 at 03:30 |
| Providing and fixing floor tile and B.R.C. fabric grills at Community Education and Disability Studies in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Additional and Alteration in Deptt. Of Computer Centre in Panjab University Campus, Sector-14, Chd | 14-05-2012 | 18-05-2012 at 03:30 | 18-05-2012 at 03:30 |
| Additional and Alteration in Deptt. Of Computer Centre in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Construction of approach path upto Mandir and Gurudwara in P.U Campus, Sector-14 Chd | 14-05-2012 | 18-05-2012 at 03:30 | 18-05-2012 at 03:30 |
| Construction of approach path upto Mandir and Gurudwara in Panjab University Campus, Sector-14 Chandigarh | |||
| Construction Office | |||
| Construction of approach path upto Mandir and Gurudwara in P.U Campus, Sector-14 Chd | 14-05-2012 | 18-05-2012 at 03:30 | 18-05-2012 at 03:30 |
| Construction of approach path upto Mandir and Gurudwara in Panjab University Campus, Sector-14 Chandigarh | |||
| Construction Office | |||
| Renovation of Canteen in Department of Pharmacy in P.U. Campus Sec-14, Chandigarh. | 14-05-2012 | 18-05-2012 at 03:30 | 18-05-2012 at 03:30 |
| Renovation of Canteen in Department of Pharmacy in P.U. Campus Sec-14, Chandigarh. | |||
| Construction Office | |||
| Renovation of Lab No. 12 & 13 and Lab no. 18 & 23 (Phamacology) at UIPS in P. U.Sector- 14 | 09-05-2012 | 14-05-2012 at 03:30 | 14-05-2012 at 03:30 |
| Renovation of Lab No. 12 & 13 and Lab no. 18 & 23 (Phamacology) at Deptt. Of UIPS in P. U. Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Electrical Installation Rewiring (Recessed type) in B type (5nos.) and T-II type (5nos.) h | 04-05-2012 | 10-05-2012 at 03:30 | 10-05-2012 at 04:30 |
| Providing Electrical Installation Rewiring (Recessed type) in B type (5nos.) and T-II type (5nos.) houses in Panjab University Campus,Sector-14 and South Campus | |||
| Construction Office | |||
| quotation | 27-04-2012 | 14-05-2012 at 03:30 | 14-05-2012 at 03:30 |
| Qty. 1. M.S. Angle (40x40x5) mm729 kg 2. G.I. Barbed Wire 12 g 714 kg | |||
| Registrar's Office | |||
| INSTALLATION OF CCTV SURVEILLANCE SYSTEM | 28-04-2012 | 18-05-2012 at 15:00 | 21-05-2012 at 15:00 |
| INSTALLATION OF CCTV SURVEILLANCE SYSTEM | |||
| Construction Office | |||
| Quotations of various items | 27-04-2012 | 18-05-2012 at 03:30 | 18-05-2012 at 03:30 |
| Fertilizers 1. Urea 30 no. bags 2. DAP 5 no. bags 3.SSP 5 no. bags 4.MOP 5 no. bags 5.Neem Cake 10 no. bags (50 kg/bag) 6.Sterameal (Bone meal) 10 no. bags (50 kg/bag) 7.Organic manure 10 no. bags (50 kg/bag) | |||
| Construction Office | |||
| P/F of Dholpur Sand Stone and Red Agra Sand Stone on the External Sides of Construction of College B | 20-04-2012 | 26-04-2012 at 03:30 | 26-04-2012 at 03:30 |
| P/F of Dholpur Sand Stone and Red Agra Sand Stone on the External Sides of Construction of College Bhawan and Extension of Student Holiday Home Building for Youth Welfare Department in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing L.T. cables for connecting U.I.E.T. Blocks/ Workshops to 11 K.V. Substation in P.U. South | 27-04-2012 | 02-05-2012 at 03:30 | 02-05-2012 at 03:30 |
| Providing L.T. cables for connecting U.I.E.T. Blocks/ Workshops to 11 K.V. Substation in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Providing Internet Wiring in emerging Area in Social Sciences in P.U. Campus, Sector-14, Chandigarh | 27-04-2012 | 02-05-2012 at 03:30 | 02-05-2012 at 03:30 |
| Providing Internet Wiring in emerging Area in Social Sciences in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing and Laying of External Sewer Line for the Emerging Areas in Science and Technology for Blo | 27-04-2012 | 02-05-2012 at 03:30 | 02-05-2012 at 03:30 |
| Providing and Laying of External Sewer Line for the Emerging Areas in Science and Technology for Block-III in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Additional Work for the Construction of Vertical Extension of U.I.A.M.S. Building (3rd and 4th store | 20-04-2012 | 26-04-2012 at 03:30 | 26-04-2012 at 03:30 |
| Additional Work for the Construction of Vertical Extension of U.I.A.M.S. Building (3rd and 4th storey) in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Finishing Items and Additional Work for Construction of Vertical Extension of U.I.A.M.S. Building in | 20-04-2012 | 26-04-2012 at 03:30 | 26-04-2012 at 03:30 |
| Finishing Items and Additional Work for Construction of Vertical Extension of U.I.A.M.S. Building in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Various Tenders | 15-05-2012 | 22-05-2012 at 03:30 | 22-05-2012 at 03:30 |
| 1. Providing 8 passenger Elevator & Electrical installation in lift well and machine room less with Buyback of Existing lift in A.C.Joshi Library in P.U. Campus, Sector-14, Chd 2. Providing 8 passenger Elevator & Electrical Installation in lift well and machine room less Building of Emerging Area in Social Sciences in P.U. Campus, Sector-14, Chd. 3. Providing 8 passenger Elevator in lift well machine room less in Guru Teg Bahadur Bhawan Building in P.U. Campus, Sector-14, Chandigarh 4. Providing 8 passenger Elevator in lift well machine room less in Boys Hostel No. 8 in P.U. Campus, Sector-14, Chd. 5. Providing 8 passenger Elevator in lift well machine room less in Guest House Building in P.U. Campus, Sector-14, Chd. | |||
| Construction Office | |||
| Renovation of Canteen in Department of Pharmacy in P.U. Campus Sec-14, Chandigarh. | 26-04-2012 | 03-05-2012 at 03:30 | 03-05-2012 at 03:30 |
| Renovation of Canteen in Department of Pharmacy in P.U. Campus Sec-14, Chandigarh. | |||
| Construction Office | |||
| Proposed extension counter of Bank in the swami S.G. Regional Centre Institute of Engg. & Tech | 26-04-2012 | 03-05-2012 at 03:30 | 03-05-2012 at 03:30 |
| Proposed extension counter of Bank in the existing building near entrance (left side) at swami Sarvanand Giri Regional Centre Institute of Engg. And technology at Una Road , Hoshiarpur (Pb). | |||
| Construction Office | |||
| Provision of BRC shed for CT PT unit and metering for 11 KV electric connection UIET South Campus | 17-04-2012 | 19-04-2012 at 10:00 | 19-04-2012 at 10:00 |
| Provision of BRC shed for CT PT unit and metering for 11 KV electric connection UIET South Campus Sector-25 , Chandigarh | |||
| Construction Office | |||
| Providing Electrical Installation Rewiring (Recessed type) in B type and T-II type houses | 17-04-2012 | 25-04-2012 at 03:30 | 25-04-2012 at 04:30 |
| Providing Electrical Installation Rewiring (Recessed type) in B type(5nos.) and T-II type(5nos.) houses in Panjab University Campus,Sector-14 and South Campus,Sector-25, Chandigarh. | |||
| Construction Office | |||
| Providing Electrical Installation Rewiring (Recessed type) in C type ,D type,and E type | 17-04-2012 | 25-04-2012 at 03:30 | 25-04-2012 at 04:30 |
| Providing Electrical Installation Rewiring (Recessed type) in C type (5nos.),D type (5 nos.) and E type (5nos.) houses in Panjab University Campus, Sector-14 and South Campus, Sector-25, Chandigarh | |||
| Construction Office | |||
| Providing Electrical Installation Rewiring (Recessed type) in T1 type, G type, F type houses in P.U | 17-04-2012 | 25-04-2012 at 03:30 | 25-04-2012 at 04:30 |
| Providing Electrical Installation Rewiring (Recessed type) in T1 type (3nos.),G type(3nos.), and F type (4nos.) houses in Panjab University Campus, Sector-14 and South Campus, Sector-25, Chandigarh. | |||
| Construction Office | |||
| Construction and providing and installation for setting up Digital Library in A.C. Joshi Library | 10-04-2012 | 16-04-2012 at 03:30 | 16-04-2012 at 03:30 |
| Construction and providing and installation for setting up Digital Library in A.C. Joshi Library Building in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Proposed ext. counter of Bank in the existing building near entrance (left side) at Hoshiarpur | 04-04-2012 | 12-04-2012 at 03:30 | 12-04-2012 at 03:30 |
| Proposed extension counter of Bank in the existing building near entrance (left side) at swami Sarvanand Giri Regional Centre Institute of Engg. And technology at Una Road , Hoshiarpur (Pb). | |||
| Construction Office | |||
| Laying of LT Cable from Administrative Office Substation to main LT Line in P.U. | 10-04-2012 | 17-04-2012 at 03:30 | 17-04-2012 at 04:30 |
| Laying of LT Cable from Administrative Office Substation to main LT Line in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Electrical Installation Rewiring (Recessed type) in E-1 Type houses 12 nos. in Panjab Un | 11-04-2012 | 18-04-2012 at 03:30 | 18-04-2012 at 04:30 |
| Providing Electrical Installation Rewiring (Recessed type) in E-1 Type houses 12 nos. in Panjab University Campus, Sector-14 and South Campus, Chandigarh. | |||
| Construction Office | |||
| Providing Electrical Installation Rewiring (Recessed type) in A Type houses 27 nos. in P.U. | 11-04-2012 | 18-04-2012 at 03:30 | 18-04-2012 at 04:30 |
| Providing Electrical Installation Rewiring (Recessed type) in A Type houses 27 nos. in Panjab University Campus, Sector-14 and South Campus, Sector-25, Chandigarh | |||
| Construction Office | |||
| P/F of Dholpur Sand Stone and Red Agra Sand Stone on the External Sides of Construction | 04-04-2012 | 11-04-2012 at 03:30 | 11-04-2012 at 03:30 |
| P/F of Dholpur Sand Stone and Red Agra Sand Stone on the External Sides of Construction of College Bhawan and Extension of Student Holiday Home Building for Youth Welfare Department in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing and Laying of External Sewer Line for the Emerging Areas in Sc and Tech. for Block -IV P.U | 04-04-2012 | 11-04-2012 at 03:30 | 11-04-2012 at 03:30 |
| Providing and Laying of External Sewer Line for the Emerging Areas in Science and Technology for Block-IV in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Various Tenders | 03-04-2012 | 16-04-2012 at 03:30 | 16-04-2012 at 03:30 |
| 1. Construction/Extension of Girls Hostel No.9 (2nd phase) in P.U. South Campus, Chandigarh 2. Construction/Extension of Guest House for Academic Staff College (2nd Part) in P.U. Campus, Sector-14, Chandigarh | |||
| Department of Microbiology | |||
| TENDER DOCUMENT FOR THE PURCHASE OF HPLC SYSTEM IN ICMR PROJECT | 28-03-2012 | 09-04-2012 at 04:00 | 17-04-2012 at 10:00 |
| TENDER DOCUMENT FOR THE PURCHASE OF HPLC SYSTEM IN ICMR PROJECT | |||
| Construction Office | |||
| Supply and Erection of PVC insulated Aluminium LT armoured cable for Department of Laws (3 years) | 29-03-2012 | 09-04-2012 at 03:30 | 09-04-2012 at 04:30 |
| Supply and Erection of PVC insulated Aluminium LT armoured cable for Department of Laws (3 years course) in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| White Washing on through rate basis in 'E-I', 'F' ,'G' ,T-I & T-II type houses in P.U. | 26-03-2012 | 30-03-2012 at 03:30 | 30-03-2012 at 03:30 |
| White Washing on through rate basis in 'E-I', 'F' ,'G' ,T-I & T-II type houses in Panjab University Campus, Sector-14 and Sector-25, Chandigarh | |||
| Construction Office | |||
| White Washing on through rate basis in 'A' , 'B' 'C', 'D' , 'E', T-III,T-IV type houses in P.U. | 26-03-2012 | 30-03-2012 at 03:30 | 30-03-2012 at 03:30 |
| White Washing on through rate basis in 'A' , 'B' 'C', 'D' , 'E', T-III,T-IV type houses in Panjab University Campus, Sector-14 and Sector-25, Chandigarh | |||
| Construction Office | |||
| P/L of GRC Tiles for Construction of Boys Hostel No. 8 (Ist Phase) in P.U. South Campus, Chandigarh | 20-03-2012 | 30-03-2012 at 03:30 | 30-03-2012 at 03:30 |
| P/L of GRC Tiles for Construction of Boys Hostel No. 8 (Ist Phase) in P.U. South Campus, Chandigarh | |||
| Dean Students Welfare | |||
| Quotation are Invited for Jhankaar 2012 | 15-03-2012 | 19-03-2012 at 16:00 | 19-03-2012 at 16:00 |
| Rates for hiring the following material for organizing "Jhankaar – 2012" by Panjab University Campus Student Council from 21st to 23rd March, 2012: | |||
| Conduct Branch | |||
| Hiring of 20 AC Taxis/Non AC Taxies (Indica?tata Sumo/Qualis) on hire basis | 08-03-2012 | 19-03-2012 at 16:00 | 19-03-2012 at 16:00 |
| Hiring of 20 AC Taxis/Non AC Taxies (Indica?tata Sumo/Qualis) on hire basis Assistan Registrar (conduct) 3rd Floor, Admin. Office., PU Chandigarh | |||
| Construction Office | |||
| Beautification/Up gradation of infrastructure facilities around Student Centre in P.U. Campus | 14-03-2012 | 20-03-2012 | 20-03-2012 |
| Beautification/Up gradation of infrastructure facilities around Student Centre in Panjab University Campus, Sector-14 , Chandigarh | |||
| Construction Office | |||
| Renovation in P.U. Press for provision of new machine in P.U. Campus Sector-14, Chandigarh | 14-03-2012 | 20-03-2012 at 03:30 | 20-03-2012 at 03:30 |
| Renovation in P.U. Press for provision of new machine in Panjab University Campus Sector-14, Chandigarh | |||
| Computer Centre | |||
| TENDER DOCUMENT FOR SETTING OF VIRTUAL CLASS ROOM | 07-03-2012 | 22-03-2012 at 15:00 | 22-03-2012 at 16:00 |
| TENDER DOCUMENT FOR SETTING OF VIRTUAL CLASS ROOM | |||
| Registrar's Office | |||
| Various Types of Printing and Binding Machinery | 05-03-2012 | 22-03-2012 at 15:00 | 22-03-2012 at 15:30 |
| Various Types of Printing and Binding Machinery | |||
| Construction Office | |||
| Providing and fixing iron railing from Law auditorium to Botany Deptt. in Panjab University Campus | 12-03-2012 | 16-03-2012 at 03:30 | 16-03-2012 at 03:30 |
| Providing and fixing iron railing from Law auditorium to Botany Deptt. in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Construction of parking at Working Women Hostel in Panjab University Campus, Sector-14, Chandigarh | 12-03-2012 | 16-03-2012 at 03:30 | 16-03-2012 at 03:30 |
| Construction of parking at Working Women Hostel in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Rewinding of motors of various capacity in Panjab University Campus, Sector-14 and South campus, C | 06-03-2012 | 12-03-2012 at 03:30 | 12-03-2012 at 03:30 |
| Rewinding of motors of various capacity in Panjab University Campus, Sector-14 and South campus, Chandigarh. | |||
| Construction Office | |||
| Quotation --- Divisional Engineer, Horticulture Division, Construction Office, Panjab University | 29-02-2012 | 15-03-2012 at 03:30 | 15-03-2012 at 03:30 |
| Quotation --- Divisional Engineer, Horticulture Division, Construction Office, Panjab University 1. MS Angle (50x50x6) 760 kg 2. MS Flat(50x6) 372 kg 3. M.S. Behra 2” 16 no. 4. Welding Rods 16 pkt (10 no. pkt of wt. = 2.5 kg) 5. Aldrop 8 no. 6. Paint (White) 18 lt 7. Primer 16 lt 8. Brush 3” 3 no. 9. T. Oil 16 lt | |||
| Construction Office | |||
| Construction and providing and installation for setting up Digital Library in A.C. Joshi Library | 05-03-2012 | 09-03-2012 at 03:30 | 09-03-2012 at 03:30 |
| Construction and providing and installation for setting up Digital Library in A.C. Joshi Library Building in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing and fixing apex Exterior paint to the exterior RCC surface for the building of Dental Sc. | 02-03-2012 | 07-03-2012 at 03:30 | 07-03-2012 at 03:30 |
| Providing and fixing apex Exterior paint to the exterior RCC surface for the building of Dr. Harvansh Singh Judge Institute for Dental Science in P.U. Campus Sec-25, Chandigarh. | |||
| Construction Office | |||
| Renovation of Lab No.3 (Ground Floor) in Zoology Deptt. in Panjab University Campus, Sector-14, Ch | 05-03-2012 | 09-03-2012 at 03:30 | 09-03-2012 at 03:30 |
| Renovation of Lab No.3 (Ground Floor) in Zoology Deptt. in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Extension of Parking for Panjab University Health Centre in P.U. Campus, Sector-14, | 29-02-2012 | 07-03-2012 at 03:30 | 07-03-2012 at 03:30 |
| Extension of Parking for Panjab University Health Centre in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Operation of DG set 125 KVA (4 nos.) of various sites i.e., in V.C. Office, Guest House, Faculty H | 23-02-2012 | 28-02-2012 at 03:30 | 28-02-2012 at 04:30 |
| Operation of DG set 125 KVA (4 nos.) of various sites i.e., in V.C. Office, Guest House, Faculty House, Golden jubilee guest house in Panjab University Sector-14, Chandigarh. | |||
| Construction Office | |||
| Electrical Installation for Boys Hostel no. 2 to 5 (Remaining work of rewiring) in Panjab Universi | 23-02-2012 | 28-02-2012 at 03:30 | 28-02-2012 at 04:30 |
| Electrical Installation for Boys Hostel no. 2 to 5 (Remaining work of rewiring) in Panjab University campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Annual Maintenance Contract of DG set 125 KVA (4 nos.) of various sites i.e., in V.C. Office, Guest | 23-02-2012 | 28-02-2012 at 03:30 | 28-02-2012 at 04:30 |
| Annual Maintenance Contract of DG set 125 KVA (4 nos.) of various sites i.e., in V.C. Office, Guest House, Faculty House, Golden jubilee guest house in Panjab University Sector-14, Chandigarh | |||
| Construction Office | |||
| Maintenance of Public Health work in B. Hostel No. 1 to 7 and operating of 1 H.P. Water Pump P.U. | 23-02-2012 | 29-02-2012 at 03:30 | 29-02-2012 at 03:30 |
| Maintenance of Public Health work in Boys Hostel No. 1 to 7 and operating of 1 H.P. Water Pump in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Maintenance of Public Health work in Boys Hostel No. 1 to 7 and operating of 1 H.P. Water Pump | 23-02-2012 | 29-02-2012 at 03:30 | 29-02-2012 at 03:30 |
| Maintenance of Public Health work in Boys Hostel No. 1 to 7 and operating of 1 H.P. Water Pump in Panjab University Campus, Sector-14, Chandigarh | |||
| Directorate of Sports | |||
| TENDER DOCUMENT FOR “SUPPLY OF MULTI GYM MACHINES” | 16-02-2012 | 16-03-2012 at 03:00 | 16-03-2012 at 03:30 |
| TENDER DOCUMENT FOR “SUPPLY OF MULTI GYM MACHINES” | |||
| Construction Office | |||
| Operating of existing pumps and Tubewell at various sites in P.U. Campus, Sector-14 & 25 Chd. | 24-02-2012 | 29-02-2012 at 03:30 | 29-02-2012 at 03:30 |
| Operating of existing pumps and Tubewell at various sites in Panjab University Campus, Sector-14 & 25, Chandigarh | |||
| Construction Office | |||
| Rewiring (recessed type) in House no. G-7 in Panjab University campus, Sector-14, Chandigarh | 15-02-2012 | 22-02-2012 at 03:30 | 22-02-2012 at 04:30 |
| Rewiring (recessed type) in House no. G-7 in Panjab University campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Rewiring of faculty rooms & research lab of Deptt. of Micro-Biology) at P.U. | 15-02-2012 | 22-02-2012 at 03:30 | 22-02-2012 at 04:30 |
| Rewiring of 2 nos. faculty rooms and research lab no.4 (2nd floor) of Deptt. of Micro-Biology) at B.M.S. Building in Panjab University Campus, Sector-14, Chandigarh | |||
| Controller of Examinations | |||
| Tender for purchase of three OMR Scanners with Barcode reader | 11-02-2012 | 27-02-2012 at 10:00 | 27-02-2012 at 11:00 |
| Tender for purchase of three OMR Scanners with Barcode reader | |||
| Construction Office | |||
| Various Quotations | 08-02-2012 | 24-02-2012 at 03:30 | 24-02-2012 at 03:30 |
| 1 MS Angle(50x50x6) 760 kg 2. MS Flat(50x6) 372 kg 3. M.S. Behra 2” 16 no. 4. Welding Rods 16 pkt (10 no. pkt of wt. = 2.5 kg) 5. Aldrop 8 no. 6. Paint (White) 18 lt 7. Primer 16 lt 8. Brush 3” 3 no. 9. T. Oil | |||
| Dean Students Welfare | |||
| Hire Tent / Bericating / Stage decoration/ Sound System | 08-02-2012 | 11-02-2012 at 17:00 | 11-02-2012 at 17:00 |
| Hire Tent/bericating/stage decoration/ Sound System etc. for "Vimarsh Cultural Nite" on 14 Feb. 2012 | |||
| Construction Office | |||
| Various Tenders | 17-02-2012 | 28-02-2012 at 05:00 | 29-02-2012 at 10:00 |
| 1. Upgrading of water supply and public health system in Panjab University Campus, Sector -14, Chandigarh. 2. Construction/Extension of all weather swimming pool in Panjab University Campus, Sector -14, Chandigarh. 3. Renovation/Extension of Indian Theatre in P.U. Campus Sector- 14, Chandigarh. | |||
| Construction Office | |||
| Operation of DG set 125 KVA (4 nos.) of various sites i.e., in V.C. Office, Guest House, Faculty H | 09-02-2012 | 16-02-2012 at 03:30 | 16-02-2012 at 04:30 |
| Operation of DG set 125 KVA (4 nos.) of various sites i.e., in V.C. Office, Guest House, Faculty House, Golden jubilee guest house in Panjab University Sector-14, Chandigarh. | |||
| Construction Office | |||
| Annual Maintenance Contract of DG set 125 KVA (4 nos.) of various sites i.e., in V.C. Office, Gues | 09-02-2012 | 16-02-2012 at 03:30 | 16-02-2012 at 04:30 |
| Annual Maintenance Contract of DG set 125 KVA (4 nos.) of various sites i.e., in V.C. Office, Guest House, Faculty House, Golden jubilee guest house in Panjab University Sector-14, Chandigarh. | |||
| Computer Centre | |||
| Supply, Installation, Implementation, Integration of Network Switches, | 04-02-2012 | 21-02-2012 at 15:00 | 21-02-2012 at 15:30 |
| Tender Document for Supply, Installation, Implementation, Integration of Network Switches, Optical Fibre Ring and SSL VPN | |||
| University Institute of Engineering & Technology | |||
| TENDER DOCUMENT FOR PURCHASE OF EQUIPMENT | 25-01-2012 | 09-02-2012 at 11:00 | 09-02-2012 at 12:00 |
| TENDER DOCUMENT FOR PURCHASE OF EQUIPMENT | |||
| Construction Office | |||
| Construction of parking lot for Department of Geology, Geography and Russion in Panjab university | 27-01-2012 | 02-02-2012 at 03:30 | 02-02-2012 at 03:30 |
| Construction of parking lot for Department of Geology, Geography and Russion in Panjab university campus sector-14, Chandigarh | |||
| Construction Office | |||
| Construction of Astroturf Hockey ground in Panjab University Campus Sector-14, Chandigarh | 06-02-2012 | 13-02-2012 at 05:00 | 14-02-2012 at 10:00 |
| Construction of Astroturf Hockey ground in Panjab University Campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Electrical Installation for Computer Lab of Computer Unit (First Floor) in Aruna Ranjit Chandra Hall | 25-01-2012 | 02-02-2012 at 03:30 | 02-02-2012 at 03:30 |
| Electrical Installation for Computer Lab of Computer Unit (First Floor) in Aruna Ranjit Chandra Hall in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Rewiring of 2 nos. faculty rooms and research lab no.4 (2nd floor of Deptt. of Micro-Biology) at B.M | 25-01-2012 | 02-02-2012 at 03:30 | 02-02-2012 at 04:30 |
| Rewiring of 2 nos. faculty rooms and research lab no.4 (2nd floor of Deptt. of Micro-Biology) at B.M.S. Building in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Various Tenders | 30-01-2012 | 06-02-2012 at 03:30 | 06-02-2012 at 03:30 |
| Construction of Extension of Guru Teg Bahadur Bhawan Building (3rd Phase) in P.U. Campus, Sector-14, Chandigarh Construction/Extension of Guest House for Academic Staff College (2nd Part) in P.U. Campus, Sector-14, Chandigarh Construction of Type-IV 30 No. Houses (five storey) in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Providing and Laying of Sewer Line For Construction of Girls Hostel No. 9 in P.U. South Campus, Cha | 19-01-2012 | 25-01-2012 at 03:30 | 25-01-2012 at 03:30 |
| Providing and Laying of Sewer Line For Construction of Girls Hostel No. 9 in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Providing and Laying Water Pipe Line For Construction of Girls Hostel No. 9 in P.U. South Campus, Ch | 19-01-2012 | 25-01-2012 at 03:30 | 25-01-2012 at 03:30 |
| Providing and Laying Water Pipe Line For Construction of Girls Hostel No. 9 in P.U. South Campus, Chandigarh | |||
| Computer Centre | |||
| Tender Document for Installation of Controller based Wi-fi System | 11-01-2012 | 02-02-2012 at 17:00 | 03-02-2012 at 11:00 |
| Tender Document for Installation of Controller based Wi-fi System for Panjab University Campus | |||
| Department of Physics | |||
| TENDER DOCUMENT FOR THE PURCHASE OF MICROFOCUS-EDXRF SPRCTROMETER | 04-01-2012 | 30-01-2012 at 03:30 | 06-02-2012 at 03:30 |
| TENDER DOCUMENT FOR THE PURCHASE OF MICROFOCUS-EDXRF SPRCTROMETER | |||
| Department of Physics | |||
| TENDER DOCUMENT FOR THE PURCHASE OF ATOMIC FORCE MICROSCOPE (AFM | 04-01-2012 | 30-01-2012 at 03:30 | 06-02-2012 at 03:30 |
| TENDER DOCUMENT FOR THE PURCHASE OF ATOMIC FORCE MICROSCOPE (AFM) | |||
| Department of Physics | |||
| TENDER DOCUMENT FOR THE PURCHASE OF X-RAY DIFFRACTOMETER SYSTEM | 04-01-2012 | 30-01-2012 at 03:30 | 06-02-2012 at 03:30 |
| TENDER DOCUMENT FOR THE PURCHASE OF X-RAY DIFFRACTOMETER SYSTEM | |||
| Centre for Nanoscience & Nanotechnology (U.I.E.A.S.T.) | |||
| Tender for the purchase of fluorescence spectrophotometer. | 04-01-2012 | 31-01-2012 at 03:30 | 08-02-2012 at 03:30 |
| TENDER DOCUMENT FOR THE PURCHASE OF FLUORESCENCE SPECTROPHOTOMETER | |||
| Construction Office | |||
| Supply and carriage of cement including unloading and stacking at store. As per ISI specification | 03-01-2012 | 05-01-2012 at 03:30 | 05-01-2012 at 03:30 |
| Supply and carriage of cement including unloading and stacking at store. As per ISI specification with latest amendments in Jute/HDPE bags of 50 kg net weight. c) Ordinary Portland cement 43 grade duly ISI marked IS 8112/1989-43. App. Total Qty : F.O.R. at Hoshiarpur (Bajwara) 4,000 Bags | |||
| Conduct Branch | |||
| Tender for Waste Paper, Marked Answer Books | 26-12-2011 | 12-01-2012 at 14:30 | 12-01-2012 at 15:00 |
| Sealed tenders are invited for sale of (i) Marked Answer-books, (ii) Marked answer-books with adhesive tapes and (iii) other waste paper material | |||
| Conduct Branch | |||
| Tender for Waste Paper, Marked Answer Books | 26-12-2011 | 12-01-2012 at 02:30 | 12-01-2012 at 03:00 |
| Tender for Waste Paper, Marked Answer Books | |||
| Directorate of Sports | |||
| Selected tenders are invited from the manufacturers/firms for the supply of following items: | 22-12-2011 | 24-01-2012 | 24-01-2012 |
| Selected tenders are invited from the manufacturers/firms for the supply of following items: | |||
| Construction Office | |||
| Auction of Fruit crop of about 400 nos. Mango (Dusheri) fruit trees | 22-12-2011 | 03-01-2012 | 03-01-2012 |
| Sealed tenders on plain paper are hereby invited from the interested parties for the sale of fruit crop of about 400 nos. Mango (Dusheri) fruit trees around boys hostel no.1,2,3,4 & 5 and also the fruit crop of about 150 nos. of Desi mango trees in the Panjab University Campus, Sector-14, Chandigarh for two seasons i.e. for the years 2012 and 2013. | |||
| Directorate of Sports | |||
| Supply of Raw Material for Fencing | 24-12-2011 | 24-01-2012 | 24-01-2012 |
| Supply of Raw Material for Fencing | |||
| Construction Office | |||
| Electrical Installation for Shifting of Electrical Panels in Botany Department in Panjab University | 22-12-2011 | 27-12-2011 at 03:30 | 27-12-2011 at 04:30 |
| Electrical Installation for Shifting of Electrical Panels in Botany Department in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing flood lights behind Girls Hostel No.1/ adjoining P.U. Health Centre in Panjab University C | 09-12-2011 | 20-12-2011 at 03:30 | 20-12-2011 at 04:30 |
| Providing flood lights behind Girls Hostel No.1/ adjoining P.U. Health Centre in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Electrical Installation for Computer Lab of Computer Unit (First Floor) in Aruna Ranjit Chandra Hall | 22-12-2011 | 27-12-2011 at 03:30 | 27-12-2011 at 04:30 |
| Electrical Installation for Computer Lab of Computer Unit(First Floor) in Aruna Ranjit Chandra Hall in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Construction of Vertical Extension of Guru Teg Bahadur Bhawan (3rd Floor) in P.U. Campus, Sector-14 | 07-12-2011 | 09-12-2011 at 03:30 | 09-12-2011 at 03:30 |
| Construction of Vertical Extension of Guru Teg Bahadur Bhawan (3rd Floor) in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing E.I. for Addition/ Alterations for Dining Hall in Golden Jubilee Guest House in P.U. Camp | 19-12-2011 | 21-12-2011 at 03:30 | 21-12-2011 at 03:30 |
| Providing E.I. for Addition/ Alterations for Dining Hall in Golden Jubilee Guest House in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing E.I. for Addition/ Alterations for Dining Hall in Golden Jubilee Guest House in P.U. Camp | 19-12-2011 | 21-12-2011 at 03:30 | 21-12-2011 at 03:30 |
| Providing E.I. for Addition/ Alterations for Dining Hall in Golden Jubilee Guest House in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| P/F of Almn. Work & Fittings for Construction of Vertical Extension of Guru Teg Bahadur Bhawan (3rd | 07-12-2011 | 09-12-2011 at 03:30 | 09-12-2011 at 03:30 |
| P/F of Almn. Work & Fittings for Construction of Vertical Extension of Guru Teg Bahadur Bhawan (3rd Floor) in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| S/E/T/C for A.C.(Cassette type) on the 1st Floor of Paramedical Science (Block-I) & (Block-II)in P. | 14-12-2011 | 19-12-2011 at 03:30 | 19-12-2011 at 03:30 |
| S/E/T/C for A.C.(Cassette type) on the 1st Floor of Paramedical Science (Block-I) & (Block-II)in P.U. Chd. | |||
| Construction Office | |||
| Electrical Installation for Computer Lab of Computer Unit (First Floor) in Aruna Ranjit Chandra Hall | 08-12-2011 | 13-12-2011 at 03:30 | 13-12-2011 at 04:30 |
| Electrical Installation for Computer Lab of Computer Unit (First Floor) in Aruna Ranjit Chandra Hall in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing flood lights behind Girls Hostel No.1/ adjoining P.U. Health Centre in Panjab University C | 09-12-2011 | 09-12-2011 at 03:30 | 09-12-2011 at 04:30 |
| Providing flood lights behind Girls Hostel No.1/ adjoining P.U. Health Centre in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Renovation of toilets (ladies/Gents) at Department of Gandhian Studies in Panjab University Campus, | 12-12-2011 | 15-12-2011 at 03:30 | 15-12-2011 at 03:30 |
| Renovation of toilets (ladies/Gents) at Department of Gandhian Studies in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Water proofing treatment of roof of Student Centre building in P.U. Campus sector-14, Chandigarh | 01-12-2011 | 05-12-2011 | 05-12-2011 at 03:30 |
| Water proofing treatment of roof of Student Centre building in P.U. Campus sector-14, Chandigarh | |||
| Construction Office | |||
| Renovation of Gymnasium Building in P.U. Campus, Sector-14, Chandigarh. | 21-11-2011 | 25-11-2011 at 03:30 | 25-11-2011 at 03:30 |
| Renovation of Gymnasium Building in P.U. Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing and laying road strip in Panjab University Campus Sec-14 &25 Chandigarh | 08-11-2011 | 11-11-2011 at 03:30 | 11-11-2011 at 03:30 |
| Providing and laying road strip in Panjab University Campus Sec-14 &25 Chandigarh | |||
| Construction Office | |||
| Making provision of 3 phase connection for X-Ray machine in Health Centre in Panjab University Campu | 08-11-2011 | 14-11-2011 at 03:30 | 14-11-2011 at 04:30 |
| Making provision of 3 phase connection for X-Ray machine in Health Centre in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Electrical point for cooler installed in Administrative Office in various branches (Examin | 03-11-2011 | 03-11-2011 at 03:30 | 03-11-2011 at 04:30 |
| Providing Electrical point for cooler installed in Administrative Office in various branches (Examination I, II, III, IV) (20 nos.) in Panjab University, Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Tenders for Benches and Chairs | 31-10-2011 | 03-11-2011 at 03:30 | 03-11-2011 at 03:30 |
| Sr. No. Description of items Qty. for Three college 1. Benches for Students 1500 2. Big size table for library 21 3. Book shelf Almirahs 75 4. Chair for library 150 5. Officer Table & Chair for Admn. Office 3+3 6. Office Tables and Office Chair 12+60 7. Computer tables and Computer Chairs 9+9 8. Big size Tables for staff room 9 9. Chairs for Staff room and Common room 150 10. Notice Board 15 11. Green Board (Magnetic) 15 12. Office Almirahs 30 13. Sofa set along with center table 12 14. Principal Chair and Table 3+3 15. Generator sets 125 KVA 3 16. Air Conditioner(split) Make: Voltas, Hitachi, Carrier 15 | |||
| Conduct Branch | |||
| Supply of Answer Books | 28-10-2011 | 14-11-2011 at 15:00 | 14-11-2011 at 16:00 |
| Supply of Answer Books of 36 and 40 Pages having OMR front cover containing 3 barcodes. | |||
| Conduct Branch | |||
| “Tender for Supply of Answer Books” | 28-10-2011 | 14-11-2011 at 03:00 | 14-11-2011 at 04:00 |
| “Tender for Supply of Answer Books” | |||
| Construction Office | |||
| Renovation of lab under PURSE in Physics Deptt in P.U. Campus Sector-14 Chandigarh. | 04-11-2011 | 09-11-2011 at 03:30 | 09-11-2011 at 03:30 |
| Renovation of lab under PURSE in Physics Deptt in P.U. Campus Sector-14 Chandigarh. | |||
| Dr. Harvansh Singh Judge Institute of Dental Sciences & Hospital | |||
| Purchase of Equipment | 19-10-2011 | 11-11-2011 at 15:00 | 11-11-2011 at 16:00 |
| Purchase of Equipment | |||
| Construction Office | |||
| Replacement of rolling shutter of T-1/16 in Panjab University Campus, Sector-25, Chandigarh. | 18-10-2011 | 27-10-2011 at 03:30 | 27-10-2011 at 03:30 |
| Replacement of rolling shutter of T-1/16 in Panjab University Campus, Sector-25, Chandigarh. | |||
| Construction Office | |||
| Providing and fixing B.R.C. Fabric Grills & Polycarbonate sheets on cut outs at terrace in Deptt. | 21-10-2011 | 02-11-2011 at 03:30 | 02-11-2011 at 03:30 |
| Providing and fixing B.R.C. Fabric Grills & Polycarbonate sheets on cut outs at terrace in Deptt. Of U.I.L.S (5 year) Building in P.U. Campus Sec-14, Chandigarh. | |||
| Construction Office | |||
| Renovation of wash room & toilets at Construction Office in Panjab University Campus Sec-14 Chandi | 18-10-2011 | 21-10-2011 at 03:30 | 21-10-2011 at 03:30 |
| Renovation of wash room & toilets at Construction Office in Panjab University Campus Sec-14 Chandigarh | |||
| Construction Office | |||
| VArious Tendors | 03-11-2011 | 08-11-2011 at 05:00 | 09-11-2011 at 10:00 |
| 1. Boring of trench wells for recharge with roof top runoff after collecting in the Entire Campus Sector-14, Chandigarh. 2. Boring of trench wells for recharge with surface runoff after collecting in the Entire Campus Sector-14, Chandigarh. 3. Structure for the injection wells work Rain Water harvesting and artificial recharge to ground water in the entire campus of Panjab University Sector-14, Chandigarh. | |||
| Construction Office | |||
| Making provision of 3 phase connection for X-Ray machine in Health Centre in Panjab University Campu | 17-10-2011 | 21-10-2011 at 03:30 | 21-10-2011 at 04:30 |
| Making provision of 3 phase connection for X-Ray machine in Health Centre in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Electrical point for cooler installed in Administrative Office in various branches (Examin | 21-10-2011 | 21-10-2011 at 03:30 | 21-10-2011 at 04:30 |
| Providing Electrical point for cooler installed in Administrative Office in various branches (Examination I, II, III, IV) (20 nos.) in Panjab University, Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| S/E/T/C of Air Conditioner | 10-10-2011 | 14-10-2011 at 13:00 | 18-10-2011 at 17:00 |
| S/E/T/C of Air Conditioner (cassette type on the Ground Floor (Bay No. 10 to 22)of Paramedical Science (Block-I) in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Construction | 10-10-2011 | 20-10-2011 at 13:00 | 27-10-2011 at 17:00 |
| Construction of Hostel For International Students And Research Scholars in P.U. South Campus, Chandigarh Construction of 6 Nos. Type-III houses and 6 Nos. Type-IV houses in P.U. South Campus, Chandigarh Construction/Extension of Alumni House Building in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Providing Electrical Installation for the Construction of Boys Hostel No. 1 | 10-10-2011 | 14-10-2011 at 13:00 | 18-10-2011 at 17:00 |
| Providing Electrical Installation for the Construction of Boys Hostel No. 1 (5th & 6th Floor) in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Replacement of rolling shutter | 10-10-2011 | 12-10-2011 at 15:00 | 12-10-2011 at 15:00 |
| Replacement of rolling shutter of T-1/16 in Panjab University Campus, Sector-25, Chandigarh. | |||
| Accounts Branch | |||
| Rate contract for Chemicals and Laboratory material | 31-08-2011 | 19-10-2011 | 19-10-2011 |
| Sealed applications are invited from the reputed manufactures/authorized distributors/authorized dealers for entering into the Rate Contract for supply of chemicals and laboratory material | |||
| Construction Office | |||
| Replacement of rolling shutter of T-1/16 in Panjab University Campus, Sector-25, Chandigarh. | 07-10-2011 | 12-10-2011 at 03:30 | 12-10-2011 at 03:30 |
| Replacement of rolling shutter of T-1/16 in Panjab University Campus, Sector-25, Chandigarh. | |||
| Construction Office | |||
| Provision of Temporary Cabin at Second Floor Arts College Block no. 3 (Department of Economics) in | 07-10-2011 | 13-10-2011 at 03:30 | 13-10-2011 at 03:30 |
| Provision of Temporary Cabin at Second Floor Arts College Block no. 3 (Department of Economics) in Panjab University Campus Sector -14, Chandigarh | |||
| Construction Office | |||
| Providing and fixing Guide maps to be installed at various site in Panjab University Campus Sector | 13-10-2011 | 20-10-2011 at 03:30 | 20-10-2011 at 03:30 |
| Providing and fixing Guide maps to be installed at various site in Panjab University Campus Sector-14, Chandigarh | |||
| University Institute of Engineering & Technology | |||
| An open auction for old Student chairs (103) of in UIET, Sector25 South Campus, Panjab University | 05-10-2011 | 12-10-2011 at 10:00 | 12-10-2011 at 10:00 |
| An open auction for old Student chairs (103) of in UIET, Sector25 South Campus, Panjab University will be held on 12.10.2011 at 10.A.M. At the UIET, Block-I premises | |||
| Dean Students Welfare | |||
| Quotation of Sound & Lights | 05-10-2011 | 17-10-2011 at 05:00 | 17-10-2011 at 05:00 |
| Quotation of Sound & Lights SOUND ; Need complete JBL Line array sound series ( 12 inches) having 2500 watts each. must be mounted on two trusses on each side of the stage. 1.TOPS = 10 6 Will be on the stage. 4 will be out side of the stage. Each TOP must not be less than 1500 Watts. Total Wattage required for tops 15000 Watts. 2. MONITORS = 8 2 for Sartaaj. 2 for left-hand side musicians. 2 for right-hand side musicians. Each monitor must not be less than 2000 Watts. Total Wattage required for monitors 12000 Watts. 3. BASS = 10 2 Will be on the stage. 4 Will be outside of the stage. Each bass must not be less than 2500 Watts. Total Wattage required for bass is 15000 Wattage. TOTAL WATTAGE REQUIRED FOR 1+2+3 = 100000 WATTS 4 .MICS - a) Corus -> 2 MICS b) Tabla -> 2 MICS c) Dhol -> 2 MICS d) Sartaj -> 1 MIC e) Guitar -> 1 Lead f) Octopad -> 1 Lead g) Keyboard -> 1 Lead h) Cordless MICS -> 2 . Equalisers -> 4 Double Delay. 6. Mixtures -> YAMAHA AG 3212. STAGE DIMENSIONS Stage dimensions must not less than 50 feet ( Front) X 30 feet (back Depth) X 7 feet ( Height).With a central platform for sartaaj having dimensions... 6 feet (front) x 4 feet (back depth) x 1.25 feet(height) Proper Decoration of the stage to be maintained with appropriate theme of the night,along with back stage flex and side standees LIGHTS Lighting include following items 1. PAR lights - 200 watts - 30 pieces 2. LEDs - 500 watts - 20 pieces 3. Scanners - 1500 watts - 8 pieces 4. Moving Heads - 2000 watts - 4 pices 5. Focus light - 6000 watts - 1 piece 6. Beam light and - two on each side of the stage 7. Leasers. - one piece all items must be mounted on 4 trusses all around the stage | |||
| Construction Office | |||
| Providing and fixing B.R.C. Fabric Grills & Polycarbonate sheets on cut outs at terrace in Deptt. | 07-10-2011 | 12-10-2011 at 03:30 | 12-10-2011 at 03:30 |
| Providing and fixing B.R.C. Fabric Grills & Polycarbonate sheets on cut outs at terrace in Deptt. Of U.I.L.S (5 year) Building in P.U. Campus Sec-14, Chandigarh. | |||
| Construction Office | |||
| Providing and Fixing Barbed Wire around the under ground water tank at the main pump in Panjab Un | 07-10-2011 | 12-10-2011 at 03:30 | 12-10-2011 at 03:30 |
| Providing and Fixing Barbed Wire around the under ground water tank at the main pump in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Construction of Footpath upto emerging area Social science in Panjab University Campus Sec-14, Cha | 07-10-2011 | 12-10-2011 at 03:30 | 12-10-2011 at 03:30 |
| Construction of Footpath upto emerging area Social science in Panjab University Campus Sec-14, Chandigarh | |||
| Construction Office | |||
| Sealed items rate basis are invited from the firms/contractors for the following works. | 21-09-2011 | 10-10-2011 | 10-10-2011 |
| Construction Of Guru Teg Bahadur Building In P.U. Campus, Sector-14, Chandigarh Construction Of (2nd Phase) Vt. Extension of Guest House Building In P.U. Campus, Sector-14, Chandigarh Construction Of (2nd Phase) Women Sports Hostel In P.U. Campus, Sector- 14, Chandigarh Construction of Extension (2nd Phase) of Community Centre in P.U. South Campus, Chandigarh. | |||
| Construction Office | |||
| Providing and fixing B.R.C. Fabric Grills & Polycarbonate sheets on cut outs at terrace in Deptt. Of | 16-09-2011 | 20-09-2011 at 03:30 | 20-09-2011 at 03:30 |
| Providing and fixing B.R.C. Fabric Grills & Polycarbonate sheets on cut outs at terrace in Deptt. Of U.I.L.S (5 year) Building in P.U. Campus Sec-14, Chandigarh. | |||
| Construction Office | |||
| Boost up water to roof tank of UIHMT building in Panjab University Campus, Sector-14, Chandigarh. | 20-09-2011 | 26-09-2011 at 03:30 | 26-09-2011 at 03:30 |
| Boost up water to roof tank of UIHMT building in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Construction & Renovation of Opening Branch of State Bank of Patiala at S.S.G.P.U.R.C in Bajwara , H | 19-09-2011 | 26-09-2011 at 03:30 | 26-09-2011 at 03:30 |
| Construction & Renovation of Opening Branch of State Bank of Patiala at S.S.G.P.U.R.C in Bajwara , Hoshiarpur (Pb). | |||
| Construction Office | |||
| Providing Electrical installation in PURSE Laboratory in Physics Department in Panjab University Cam | 19-09-2011 | 23-09-2011 at 03:30 | 23-09-2011 at 04:30 |
| Providing Electrical installation in PURSE Laboratory in Physics Department in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Provision of Changeover for Genset in Panel at U.I.L.S. in Panjab University Campus, Sector -14, Cha | 19-09-2011 | 23-09-2011 at 03:30 | 23-09-2011 at 04:30 |
| Provision of Changeover for Genset in Panel at U.I.L.S. in Panjab University Campus, Sector -14, Chandigarh. | |||
| Construction Office | |||
| Providing Electrical Panels in Arts Block-3 (Ground Floor) in University Business School in Panjab U | 19-09-2011 | 23-09-2011 at 03:30 | 23-09-2011 at 03:30 |
| Providing Electrical Panels in Arts Block-3 (Ground Floor) in University Business School in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing Electrical Fixtures in Political Sciences in Panjab University campus, Sector -14, Chand | 12-09-2011 | 16-09-2011 at 03:30 | 16-09-2011 at 04:30 |
| Providing Electrical Fixtures in Political Sciences in Panjab University campus, Sector -14, Chandigarh | |||
| Construction Office | |||
| Providing Electrical fixtures and ceiling fan in Hindi department and adjoining departments in Art | 19-09-2011 | 19-09-2011 at 03:30 | 23-09-2011 at 04:30 |
| Providing Electrical fixtures and ceiling fan in Hindi department and adjoining departments in Arts Block no.2 in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing Electrical point for cooler installed in Administrative Office in various branches (Exami | 23-09-2011 | 23-09-2011 at 03:30 | 23-09-2011 at 04:30 |
| Providing Electrical point for cooler installed in Administrative Office in various branches (Examination I, II, III, IV) (20 nos.) in Panjab University, Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Replacing the old Broken wooden sitting stand with new ones in sports ground. | 09-09-2011 | 13-09-2011 at 03:30 | 13-09-2011 at 03:30 |
| Replacing the old Broken wooden sitting stand with new ones in sports ground. | |||
| Construction Office | |||
| Furnishing Gallery for the Tennis Court in Sports Ground in Panjab University Campus, Sector-14 Chan | 06-09-2011 | 13-09-2011 at 03:30 | 13-09-2011 at 03:30 |
| Furnishing Gallery for the Tennis Court in Sports Ground in Panjab University Campus, Sector-14 Chandigarh. | |||
| Construction Office | |||
| Providing and fixing B.R.C. Fabric Grills & Polychromatic sheets on cut outs at terrace in Deptt. Of | 06-09-2011 | 09-09-2011 at 03:30 | 09-09-2011 at 03:30 |
| Providing and fixing B.R.C. Fabric Grills & Polychromatic sheets on cut outs at terrace in Deptt. Of U.I.L.S (5 year) Building in P.U. Campus Sec-14, Chandigarh | |||
| Construction Office | |||
| Various Tender | 06-09-2011 | 12-09-2011 at 03:30 | 12-09-2011 at 03:30 |
| 1. Construction Of (2nd Phase) Building for Paramedical science (Block-I) In P.U. South Campus, Chandigarh 2. Construction Of (2nd Phase) Building for Paramedical science (Block-II) In P.U. South Campus, Chandigarh 3. Renovation/Extension of Golden Jubilee Guest House Building in P.U. Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Various Quotations | 01-09-2011 | 20-09-2011 at 03:30 | 20-09-2011 at 03:30 |
| 1. MS Angle (40x40x5) 3784.5kgs. 2. MS Round Bar (12mm) 1557 kgs. 3. Welding rods 10 no. Wt. 2.500kg. per pkt.(ISI) 60pkts. 4. Iron cutting blade (edges on both side) 50 nos. 5. Synthetics Paint (white colour) 12 ltrs. 6. Iron rimer 8 ltrs. 7. Tarpine oil 8 ltrs. 8. Paint Brush 3” 3 nos. | |||
| Construction Office | |||
| Garbage container (dustbin) of 4.5 cum capacity for tractor | 01-09-2011 | 22-09-2011 at 03:30 | 22-09-2011 at 03:30 |
| Garbage container (dustbin) of 4.5 cum capacity for tractor drawn Container Lifter made with MS sheet thickness of 10 SWG on the base and sides of 12 SWG and shall be fabricated out of 14 SWG. Sides and base will be strengthened with MS angle 40x40x5mm and channel of size 75x40mm. Containers will be provided with four doors on the top and one door at the back for loading and unloading of garbage duly coated with anti rust primer and two coats of fine quality enamel paint complete in all respects | |||
| Department of Microbiology | |||
| TENDER DOCUMENTS FOR CATERING SERVICES | 02-09-2011 | 12-09-2011 at 16:00 | 13-09-2011 at 15:00 |
| TENDER DOCUMENTS FOR CATERING SERVICES FOR THE PARTICIPANTS OF 52nd ANNUAL CONFERENCE OF ASSOCIATION OF MICROBIOLOGIST OF INDIA. Conference Website: http://ami2011.puchd.ac.in | |||
| Construction Office | |||
| Replacing the old Broken wooden sitting stand with new ones in sports ground. | 26-08-2011 | 02-09-2011 at 03:30 | 02-09-2011 at 03:30 |
| Replacing the old Broken wooden sitting stand with new ones in sports ground. | |||
| Construction Office | |||
| Furnishing Gallery for the Tennis Court in Sports Ground in Panjab University Campus, Sector-14 Chan | 26-08-2011 | 02-09-2011 at 03:30 | 02-09-2011 at 03:30 |
| Furnishing Gallery for the Tennis Court in Sports Ground in Panjab University Campus, Sector-14 Chandigarh | |||
| Construction Office | |||
| Making provision of heating system in the existing nos 1.5 ton split Air Conditioner in Vice Chancel | 24-08-2011 | 02-09-2011 at 03:30 | 02-09-2011 at 03:30 |
| Making provision of heating system in the existing nos 1.5 ton split Air Conditioner in Vice Chancellor in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Replacement of Asbestos sheets on the roof of workshop of U.I.E.T in Panjab University Campus, Secto | 24-08-2011 | 30-08-2011 at 03:30 | 30-08-2011 at 03:30 |
| Replacement of Asbestos sheets on the roof of workshop of U.I.E.T in Panjab University Campus, Sector-25, Chandigarh | |||
| Construction Office | |||
| Providing electrical installation in Legal Aid Clinic in U.I.L.S Deptt in Panjab University Campus, | 24-08-2011 | 01-09-2011 at 03:30 | 01-09-2011 at 04:30 |
| Providing electrical installation in Legal Aid Clinic in U.I.L.S Deptt in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing Electrical Fixtures in Political Sciences in Panjab University campus, Sector -14, Chand | 24-08-2011 | 01-09-2011 at 03:30 | 01-09-2011 at 04:30 |
| Providing Electrical Fixtures in Political Sciences in Panjab University campus, Sector -14, Chandigarh. | |||
| Construction Office | |||
| Providing and fixing Guide maps to be installed at various site in Panjab University Campus Sector-1 | 23-08-2011 | 30-08-2011 at 03:30 | 30-08-2011 at 03:30 |
| Providing and fixing Guide maps to be installed at various site in Panjab University Campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing and fixing A.C. unit at Tele-Calling center/Single window enquiry office in Aruna Ranjit C | 16-08-2011 | 23-08-2011 at 03:30 | 23-08-2011 at 03:30 |
| Providing and fixing A.C. unit at Tele-Calling center/Single window enquiry office in Aruna Ranjit Chandra Hall in Panjab University Campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing and fixing Guide maps to be installed at various site in Panjab University Campus Sector-1 | 17-08-2011 | 23-08-2011 at 03:30 | 23-08-2011 at 03:30 |
| Providing and fixing Guide maps to be installed at various site in Panjab University Campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Establishment of a Tele-Calling center/Single window enquiry office in Aruna Ranjit Chandra Hall in | 16-08-2011 | 23-08-2011 at 03:30 | 23-08-2011 at 03:30 |
| Establishment of a Tele-Calling center/Single window enquiry office in Aruna Ranjit Chandra Hall in Panjab University Campus Sector -14, Chandigarh. | |||
| Construction Office | |||
| Construction of approach road (back side) of G.H. 1&2 in Panjab University Campus, Sector-14 , Ch | 16-08-2011 | 23-08-2011 at 03:30 | 23-08-2011 at 03:30 |
| Construction of approach road (back side) of G.H. 1&2 in Panjab University Campus, Sector-14 , Chandigarh. | |||
| Construction Office | |||
| Replacement of Asbestos sheets on the roof of workshop of U.I.E.T in Panjab University Campus, Secto | 08-08-2011 | 12-08-2011 at 03:30 | 12-08-2011 at 03:30 |
| Replacement of Asbestos sheets on the roof of workshop of U.I.E.T in Panjab University Campus, Sector-25, Chandigarh | |||
| Construction Office | |||
| Providing and Laying of Fibre Glass Sheets On Existing Open Wash Area Including Widening of Khurra A | 12-08-2011 | 19-08-2011 at 05:00 | 19-08-2011 at 05:00 |
| Providing and Laying of Fibre Glass Sheets On Existing Open Wash Area Including Widening of Khurra And Other Allied Jobs in Girls Hostel No. 7 in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| S/E/C/T Air Conditioning (Cassette type) on the Ground Floor of Paramedical Science Block-I in P.U. | 12-08-2011 | 19-08-2011 at 05:00 | 19-08-2011 at 05:00 |
| S/E/C/T Air Conditioning (Cassette type) on the Ground Floor of Paramedical Science Block-I in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Providing and Laying ‘LA’ Water Line Pipe Line Around The Building For Centre of Emerging Area in Sc | 23-08-2011 | 29-08-2011 at 05:00 | 29-08-2011 at 05:00 |
| Providing and Laying ‘LA’ Water Line Pipe Line Around The Building For Centre of Emerging Area in Science and Technology (Block-II & III) in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Various Tenders | 12-08-2011 | 25-08-2011 at 03:30 | 25-08-2011 at 03:30 |
| 1. Construction /Extension Of All Weather Swimming Pool in P.U. Campus, Sector-14, Chandigarh 2. Construction/Extension of Centre for I.A.S. and other Competitive Exams on the 2nd Floor in P.U. Campus, Sector-14, Chandigarh 3. Construction of Conference Hall of Vice-Chancellor’s Office in P.U. Campus, Sector-14, Chandigarh 4. Construction of Servant Quarters In Boys Hostel No. 1&2 in P.U. Campus, Sector-14, Chandigarh 5. Construction of Servant Quarters In Boys Hostel No. 3 in P.U. Campus, Sector-14, Chandigarh 6. Construction of Servant Quarters In Boys Hostel No.5 in P.U. Campus, Sector-14, Chandigarh 7. Construction of Servant Quarters In Boys Hostel No. 7 in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing and Laying ‘LA’ Water Line Pipe Line Around The Building For Centre of Emerging Area in Sc | 25-08-2011 | 29-08-2011 at 05:00 | 29-08-2011 at 05:00 |
| Providing and Laying ‘LA’ Water Line Pipe Line Around The Building For Centre of Emerging Area in Science and Technology (Block-I & IV) in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Renovation of toilets of 'C' Houses in Panjab University Campus, Sector-14, Chandigarh. | 04-08-2011 | 10-08-2011 at 03:30 | 10-08-2011 at 03:30 |
| Renovation of toilets of 'C' Houses in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Re-wiring in Museum of Anthropology Department in Panjab University campus Sector-14, Chandigarh | 08-08-2011 | 12-08-2011 at 03:30 | 12-08-2011 at 04:30 |
| Re-wiring in Museum of Anthropology Department in Panjab University campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Rewiring in Auditorium of fourth floor of University School of Open Learning Building in Panjab Univ | 08-08-2011 | 12-08-2011 at 03:30 | 12-08-2011 at 04:30 |
| Rewiring in Auditorium of fourth floor of University School of Open Learning Building in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Electrical installation for computer Lab in University Institute of Legal Studies in University Law | 01-08-2011 | 05-08-2011 at 03:30 | 05-08-2011 at 04:30 |
| Electrical installation for computer Lab in University Institute of Legal Studies in University Law School in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Various Tender | 21-07-2011 | 29-07-2011 at 01:00 | 02-08-2011 at 05:00 |
| 1. Construction of Servant Quarters In Boys Hostel No. 1&2 in P.U. Campus, Sector-14, Chandigarh 2. Construction of Servant Quarters In Boys Hostel No. 3 in P.U. Campus, Sector-14, Chandigarh 3. Construction of Servant Quarters In Boys Hostel No.5 in P.U. Campus, Sector-14, Chandigarh 4. Construction of Servant Quarters In Boys Hostel No. 7 in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| S/E/C/T for 1 to 250 KVA DG Set for U.I.E.T. Building in P.U. South Campus, Chandigarh | 21-07-2011 | 29-07-2011 at 01:00 | 02-08-2011 |
| S/E/C/T for 1 to 250 KVA DG Set for U.I.E.T. Building in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Various Tender | 21-07-2011 | 29-07-2011 at 01:00 | 02-08-2011 at 05:00 |
| 1. Providing 8 Passenger Elevator & Electrical Installation in Lift Well and Machine Room Less with Buyback of Existing Lift in A.C. Joshi Library in P.U. Campus, Sector-14, Chandigarh 2. Providing 8 Passenger Elevator & Electrical Installation in Lift Well and Machine Room Less Building of Emerging Area in science and Technology in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| quotation | 18-07-2011 | 29-07-2011 at 03:30 | 29-07-2011 at 03:30 |
| 1. MS Angle (40x40x5) 3784.5kgs. 2. MS Round Bar (12mm) 1557 kgs. 3. Welding rods 10 no. Wt. 2.500kg. per pkt.(ISI) 60pkts. 4. Iron cutting blade (edges on both side) 50 nos. 5. Synthetics Paint (white colour) 12 ltrs. 6. Iron Primer 8 ltrs. 7. Tarpine Oil 8 ltrs. 8. Paint Brush 3” 3 nos. | |||
| Construction Office | |||
| Providing electrical installation in Legal Aid Clinic in U.I.L.S Deptt in Panjab University Campus, | 22-07-2011 | 27-07-2011 at 03:30 | 27-07-2011 at 04:30 |
| Providing electrical installation in Legal Aid Clinic in U.I.L.S Deptt in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Name of work : Providing & Fixing False ceiling and Storage Cabinet at Accounts Branch in Administr | 14-07-2011 | 15-07-2011 at 03:00 | 15-07-2011 at 03:00 |
| Name of work : Providing & Fixing False ceiling and Storage Cabinet at Accounts Branch in Administrative Block Panjab University Campus Sector -14, Chandigarh. | |||
| Directorate of Sports | |||
| “SUPPLY OF SPORTS EQUIPMENT/ARTICLES” | 13-07-2011 | 27-07-2011 at 03:00 | 27-07-2011 at 03:30 |
| “SUPPLY OF SPORTS EQUIPMENT/ARTICLES” | |||
| Directorate of Sports | |||
| “SUPPLY OF SPORTS UNIFORM” | 13-07-2011 | 27-07-2011 at 03:00 | 27-07-2011 at 03:30 |
| “SUPPLY OF SPORTS UNIFORM” | |||
| Construction Office | |||
| Various quotations | 13-07-2011 | 20-07-2011 at 03:30 | 20-07-2011 |
| various quotations | |||
| Construction Office | |||
| Electrical Installation (to install the four split A.C.) for Computer centre deptt. of Computer Sc | 19-07-2011 | 26-07-2011 at 03:30 | 26-07-2011 at 04:30 |
| Electrical Installation (to install the four split A.C.) for Computer centre deptt. of Computer Sciences & applications in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Re-wiring in Museum of Anthropology Department in Panjab University campus Sector-14, Chandigarh | 19-07-2011 | 26-07-2011 at 03:30 | 26-07-2011 at 04:40 |
| Re-wiring in Museum of Anthropology Department in Panjab University campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing electrical installation in Legal Aid Clinic in U.I.L.S Deptt in Panjab University Campus | 13-07-2011 | 18-07-2011 at 03:30 | 18-07-2011 at 04:30 |
| Providing electrical installation in Legal Aid Clinic in U.I.L.S Deptt in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing electrical connection of 25 HP submersible pump in P.U. Student center in Panjab Univers | 19-07-2011 | 26-07-2011 at 03:30 | 26-07-2011 at 03:30 |
| Providing electrical connection of 25 HP submersible pump in P.U. Student center in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Rewiring in Auditorium of fourth floor of University School of Open Learning Building in Panjab Un | 19-07-2011 | 26-07-2011 at 03:30 | 26-07-2011 at 03:30 |
| Rewiring in Auditorium of fourth floor of University School of Open Learning Building in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Various Tender | 08-07-2011 | 22-07-2011 at 03:30 | 22-07-2011 at 03:30 |
| 1. Benches for Students 1500 2. Big size table for library 21 3. Book shelf Almirahs 75 4. Chair for library 150 5. Generator sets 125 KVA 3 6. Air Conditioner(split) Make: Voltas, Hitachi, Carrier 15 | |||
| Directorate of Sports | |||
| Raw Material for fencing of main grounds | 13-07-2011 | 28-07-2011 at 03:00 | 28-07-2011 at 03:30 |
| 1. Diamond shaped galvanized 8661 Kgs. Rs.35 Lac Chain linked fencing size 50x50x4mm 2.Wire mesh is supported with 37067 Kgs. 65x65x8 mm M S Angle 3.Wire mesh is supported with 8808 Kgs. 40x6mm M S Flat 4.Wire mesh is supported with 4183 Kgs. 40x40x6mm M S Angle in centre of each cage for strengthening the mesh 5.Welding Rods 367 Pkt. 6.Nut Bolts 100 Kgs. | |||
| Directorate of Sports | |||
| “SUPPLY OF SPORTS MEDALS” | 13-07-2011 | 27-07-2011 at 03:00 | 27-07-2011 at 03:30 |
| “SUPPLY OF SPORTS MEDALS” | |||
| Directorate of Sports | |||
| “SUPPLY OF SPORTS UNIFORM” | 13-07-2011 | 27-07-2011 at 03:00 | 27-07-2011 at 03:30 |
| “SUPPLY OF SPORTS UNIFORM” | |||
| Directorate of Sports | |||
| “SUPPLY OF SPORTS EQUIPMENT/ARTICLES” | 13-07-2011 | 27-07-2011 at 03:00 | 27-07-2011 at 03:30 |
| “SUPPLY OF SPORTS EQUIPMENT/ARTICLES” | |||
| Construction Office | |||
| Various tender | 12-07-2011 | 22-07-2011 at 03:30 | 22-07-2011 at 03:30 |
| various tender | |||
| Construction Office | |||
| Providing and Laying Water Line Near U.I.A.M.S./C.I.I.P.P. Cell Building and Emerging Area Buildings | 12-07-2011 | 19-07-2011 at 05:00 | 19-07-2011 at 05:00 |
| Providing and Laying Water Line Near U.I.A.M.S./C.I.I.P.P. Cell Building and Emerging Area Buildings in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Providing Apex Exterior Paint to the Exterior R.C.C. Surface For the Building of Women Hostel No. 8 | 12-07-2011 | 19-07-2011 at 05:00 | 19-07-2011 at 05:00 |
| Providing Apex Exterior Paint to the Exterior R.C.C. Surface For the Building of Women Hostel No. 8 in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Providing Air Conditioning (Cassette type) on the Ground Floor of Paramedical Science Block-I in P.U | 12-07-2011 | 22-07-2011 at 05:00 | 22-07-2011 at 05:00 |
| Providing Air Conditioning (Cassette type) on the Ground Floor of Paramedical Science Block-I in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Supply of Furniture | 06-07-2011 | 12-07-2011 at 15:30 | 12-07-2011 |
| Please quote your lowest market rate for the supply of the furniture in a sealed cover marked on the envelope “QUOTATION DUE ON 12.07.2011 at 3.30 p.m,” along with your other terms and conditions of supply, if any. | |||
| Construction Office | |||
| Rewinding of motors of various capacity | 06-07-2011 | 08-07-2011 | 12-07-2011 |
| Rewinding of motors of various capacity in Panjab University Campus, Sector-14 and South campus, Chandigarh. | |||
| A. C. Joshi Library | |||
| Strengthning of Beams of Ground Floor | 06-07-2011 | 08-07-2011 | 12-07-2011 |
| Strengthning of Beams of Ground Floor of Law Department at S.S.G.P.U.R.C in Bajwara , Hoshiarpur(Pb). | |||
| Construction Office | |||
| Extension of Boundary Wall and fencing | 06-07-2011 | 08-07-2011 | 12-07-2011 |
| Extension of Boundary Wall and fencing in Boys Hostel at SSGPURC Hoshiarpur. | |||
| Establishment Branch | |||
| Applications are invited from Advertising Agencies (INS Accredited) | 29-06-2011 | 04-07-2011 | 04-07-2011 |
| Applications are invited from Advertising Agencies (INS Accredited) for empanelment | |||
| Construction Office | |||
| Boring of trench wells work Rain Water harvesting Construction of Legal Aid Clinic Ramp | 01-07-2011 | 07-07-2011 at 17:00 | 08-07-2011 at 10:00 |
| Boring of trench wells work Rain Water harvesting and artificial recharge to ground water in the Entire Campus Sector-14, Chandigarh. Construction of Legal Aid Clinic Ramp in UILS building in P.U. Campus Sector-14, Chandigarh. Extension of Health Centre in P.U. Campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Electrical Installation for Extension & Renovation of Health Centre | 23-06-2011 | 06-07-2011 at 17:00 | 06-06-2011 at 17:00 |
| Providing Electrical Installation for Extension & Renovation of Health Centre in Panjab University Campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Repair of wall | 23-06-2011 | 06-07-2011 at 17:00 | 06-07-2011 at 17:00 |
| Repair of wall in DUI office staff room in P.U. Campus Sector-14, Chandigarh. | |||
| University Institute of Engineering & Technology | |||
| TENDER DOCUMENT FOR PURCHASE OF SOFTWARE/EQUIPMENTS | 18-06-2011 | 08-07-2011 at 10:00 | 08-07-2011 at 11:00 |
| TENDER DOCUMENT FOR PURCHASE OF SOFTWARE/EQUIPMENTS | |||
| Construction Office | |||
| Rewiring (Recessed type) | 16-06-2011 | 24-06-2011 at 15:00 | 24-06-2011 at 16:30 |
| Rewiring (Recessed type) in. A type houses (65 nos.) in P.U. Campus, Sec-14 & sec-25 Chd. Rewiring (Recessed type) in. E-1 type houses (15 nos.) in P.U. Campus, Sec-14, Chd. Rewiring (Recessed type) in. T-3 type houses (18 nos.) in P.U. south campus, Sec-25, Chd. Rewiring of 1st & 2nd block and Mess in Boys Hostel No 6 , PU Campus, Sector-14, Chd. | |||
| Establishment Branch | |||
| DAVP Rates: INS accredited firms/agencies | 14-06-2011 | 15-06-2011 | 15-06-2011 |
| The Directorate of Audio and Visual Publicity (DAVP), Ministry of Information & Broadcasting, Government of India has considered Panjab University as eligible to issue advertisements at DAVP rates. The Panjab University intends to empanel Advertising agencies, who may be willing to work for the University on the basis of DAVP rates. Consent of such willing INS accredited firms/agencies should reach, through e.mail at drestt@pu.ac.in, latest by 12.00 Noon tomorrow i.e. 15th June, 2011 | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .07 in Panjab University Campus , Sec- | 08-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .07 in Panjab University Campus , Sec-14, Chandigarh. | |||
| Construction Office | |||
| Parking for Girl Hostel no. 7 in Panjab University Campus, Sector-14, Chandigarh. | 06-06-2011 | 21-06-2011 at 05:00 | 21-06-2011 at 05:00 |
| Parking for Girl Hostel no. 7 in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Additional car and scooter parking at DHSJ institute of Dental Science & Hospital Sec-25, Chandigarh | 06-06-2011 | 21-06-2011 at 05:00 | 21-06-2011 at 05:00 |
| Additional car and scooter parking at DHSJ institute of Dental Science & Hospital Sec-25, Chandigarh | |||
| Construction Office | |||
| White washing in Girls Hostel No .1 & 2 in Panjab University Campus ,Sector-14, Chandigarh. | 03-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| White washing in Girls Hostel No .1 & 2 in Panjab University Campus ,Sector-14, Chandigarh. | |||
| Construction Office | |||
| White washing in Girls Hostel No .3 to 7 in Panjab University Campus ,Sector-14, Chandigarh. | 03-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| White washing in Girls Hostel No .3 to 7 in Panjab University Campus ,Sector-14, Chandigarh. | |||
| Construction Office | |||
| White washing in Boys Hostel No .1 to 3 in Panjab University Campus ,Sector-14, Chandigarh. | 03-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| White washing in Boys Hostel No .1 to 3 in Panjab University Campus ,Sector-14, Chandigarh. | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Girls Hostel No .05 in Panjab University Campus , Sec | 03-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Girls Hostel No .05 in Panjab University Campus , Sec-14, Chandigarh. | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Girls Hostel No .04 in Panjab University Campus , Sec | 03-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Girls Hostel No .04 in Panjab University Campus , Sec-14, Chandigarh. | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Girls Hostel No .03 in Panjab University Campus , Se | 04-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Girls Hostel No .03 in Panjab University Campus , Sec-14, Chandigarh. | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Girls Hostel No .03 in Panjab University Campus , Se | 04-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Girls Hostel No .03 in Panjab University Campus , Sec-14, Chandigarh. | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Girls Hostel No .02 in Panjab University Campus , | 03-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Girls Hostel No .02 in Panjab University Campus , Sec-14, Chandigarh. | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Girls Hostel No .01 in Panjab University Campus , Sec | 03-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Girls Hostel No .01 in Panjab University Campus , Sec-14, Chandigarh. | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .06 in Panjab University Campus , Sec- | 03-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .06 in Panjab University Campus , Sec-14, Chandigarh. | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .05 in Panjab University Campus , Sec- | 03-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .05 in Panjab University Campus , Sec-14, Chandigarh. | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .04 in Panjab University Campus , Sec- | 03-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .04 in Panjab University Campus , Sec-14, Chandigarh. | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .03 in Panjab University Campus , Sec- | 03-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .03 in Panjab University Campus , Sec-14, Chandigarh. | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .02 in Panjab University Campus, Sec-1 | 03-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .02 in Panjab University Campus, Sec-14, Chandigarh | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .01 in Panjab University Campus , Sec- | 03-06-2011 | 16-06-2011 at 05:00 | 16-06-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .01 in Panjab University Campus , Sec-14, Chandigarh. | |||
| Construction Office | |||
| Supply of material for Construction of Building for Paramedical Sciences (Block-I) in P.U. | 02-06-2011 | 10-06-2011 at 03:30 | 10-06-2011 at 03:30 |
| Supply of following material for Construction of Building for Paramedical Sciences (Block-I) in P.U. South Campus,Chandigarh | |||
| Construction Office | |||
| Providing and Laying Centrifugally Water ‘LA’ Pipe Line With Lead Jointing for Paramedical Science B | 02-06-2011 | 20-06-2011 at 05:00 | 20-06-2011 at 05:00 |
| Providing and Laying Centrifugally Water ‘LA’ Pipe Line With Lead Jointing for Paramedical Science Block-I to Main M.C. Water Line in P.U. South Campus, Chandigarh. | |||
| Construction Office | |||
| Providing and Fixing P.V.C. Water Storage Tanks with Electric Motor For Storage At Ground Floor and | 02-06-2011 | 20-06-2011 at 05:00 | 20-06-2011 at 05:00 |
| Providing and Fixing P.V.C. Water Storage Tanks with Electric Motor For Storage At Ground Floor and Coonecting with P.V.C. Tanks at 4th Storey of Golden Jubilee Guest House Building for Regular Water Supply of Academic Staff College Guest House in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Providing Electrical Installation for Renovation of Health Centre in Panjab University Campus Sector | 31-05-2011 | 14-06-2011 at 05:00 | 14-06-2011 at 05:00 |
| Providing Electrical Installation for Renovation of Health Centre in Panjab University Campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Renovation of Toilets for Health Centre Building in Panjab University Campus, Sector-14, Chandigarh. | 03-06-2011 | 10-06-2011 at 05:00 | 10-06-2011 at 05:00 |
| Renovation of Toilets for Health Centre Building in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing wiring for Electrical Call Bells in Girls Hostel No.8 & 10 In P.U. South and Sector-14 Cam | 30-05-2011 | 06-06-2011 at 05:00 | 06-06-2011 at 05:00 |
| Providing wiring for Electrical Call Bells in Girls Hostel No.8 & 10 In P.U. South and Sector-14 Campus, Chandigarh. | |||
| Construction Office | |||
| Rewiring (Recessed type) in Sanskrit Department, Arts Block no-1(Ground Floor) in Panjab University | 06-06-2011 | 10-06-2011 at 03:30 | 10-06-2011 at 04:30 |
| Rewiring (Recessed type) in Sanskrit Department, Arts Block no-1(Ground Floor) in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Addition / Alteration/ Rewiring in General Branch in Administrative Office in Panjab University Camp | 06-06-2011 | 10-06-2011 at 03:30 | 10-06-2011 at 04:30 |
| Addition / Alteration/ Rewiring in General Branch in Administrative Office in Panjab University Campus, Sector-14, Chandiga | |||
| University Institute of Pharmaceutical Sciences | |||
| Renovation of laboratories | 27-05-2011 | 02-06-2011 at 17:00 | 02-06-2011 at 17:00 |
| Renovation of laboratories (lab no. 17 and 33) for laying of kota stone floors, shelf tiles, plumbing work etc. | |||
| Construction Office | |||
| Construction of ramp for Physically Challenged students of UILS Building (5 years law) in Panj | 30-05-2011 | 07-06-2011 at 05:00 | 07-06-2011 at 05:00 |
| Construction of ramp for Physically Challenged students of UILS Building (5 years law) in Panjab University campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Renovation of Legal Aid Clinic room, renovation of director room in Panjab University Campus, Sect | 30-05-2011 | 07-06-2011 at 05:00 | 07-06-2011 at 05:00 |
| Renovation of Legal Aid Clinic room, renovation of director room in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing electrical Installation in Law College (Ground floor) at SSGPURC Bajwara Hoshiarpur. | 30-05-2011 | 08-06-2011 at 05:00 | 08-06-2011 at 05:00 |
| Providing electrical Installation in Law College (Ground floor) at SSGPURC Bajwara Hoshiarpur. | |||
| Construction Office | |||
| Construction of approach road for paramedical science block-I & Block-II in Panjab University Sector | 02-06-2011 | 09-06-2011 at 05:00 | 10-06-2011 at 10:00 |
| Construction of approach road for paramedical science block-I & Block-II in Panjab University Sector-25, Chandigarh. | |||
| Directorate of Sports | |||
| DIRECTORATE OF SPORTS “SUPPLY OF SPORTS MEDALS” | 24-05-2011 | 20-06-2011 at 03:00 | 20-06-2011 at 03:00 |
| DIRECTORATE OF SPORTS PANJAB UNIVERSITY CHANDIGARH TENDER DOCUMENT " SUPPLY OF SPORTS MEDALS” | |||
| Directorate of Sports | |||
| DIRECTORATE OF SPORTS PANJAB UNIVERSITY CHANDIGARH TENDER DOCUMENT FOR | 24-05-2011 | 20-06-2011 at 03:00 | 20-06-2011 at 03:30 |
| DIRECTORATE OF SPORTS PANJAB UNIVERSITY CHANDIGARH TENDER DOCUMENT “SUPPLY OF SPORTS EQUIPMENT/ARTICLES | |||
| Directorate of Sports | |||
| DIRECTORATE OF SPORTS PANJAB UNIVERSITY CHANDIGARH “SUPPLY OF SPORTS UNIFORM” | 24-05-2011 | 20-06-2011 at 03:00 | 20-06-2011 at 03:30 |
| DIRECTORATE OF SPORTS PANJAB UNIVERSITY CHANDIGARH “SUPPLY OF SPORTS UNIFORM” | |||
| Directorate of Sports | |||
| “SUPPLY OF SPORTS EQUIPMENT/ARTICLES” CAMPUS SPORTS | 24-05-2011 | 20-06-2011 at 03:00 | 20-06-2011 at 03:30 |
| PANJAB UNIVERSITY CAMPUS SPORTS “SUPPLY OF SPORTS EQUIPMENT/ARTICLES” | |||
| Directorate of Sports | |||
| “SUPPLY OF SPORTS UNIFORM” Campus Sports | 24-05-2011 | 20-06-2011 at 03:00 | 20-06-2011 at 03:30 |
| P. U. CHANDIGARH CAMPUS SPORTS “SUPPLY OF SPORTS UNIFORM” | |||
| Dean Students Welfare | |||
| Contractorship for running the Messes, Canteens and Shops | 24-05-2011 | 10-06-2011 at 17:00 | 21-06-2011 at 10:00 |
| Applications are invited from the interested persons for contractorship for running the Messes, Canteens and Shops in Panjab University Hostels for the session 2011-12. | |||
| Construction Office | |||
| Various Tenders | 24-05-2011 | 01-06-2011 at 05:00 | 02-06-2011 at 10:00 |
| 1 Construction /Extension Of All Weather Swimming Pool in P.U. Campus, Sector-14, Chandigarh 2 Construction/Extension of Centre for I.A.S. and other Competitive Exams on the 2nd Floor in P.U. Campus, Sector-14, Chandigarh 3 Construction of Conference Hall of Vice-Chancellor’s Office in P.U. Campus, Sector-14, Chandigarh 4 Construction of Hostel For International Students And Research Scholars in P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Rewinding of motors of various capacity in Panjab University Campus, Sector-14 and South campus, Cha | 31-05-2011 | 04-06-2011 at 05:00 | 04-06-2011 at 05:00 |
| Rewinding of motors of various capacity in Panjab University Campus, Sector-14 and South campus, Chandigarh | |||
| Construction Office | |||
| Repair of wall in DUI office staff room in P.U. Campus Sector-14, Chandigarh | 31-05-2011 | 04-06-2011 at 05:00 | 04-06-2011 at 05:00 |
| Repair of wall in DUI office staff room in P.U. Campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Girls Hostel No .05 in Panjab University Campus | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Girls Hostel No .05 in Panjab University Campus | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Girls Hostel No .04 in Panjab University Campus | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Girls Hostel No .04 in Panjab University Campus | |||
| Construction Office | |||
| Parking for Girl Hostel no. 7 in Panjab University Campus, Sector-14, Chandigarh | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Parking for Girl Hostel no. 7 in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Additional car and scooter parking at DHSJ institute of Dental Science & Hospital Sec-25, Chandigar | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Additional car and scooter parking at DHSJ institute of Dental Science & Hospital Sec-25, Chandigarh | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Girls Hostel No .03 in Panjab University Campus | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Girls Hostel No .03 in Panjab University Campus | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Girls Hostel No .02 in Panjab University Campus | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Girls Hostel No .02 in Panjab University Campus | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Girls Hostel No .01 in Panjab University Campus | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Girls Hostel No .01 in Panjab University Campus | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .07 in Panjab University Campus | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .07 in Panjab University Campus | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .06 in Panjab University Campus | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .06 in Panjab University Campus | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .05 in Panjab University Campus | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .05 in Panjab University Campus | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .04 in Panjab University Campus | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .04 in Panjab University Campus | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .03 in Panjab University Campus | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .03 in Panjab University Campus | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .02 in Panjab University Campus | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .02 in Panjab University Campus | |||
| Construction Office | |||
| Snowcem /Apex and pointing of external area of Boys Hostel No .01 in Panjab University Campus | 27-05-2011 | 31-05-2011 at 05:00 | 31-05-2011 at 05:00 |
| Snowcem /Apex and pointing of external area of Boys Hostel No .01 in Panjab University Campus Corrigendum: >Notice Inviting Tender Due On 31.05.2011. Subject: Regarding condition no. 2 as “depositing: Notice Inviting Tender Due On 31.05.2011. Subject: Regarding condition no. 2 as “depositing Rs 500/ instead of Rs. 100/” | |||
| Construction Office | |||
| White washing/distemper of E-I, F, G , T-I, T-II, Teacher Flats and warden houses in Panjab Unive | 24-05-2011 | 27-05-2011 at 05:00 | 27-05-2011 at 05:00 |
| White washing/distemper of E-I, F, G , T-I, T-II, Teacher Flats and warden houses in Panjab University Campus | |||
| Construction Office | |||
| White washing/distemper of A, B, C, D, E, T-III, T-IV in Panjab University Campus, Sector-14 and S | 24-05-2011 | 27-05-2011 at 05:00 | 27-05-2011 at 05:00 |
| White washing/distemper of A, B, C, D, E, T-III, T-IV in Panjab University Campus, Sector-14 and South Campus | |||
| University School of Open Learning | |||
| Tender for Type-setting/Printing and Binding etc. | 18-05-2011 | 01-06-2011 at 16:00 | 01-06-2011 at 16:00 |
| Tender for Type-setting/Printing and Binding etc. Session 2011-2012 | |||
| Construction Office | |||
| Re-wiring in Museum of Anthropology Department in Panjab University campus Sector-14, Chandigarh. | 23-05-2011 | 27-05-2011 at 03:30 | 27-05-2011 at 04:30 |
| Re-wiring in Museum of Anthropology Department in Panjab University campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Re-wiring in Museum of Anthropology Department in Panjab University campus Sector-14, Chandigarh. | 23-05-2011 | 27-05-2011 at 03:30 | 27-05-2011 at 04:30 |
| Re-wiring in Museum of Anthropology Department in Panjab University campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Rewiring in Auditorium of fourth floor of University School of Open Learning Building in Panjab Un | 23-05-2011 | 27-05-2011 at 03:30 | 27-05-2011 at 04:30 |
| Rewiring in Auditorium of fourth floor of University School of Open Learning Building in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Rewiring (Recessed type) in Sanskrit Department, Arts Block no-1(Ground Floor) in Panjab Universit | 23-05-2011 | 27-05-2011 at 03:30 | 27-05-2011 at 04:30 |
| Rewiring (Recessed type) in Sanskrit Department, Arts Block no-1(Ground Floor) in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing electrical connection of 25 HP submersible pump in P.U. Student center in Panjab Univers | 18-05-2011 | 23-05-2011 at 03:30 | 23-05-2011 at 03:30 |
| Providing electrical connection of 25 HP submersible pump in P.U. Student center in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Addition / Alteration/ Rewiring in General Branch in Administrative Office in Panjab University | 23-05-2011 | 27-05-2011 at 03:30 | 27-05-2011 at 04:30 |
| Addition / Alteration/ Rewiring in General Branch in Administrative Office in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Electrical Installation (to install the four split A.C.) for Computer centre deptt. of Computer Sc | 23-05-2011 | 27-05-2011 at 03:30 | 27-05-2011 at 04:30 |
| Electrical Installation (to install the four split A.C.) for Computer centre deptt. of Computer Sciences & applications in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Supply and Carriage of Cement including unloading and stacking at store of P.U., Sector-25, Chandiga | 23-05-2011 | 30-05-2011 at 03:30 | 30-05-2011 at 04:30 |
| Supply and Carriage of Cement including unloading and stacking at store of P.U., Sector-25, Chandigarh. As per ISI specification with latest amendments in Jute/HDPE Bags of 50 kg, net weight: a) Ordinary Portland Cement 43 grade duly ISI marked IS 8112/1989-43. App.Qty : ------------------------- 50,000 Bags. i)F.O.R. at P.U. Store Sector-25, Chandigarh 50,000 Bags | |||
| Construction Office | |||
| Providing and Laying External Water Supply Around The Up-gradation of Shopping Centre in P | 20-05-2011 | 27-05-2011 at 05:00 | 27-05-2011 at 05:00 |
| Providing and Laying External Water Supply Around The Up-gradation of Shopping Centre in P.U. Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing and Fixing P.V.C. Water Storage Tanks With Electric Motor For Storage at Ground Floor and | 20-05-2011 | 24-05-2011 at 05:00 | 27-05-2011 at 05:00 |
| Providing and Fixing P.V.C. Water Storage Tanks With Electric Motor For Storage at Ground Floor and Connecting With P.V.C. Tanks at 4th Storey of Golden Jubilee Guest House Building for Regular Water Supply of Academic Staff College Guest House in P.U. Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Laying strom water line near Radha Krishan Mandir to main Hole (Near Main entry of International Sch | 20-05-2011 | 24-05-2011 at 05:00 | 24-05-2011 at 05:00 |
| Laying strom water line near Radha Krishan Mandir to main Hole (Near Main entry of International School Building of Panjab University Campus Sector-14, Chandigarh | |||
| Construction Office | |||
| P/F Granite Stone on stairs of Arts Block No.01 in Panjab University Campus Sector-14, Chandigarh. | 20-05-2011 | 24-05-2011 at 05:00 | 24-05-2011 at 05:00 |
| P/F Granite Stone on stairs of Arts Block No.01 in Panjab University Campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Water proofing (Shot Creating Treatment) of roof of Gandhi Bhawan Buildings in Panjab University Cam | 20-05-2011 | 24-05-2011 at 05:00 | 24-05-2011 at 05:00 |
| Water proofing (Shot Creating Treatment) of roof of Gandhi Bhawan Buildings in Panjab University Campus, Sector-14, Chandigarh | |||
| Department of Biotechnology | |||
| Real Time PCR & CD Spectropolarimeter | 02-05-2011 | 20-05-2011 at 13:00 | 20-05-2011 at 15:00 |
| Sealed tenders are invited by the Chairperson (Biotechnology) for providing Real Time PCR & CD Spectropolarimeter Corrigendum: >Corrigendum: The technical specification at Sr. No. 11 should be read as The system should have minimum 2 emission filter which will be upgradable to 4 emission filter | |||
| Construction Office | |||
| Providing wiring for Electrical Call Bells in Girls Hostel No.8 In P.U. South Campus, Chandigarh. | 05-05-2011 | 09-05-2011 at 05:00 | 09-05-2011 at 05:00 |
| Providing wiring for Electrical Call Bells in Girls Hostel No.8 In P.U. South Campus, Chandigarh. | |||
| Construction Office | |||
| Providing wiring for Electrical Call Bells in Girls Hostel No.7 In P.U. Campus, Sector-14,Chandigarh | 05-05-2011 | 09-05-2011 at 05:00 | 09-05-2011 at 05:00 |
| Providing wiring for Electrical Call Bells in Girls Hostel No.7 In P.U. Campus, Sector-14,Chandigarh. | |||
| Construction Office | |||
| Electrical Installation (to install the four split A.C.) for Computer centre deptt. of Computer Scie | 09-05-2011 | 13-05-2011 at 03:30 | 13-05-2011 at 04:30 |
| Electrical Installation (to install the four split A.C.) for Computer centre deptt. of Computer Sciences & applications in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Re-wiring in Museum of Anthropology Department in Panjab University campus Sector-14, Chandigarh. | 09-05-2011 | 13-05-2011 at 03:30 | 13-05-2011 at 04:30 |
| Re-wiring in Museum of Anthropology Department in Panjab University campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Rewiring in Auditorium of fourth floor of University School of Open Learning Building in Panjab Univ | 09-05-2011 | 13-05-2011 at 03:30 | 13-05-2011 at 04:30 |
| Rewiring in Auditorium of fourth floor of University School of Open Learning Building in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Addition / Alteration/ Rewiring in General Branch in Administrative Office in Panjab University Camp | 09-05-2011 | 13-05-2011 at 03:30 | 13-05-2011 at 04:30 |
| Addition / Alteration/ Rewiring in General Branch in Administrative Office in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Rewiring (Recessed type) in Sanskrit Department, Arts Block no-1(Ground Floor) in Panjab University | 09-05-2011 | 13-05-2011 at 03:30 | 13-05-2011 at 04:30 |
| Rewiring (Recessed type) in Sanskrit Department, Arts Block no-1(Ground Floor) in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Construction of approach road for paramedical science block-I & Block-II in Panjab University Sector | 09-05-2011 | 13-05-2011 at 10:00 | 13-05-2011 at 10:00 |
| Construction of approach road for paramedical science block-I & Block-II in Panjab University Sector-25, Chandigarh. Cost of Form = Rs. 500/- each. | |||
| Construction Office | |||
| Renovation of Legal Aid Clinic room, renovation of director room in Panjab University Campus, Sect | 09-05-2011 | 12-05-2011 at 05:00 | 12-05-2011 at 05:00 |
| Renovation of Legal Aid Clinic room, renovation of director room in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Cement pointing and snowcem on boundary walls of Women Hostel no. 3 to 7 in Panjab University Campus | 09-05-2011 | 12-05-2011 at 05:00 | 09-05-2011 at 05:00 |
| Cement pointing and snowcem on boundary walls of Women Hostel no. 3 to 7 in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Rewinding of motors of various capacity in Panjab University Campus, Sector-14 and South campus, Cha | 05-05-2011 | 10-05-2011 at 05:00 | 10-05-2011 at 05:00 |
| Rewinding of motors of various capacity in Panjab University Campus, Sector-14 and South campus, Chandigarh. | |||
| Construction Office | |||
| Various Tenders | 21-04-2011 | 28-04-2011 at 05:00 | 29-04-2011 at 10:00 |
| 1. Construction of approach road for paramedical science block-I & Block-II in Panjab University Sector-14, Chandigarh. 2. Legal Aid Clinic in UILS building in P.U. Campus Sec-14, Chandigarh | |||
| Construction Office | |||
| Construction of R.C.C. frame structure work of Multipurpose Auditorium In P.U. South Campus, Chandig | 11-04-2011 | 21-04-2011 at 03:30 | 21-04-2011 at 03:30 |
| Construction of R.C.C. frame structure work of Multipurpose Auditorium In P.U. South Campus, Chandigarh. | |||
| Construction Office | |||
| Rewiring (Recessed type) in Sanskrit Department, Arts Block no-1(Ground Floor) in Panjab University | 04-04-2011 | 08-04-2011 at 03:30 | 08-04-2011 at 04:30 |
| Rewiring (Recessed type) in Sanskrit Department, Arts Block no-1(Ground Floor) in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Electrical Panels /Cables in place of ordinary switch gears for distribution of load as DG | 04-04-2011 | 08-03-2011 at 03:30 | 08-04-2011 at 04:30 |
| Providing Electrical Panels /Cables in place of ordinary switch gears for distribution of load as DG sets in Botany Department in Panjab University campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Addition / Alteration/ Rewiring in General Branch in Administrative Office in Panjab University Ca | 04-04-2011 | 08-04-2011 at 03:30 | 08-04-2011 at 04:30 |
| Addition / Alteration/ Rewiring in General Branch in Administrative Office in Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| P/F/C/T Of Street Lighting For Approach Road TO U.I.A.M.S. & C.I.I.P.P. Cell In P.U. South Campus, | 31-03-2011 | 08-04-2011 at 05:00 | 08-04-2011 at 05:00 |
| P/F/C/T Of Street Lighting For Approach Road TO U.I.A.M.S. & C.I.I.P.P. Cell In P.U. South Campus, Chandigarh. | |||
| A. C. Joshi Library | |||
| Repair & Extend the height of boundary wall back side of UILS building in Panjab University Campus, | 29-03-2011 | 31-03-2011 at 05:00 | 31-03-2011 at 05:00 |
| Repair & Extend the height of boundary wall back side of UILS building in Panjab University Campus, Sector-14 Chandigarh. | |||
| Construction Office | |||
| Extention of Library space in Law deptt. in Panjab University Campus Sector-14, Chandigarh. | 29-03-2011 | 31-03-2011 at 05:00 | 31-03-2011 at 05:00 |
| Extention of Library space in Law deptt. in Panjab University Campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Converting cycle shed into office in Deptt. Of physics in Panjab University Campus, Sector-14, Chan | 29-03-2011 | 31-03-2011 at 05:00 | 31-03-2011 at 05:00 |
| Converting cycle shed into office in Deptt. Of physics in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Various Tenders----Electrical | 31-03-2011 | 05-04-2011 at 03:00 | 05-04-2011 at 04:30 |
| 1. Rewiring of 1st & 2nd block and Mess in Boys Hostel No 6 , PU Campus, Sector-14, Chd. 2. Replacement of submain cable and sub panels for Boys Hostel no 1 to 5 in Panjab University Campus, Sector-14, Chandigarh 3. Rewiring (Recessed type) in. A type houses (65 nos.) in P.U. Campus, Sec-14 & sec-25 Chd. 4. Rewiring (Recessed type) in. E-1 type houses (15 nos.) in P.U. Campus, Sec-14, Chd. 5. Rewiring (Recessed type) in. T-3 type houses (18 nos.) in P.U. south campus, Sec-25, Chd. | |||
| Dean Students Welfare | |||
| INFRASTRUCTURE REQUIREMENTS FOR Jhankaar 2011 | 17-03-2011 | 24-03-2011 | 24-03-2011 |
| Infrastructure requirements for Jhankaar to be held on the 27, 28 & 29st march 2011. | |||
| Construction Office | |||
| Maintenance of Public Health work in Women Hotel No. 1 to 8, Working Women Hostel and Sports Hostel | 21-03-2011 | 25-03-2011 at 05:00 | 25-03-2011 at 05:00 |
| Maintenance of Public Health work in Women Hotel No. 1 to 8, Working Women Hostel and Sports Hostel in Panjab University Campus, Sec-14, Chandigarh. | |||
| Construction Office | |||
| Cleaning of main sewer lines and storm water lines in all diameters in the Panjab University Campus, | 21-03-2011 | 25-03-2011 at 05:00 | 25-03-2011 at 05:00 |
| Cleaning of main sewer lines and storm water lines in all diameters in the Panjab University Campus, Sector-14 & South Campus, Chandigarh | |||
| Construction Office | |||
| Operating of existing pump house in various sites in tubewell in Panjab University Campus, Sector-14 | 21-03-2011 | 25-03-2011 at 05:00 | 25-03-2011 at 05:00 |
| Operating of existing pump house in various sites in tubewell in Panjab University Campus, Sector-14 & 25, Chandigarh. | |||
| Construction Office | |||
| Maintenance of Public Health work in Boys Hostel No. 1 to 8 and operating of 1 H.P. Water Pump in B | 21-03-2011 | 25-03-2011 at 05:00 | 25-03-2011 at 05:00 |
| Maintenance of Public Health work in Boys Hostel No. 1 to 8 and operating of 1 H.P. Water Pump in Boys Hostel No.1 to 8 in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Maintenance of Public Health in non-residential buildings(Arts Block) in Panjab University Campus, | 21-03-2011 | 25-03-2011 at 05:00 | 25-03-2011 at 05:00 |
| Maintenance of Public Health in non-residential buildings(Arts Block) in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Maintenance of Public Health in non-residential buildings in U.I.E.T. & Dental College in Panjab Uni | 21-03-2011 | 25-03-2011 at 05:00 | 25-03-2011 at 05:00 |
| Maintenance of Public Health in non-residential buildings in U.I.E.T. & Dental College in Panjab University South Campus, Chandigarh. | |||
| Construction Office | |||
| Maintenance of Public Health in non-residential buildings(Science Block) in Panjab University Campus | 21-03-2011 | 25-03-2011 at 05:00 | 25-03-2011 at 05:00 |
| Maintenance of Public Health in non-residential buildings(Science Block) in Panjab University Campus, Sector-14, Chandigarh | |||
| Dean Students Welfare | |||
| Quotations are invited for Panjab University Campus Student Council’s annual function Jhankaar 2011 | 07-03-2011 | 12-03-2011 at 17:00 | 12-03-2011 at 17:00 |
| Quotations are invited for Panjab University Campus Student Councils annual function Jhankaar 2011 being organized for three days i.e. 1416, March, 2011 in University Campus, Chandigarh. The requirements are as under: 1. Sound System 2. Tent Material 1. Generator 62 KV (silent) 2. Two Seater Sofa 3. Cane Chair 4. Dunlope Chairs 5. Dunlope Chairs with cover 6. Green Carpet per sq.feet 7. Helogen Light 8. Niwar Larri per feet 9. Licchi Larri per larri 10. Centre Table 11. Curtains 15x15 for Tent 12. 3x6 Wooden Table 13. Proper Barricading per sq.feet. 3. Printing Material 1. Printing of poster 2”x6” 2. Printing of Flex per sq.feet 3. Printing of Back Drop per sq.feet with frame 4. Printing of Back Drop per sq.feet without frame 4. Providing Breakfast, Lunch and Dinner approximately for 200 persons per meal 5. Photographs 4x6 and Videography 6. Mementos For more information please see the link or contact DSW office. | |||
| Construction Office | |||
| Extension of Parking for Panjab University Health centre in Panjab University Campus, Sector14, Cha | 04-03-2011 | 18-03-2011 at 05:00 | 18-03-2011 at 05:00 |
| Extension of Parking for Panjab University Health centre in Panjab University Campus, Sector14, Chandigarh | |||
| Construction Office | |||
| Construction of front drive ways of FType houses in Panjab University Campus, Sect | 04-03-2011 | 18-03-2011 at 05:00 | 18-03-2011 at 05:00 |
| Construction of front drive ways of FType houses in Panjab University Campus, Sector14, Chandigarh. | |||
| Construction Office | |||
| Providing and fixing B.R.C Fabric Grills in Room No 1421 in Health Centre in Panjab University Ca | 04-03-2011 | 11-03-2011 at 05:00 | 11-03-2011 at 05:00 |
| Providing and fixing B.R.C Fabric Grills in Room No 1421 in Health Centre in Panjab University Campus sector14 Chandigarh | |||
| Construction Office | |||
| Providing and fixing B.R.C Fabric Grills to windows of the Biophysics Deptt in Panjab University Cam | 04-03-2011 | 15-03-2011 at 05:00 | 15-03-2011 at 05:00 |
| Providing and fixing B.R.C Fabric Grills to windows of the Biophysics Deptt in Panjab University Campus Sector14, Chandigarh. | |||
| Construction Office | |||
| RepairExtend the height of boundary wall back side of UILS building in Panjab University Campus, | 04-03-2011 | 17-03-2011 at 05:00 | 17-03-2011 at 05:00 |
| RepairExtend the height of boundary wall back side of UILS building in Panjab University Campus, Sector14 Chandigarh | |||
| Construction Office | |||
| Extention of Library space in Law deptt. in Panjab University Campus Sector14, Chandigarh. | 04-03-2011 | 15-03-2011 at 05:00 | 15-03-2011 at 05:00 |
| Extention of Library space in Law deptt. in Panjab University Campus Sector14, Chandigarh. | |||
| Construction Office | |||
| Various tenders | 04-03-2011 | 24-03-2011 at 05:00 | 25-03-2011 at 10:00 |
| Various tenders | |||
| Registration & Stores (R & S) | |||
| Supply of OMR Scanner with Bar Code Reader | 17-02-2011 | 09-03-2011 at 10:00 | 09-03-2011 at 11:00 |
| 1. Tenders for supply of OMR scanner with bar code reader is invited from tenderer. Only Tenders received upto 10.00 A.M. on 09.03.2011 will be eligible for consideration as per Tender Notice and shall be further subject to the terms and conditions | |||
| Department of Biophysics | |||
| Tender for the supply of Atomic Absorption Spectrometer | 07-02-2011 | 25-02-2011 at 03:00 | 25-02-2011 at 03:00 |
| Tender for the supply of Atomic Absorption Spectrometer | |||
| Department of Biophysics | |||
| ATOMIC ABSORPTION SPECTROMETER | 08-02-2011 | 25-02-2011 at 15:00 | 25-02-2011 at 15:30 |
| Atomic Absorption Spectrometer | |||
| Conduct Branch | |||
| Hiring of 20 A.C./Non A.C. Taxies on hire basis | 02-02-2011 | 16-02-2011 at 04:00 | 16-02-2011 at 04:00 |
| Hiring of 20 A.C./Non A.C. Taxies on hire basis br / br /Date and Time of opening will be decide later on | |||
| Construction Office | |||
| TENDERS | 17-02-2011 | 24-02-2011 at 05:00 | 25-02-2011 at 10:00 |
| 1. Construction /Extension Of All Weather Swimming Pool in P.U. Campus, Sector14, Chandigarh br /2. Construction/Extension of 2nd Phase of University Institute of Hotel ManagementTourism in P.U. Campus, Sector14, Chandigarh br /3. Const. of Girls Hostel No. 10 in P.U. South Campus, Chanduigarh | |||
| Construction Office | |||
| Construction of R.C.C. frame structure work of Multipurpose Auditorium In P.U. South Campus, Chandig | 14-02-2011 | 21-02-2011 at 03:30 | 21-02-2011 at 03:30 |
| Construction of R.C.C. frame structure work of Multipurpose Auditorium In P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Providing and Laying of Public Health and Sanitary Installed Work | 12-02-2011 | 21-02-2011 at 05:00 | 21-02-2011 at 05:00 |
| Providing and Laying of Public Health and Sanitary Installed Work for the Construction/ Extension of existing Dining Hall for Boys Hostel No. 6 in P.U. Campus, Sector14, Chandigarh | |||
| Construction Office | |||
| Extention of Library space in Law deptt. in Panjab University Campus Sector14, Chandigarh. | 31-01-2011 | 15-02-2011 at 05:00 | 15-02-2011 at 05:00 |
| Extention of Library space in Law deptt. in Panjab University Campus Sector14, Chandigarh. | |||
| Construction Office | |||
| RepairExtend the height of boundary wall back side of UILS building in Panjab University Campus, | 31-01-2011 | 15-02-2011 at 05:00 | 15-02-2011 at 05:00 |
| RepairExtend the height of boundary wall back side of UILS building in Panjab University Campus, Sector14 Chandigarh. | |||
| Construction Office | |||
| Renovation of Entrance Hall of CIL building in Panjab University Campus , Sector 14, Chandigarh | 31-01-2011 | 15-02-2011 at 05:00 | 15-02-2011 at 05:00 |
| Renovation of Entrance Hall of CIL building in Panjab University Campus , Sector 14, Chandigarh | |||
| Department of Microbiology | |||
| Ice Flaking Machine | 25-01-2011 | 04-02-2011 at 05:00 | 07-02-2011 at 03:00 |
| Specifications for Ice Flaking Machine br /1. Ice production : minimum 150kg/24hr or more br /2. Built in storage type br /3. Bin Capacity 35 kg or more br /4. Ecofriendly refrigerant gas br /5. Mounting arrangement: floor standing br /6. Refrigeration contact temperature 25oC br /7. Flake Ice long storage br /8. Fully automatic start and stop when no power or water supply br /9. Anti corrosive material br /10. Low noise br /11. Should operate on 220 V 50 Hz | |||
| Construction Office | |||
| Expression of interest for purchase of Road Sweeping Machine | 22-01-2011 | 05-02-2011 at 05:00 | 05-02-2011 at 05:00 |
| Expression of interest for purchase of Road Sweeping Machine | |||
| Construction Office | |||
| Extention of Library space in Law deptt. in Panjab University Campus Sector14, Chandigarh. | 28-01-2011 | 31-01-2011 at 05:00 | 31-01-2011 at 05:00 |
| Extention of Library space in Law deptt. in Panjab University Campus Sector14, Chandigarh. | |||
| Construction Office | |||
| Construction of Parking in H.S.J. Dental Hospital in Panjab University Campus, Sector25, Chandigarh | 01-02-2011 | 07-02-2011 at 05:00 | 07-02-2011 at 05:00 |
| Construction of Parking in H.S.J. Dental Hospital in Panjab University Campus, Sector25, Chandigarh. | |||
| Construction Office | |||
| Rewiring of 1st2nd block and Mess in Boys Hostel No 6 , PU Campus, Sector14, Chd. | 24-01-2011 | 31-01-2011 at 03:00 | 31-01-2011 at 04:30 |
| Rewiring of 1st2nd block and Mess in Boys Hostel No 6 , PU Campus, Sector14, Chd. | |||
| Construction Office | |||
| Provision of Earthing for newly setup Laboratory (i.e. Central Facility Laboratory) on the first flo | 25-01-2011 | 25-01-2011 at 03:00 | 25-01-2011 at 04:30 |
| Provision of Earthing for newly setup Laboratory (i.e. Central Facility Laboratory) on the first floor of University Institute of Chemical EngineeringTechnology in Panjab University Campus, Sector14, Chandigarh | |||
| Construction Office | |||
| Electrical Installation (to install the four split A.C.) for Computer centre deptt. of Computer Scie | 21-01-2011 | 25-01-2011 at 03:30 | 25-01-2011 at 04:30 |
| Electrical Installation (to install the four split A.C.) for Computer centre deptt. of Computer Sciencesapplications in Panjab University Campus, Sector14, Chandigarh | |||
| Construction Office | |||
| Rewiring (recessed type) in Warden Houses (8 nos.) in Panjab University campus, Sector14, Chandig | 21-01-2011 | 25-01-2011 at 03:30 | 25-01-2011 at 04:30 |
| Rewiring (recessed type) in Warden Houses (8 nos.) in Panjab University campus, Sector14, Chandigarh. | |||
| Construction Office | |||
| Procurement of electrical material | 19-01-2011 | 28-01-2011 at 17:00 | 28-01-2011 at 17:00 |
| Procurement of electrical material for the Construction of following buildings in P.U. Campus, Sector14, Chandigarh. br / br /Date of opening will be decided by JPC. | |||
| Construction Office | |||
| Providing W.S.S.I. for Construction of Vertical Extension | 18-01-2011 | 31-01-2011 at 17:00 | 31-01-2011 at 17:00 |
| Providing W.S.S.I. for Construction of Vertical Extension of Boys Hostel in P.U. South Campus, Chandigarh. br / br /Date of opening will be decided by JPC. | |||
| Construction Office | |||
| Providing and Laying of External Water Supply | 18-01-2011 | 27-01-2011 at 17:00 | 27-01-2011 at 17:00 |
| Providing and Laying of External Water Supply Alround the Paramedical Science BlockI and BlockII Building in P.U. South Campus, Chandigarh. br / br /Date of opening will be decided by JPC. | |||
| Construction Office | |||
| Providing Electrical Installation (Remaining Work) | 18-01-2011 | 31-01-2011 at 17:00 | 31-01-2011 at 17:00 |
| Providing Electrical Installation (Remaining Work) For the Construction of Emerging Area in Social Sciences (1st Floor) In P.U. Campus, Sector14, Chandigarh. br / br /Date of opening will be decided by JPC. | |||
| Construction Office | |||
| P/F/C/T Of Street Lighting | 13-01-2011 | 24-01-2011 at 17:00 | 24-01-2011 at 17:00 |
| P/F/C/T Of Street Lighting For Approach Road TO U.I.A.M.S.C.I.I.P.P. Cell In P.U. South Campus, Chandigarh. br / br /Date of opening will be decided by JPC. | |||
| Construction Office | |||
| Extention of Library space in Law deptt. in Panjab University Campus Sector14, Chandigarh. | 19-01-2011 | 24-01-2011 at 05:00 | 24-01-2011 at 05:00 |
| Extention of Library space in Law deptt. in Panjab University Campus Sector14, Chandigarh. | |||
| Construction Office | |||
| Construction of footpath to Arts Block No .01 in Panjab University campus Sector14, Chandig | 21-01-2011 | 24-01-2011 at 05:00 | 24-01-2011 at 05:00 |
| Construction of footpath to Arts Block No .01 in Panjab University campus Sector14, Chandigarh. | |||
| Construction Office | |||
| Providing and fixing wooden flooring in HI (V.C’s residence) in Panjab University Campus Sector14, | 19-01-2011 | 24-01-2011 at 05:00 | 24-01-2011 at 05:00 |
| Providing and fixing wooden flooring in HI (V.C’s residence) in Panjab University Campus Sector14, Chandigarh. | |||
| Construction Office | |||
| Electrical installation / Renovation in Account Branch in Administrative Block in Panjab University | 19-01-2011 | 24-01-2011 at 05:00 | 24-01-2011 at 05:00 |
| Electrical installation / Renovation in Account Branch in Administrative Block in Panjab University Campus Sector14, Chandigarh | |||
| Construction Office | |||
| Construction of approach road up to emerging area in Panjab University campus Sector14, Chandigarh. | 18-01-2011 | 22-01-2011 at 05:00 | 22-01-2011 at 05:00 |
| Construction of approach road up to emerging area in Panjab University campus Sector14, Chandigarh. | |||
| Construction Office | |||
| Construction /Extension Of All Weather Swimming Pool | 12-01-2011 | 20-01-2011 at 17:00 | 20-01-2011 at 17:00 |
| Construction /Extension Of All Weather Swimming Pool in P.U. Campus, Sector14, Chandigarh. Date of Opening will be decided by JPC. | |||
| Construction Office | |||
| Supply of single phase propeller Type ventilating Fan (Exhaust fan) | 21-01-2011 | 03-02-2011 at 17:00 | 04-02-2011 at 10:00 |
| Supply of single phase propeller Type ventilating Fan (Exhaust fan) 4 pole of size 300mm heavy duty of make Crompton Greeves, usha | |||
| Construction Office | |||
| Providing Electrical Installation for new Computer Lab | 13-01-2011 | 18-01-2011 at 15:30 | 18-01-2011 at 16:30 |
| Providing Electrical Installation for new Computer Lab of Mechanical Deptt. at First Floor in U.I.E.T. in Panjab University, South Campus, Sector25, Chandigarh. | |||
| Construction Office | |||
| Replacement of Submain cables and sub panels in Boys Hostel 15 | 13-01-2011 | 18-01-2011 at 15:30 | 18-01-2011 at 16:30 |
| Replacement of Submain cables and sub panels in Boys Hostel no.1 5 in Panjab University Campus, Sector14, Chandigarh. | |||
| Construction Office | |||
| Renovation of Entrance Hall of CIL building in Panjab University Campus , Sector 14, Chandigarh | 17-01-2011 | 21-01-2011 at 05:00 | 21-01-2011 at 05:00 |
| Renovation of Entrance Hall of CIL building in Panjab University Campus , Sector 14, Chandigarh | |||
| Construction Office | |||
| RepairExtend the height of boundary wall back side of UILS building in Panjab University Campus, | 17-01-2011 | 21-01-2011 at 05:00 | 21-01-2011 at 05:00 |
| RepairExtend the height of boundary wall back side of UILS building in Panjab University Campus, Sector14 Chandigarh | |||
| Construction Office | |||
| Construction of pedestrian path in front of entry of H.S.J. institute of Dental Sciences in Panjab | 17-01-2011 | 21-01-2011 at 05:00 | 21-01-2011 at 05:00 |
| Construction of pedestrian path in front of entry of H.S.J. institute of Dental Sciences in Panjab University South Campus, Chandigarh. | |||
| Registration & Stores (R & S) | |||
| INSTALLATION AND MAINTENANCE OF CCTV SURVEILLANCE SYSTEM | 03-03-2011 | 28-03-2011 at 03:00 | 28-03-2011 at 03:30 |
| TENDER DOCUMENT FOR INSTALLATION AND br /br /MAINTENANCE OF CCTV SURVEILLANCE SYSTEM Corrigendum: >Installation and maintained of CCTV surveillance system: Tender No. 1/R&S installation and maintained of CCTV surveillance system. Last date for Tender submission is extended to 28/03/2011 at 3:30 P.M. and opening at 28/03/2011 at 3:30 P.M.. | |||
| Dean Students Welfare | |||
| purchase of Wooden Bed,Steel Almirah, Dining Table and Dining Chair (Stainless Steel) | 10-01-2011 | 17-01-2011 at 17:00 | 20-01-2011 at 11:30 |
| This office intends to purchase of Wooden Bed,Steel Almirah, Dining Table and Dining Chair (Stainless Steel) for University Hostels for the session 2010-2011 | |||
| Construction Office | |||
| Providing Electrical Installation (Remaining Work) for the Construction of Extension of Botany Deptt | 13-01-2011 | 17-01-2011 | 17-01-2011 |
| Providing Electrical Installation (Remaining Work) for the Construction of Extension of Botany Deptt. Building (7 Bays i.e. 22 to 28) In P.U. Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| P/L/J/T of External Fixtures for Construction of Vertical Extension (2nd Phase) of Boys Hostel In P. | 13-01-2011 | 17-01-2011 | 17-01-2011 |
| P/L/J/T of External Fixtures for Construction of Vertical Extension (2nd Phase) of Boys Hostel In P.U. South Campus, Chandigarh. | |||
| Construction Office | |||
| Providing street light through under ground cable | 06-01-2011 | 12-01-2011 at 17:00 | 14-01-2011 at 16:30 |
| Providing street light through under ground cable on the road between Dusehara Ground to B.H. no.4 security light at gate no.2, A.C. Joshi Library round about to Chemical Engineering Deptt. in Panjab University campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Rewiring (Recessed type) in 10 nos. C type houses | 06-01-2011 | 12-01-2011 at 17:00 | 14-01-2011 at 16:30 |
| Rewiring (Recessed type) in 10 nos. C type houses in Panjab University Campus, Sector-14 and South Campus, Chandigarh | |||
| Construction Office | |||
| Rewiring (Recessed type) in 10 nos. B type | 06-01-2011 | 12-01-2011 at 17:00 | 14-01-2011 at 16:30 |
| Rewiring (Recessed type) in 10 nos. B type houses in Panjab University Campus, Sector-14 and South Campus, Chandigarh. | |||
| Construction Office | |||
| Rewiring (Recessed type) in 5 nos. F type | 06-01-2011 | 12-01-2011 at 17:00 | 14-01-2011 at 16:30 |
| Rewiring (Recessed type) in 5 nos. F type houses in Panjab University Campus, Sector-14 and South Campus, Chandigarh | |||
| Construction Office | |||
| Rewiring (recessed type) in Warden Houses | 06-01-2011 | 12-01-2011 at 17:00 | 14-01-2011 at 16:30 |
| Rewiring (recessed type) in Warden Houses (8 nos.) in Panjab University campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Rewiring (Recessed type) in 5 nos. T-1 houses | 06-01-2011 | 12-01-2011 at 17:00 | 14-01-2011 at 16:30 |
| Rewiring (Recessed type) in 5 nos. T-1 houses in Panjab University, South Campus, Chandigarh. | |||
| Construction Office | |||
| Rewiring in Old Teacher's Flats (21 nos.) | 06-01-2011 | 12-01-2011 at 17:00 | 14-01-2011 at 16:30 |
| Rewiring in Old Teacher's Flats (21 nos.) in Panjab University campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Repair & Extend the height of boundary wall | 06-01-2011 | 11-01-2011 at 17:00 | 11-01-2011 at 17:00 |
| Repair & Extend the height of boundary wall back side of UILS building in Panjab University Campus, Sector-14 Chandigarh. | |||
| Construction Office | |||
| Laying of paver blocks flooring | 07-01-2011 | 11-01-2011 at 17:00 | 11-01-2011 at 17:00 |
| Laying of paver blocks flooring out side the extension of Botany Deptt. in Panjab University campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing and fixing wooden flooring | 06-01-2011 | 11-01-2011 at 17:00 | 11-01-2011 at 17:00 |
| Providing and fixing wooden flooring in H-I (V.C's residence) in Panjab University Campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing fencing / barbed wire and Pit | 07-01-2011 | 11-01-2011 at 17:00 | 11-01-2011 at 17:00 |
| Providing fencing / barbed wire and pit around the D.G. Set at Dental Institute in Panjab University Campus Sector-25 Chandigarh. | |||
| Conduct Branch | |||
| Tender For Waste Paper, Marked Answer-books | 30-12-2010 | 17-01-2011 at 14:30 | 17-01-2011 at 15:00 |
| The Answer Books are stored in the Marked Answer books Store, basement, Aruna Ranjit Chandra Hall (old U.I.E.T. Building), Panjab University, Sector-14, Chandigarh. The tenders in sealed envelopes, marked "TENDER FOR WASTE PAPER, MARKED ANSWER-BOOKS" on the left top of the envelope with an earnest money of Rs.10,000/- (Rupees Ten thousand only) in case of item No.1, Rs.5,000/- (Rupees five thousand only) in case of item No.2 and 3 each (separately). | |||
| Construction Office | |||
| Provision of Earthing for newly setup Laboratory | 04-01-2011 | 04-01-2011 at 15:00 | 04-01-2011 at 16:30 |
| Provision of Earthing for newly setup Laboratory (i.e. Central Facility Laboratory) on the first floor of University Institute of Chemical Engineering & Technology in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing L.T. cable for motor of Tubewell | 04-01-2011 | 04-01-2011 at 15:00 | 04-01-2011 at 16:30 |
| Providing L.T. cable for motor of Tubewell in S.S.G.P.U. Regional centre, Bajwara, Hoshairpur. | |||
| Construction Office | |||
| Replacement of existing panel in Gymnasium hall | 30-12-2010 | 04-01-2011 at 15:00 | 04-01-2011 at 16:30 |
| Replacement of existing panel in Gymnasium hall in Panjab University campus, Sector -14, Chandigarh. | |||
| Construction Office | |||
| Providing Electrical Panels /Cables (Remaining work) in Physics Department | 27-12-2010 | 31-12-2010 at 15:00 | 31-12-2010 at 16:30 |
| Providing Electrical Panels /Cables (Remaining work) in Physics Department in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Electrical Installation for new Computer Lab of Mechanical Deptt. | 27-12-2010 | 31-12-2010 at 15:00 | 31-12-2010 at 16:30 |
| Providing Electrical Installation for new Computer Lab of Mechanical Deptt. at First Floor in U.I.E.T. in Panjab University, South Campus, Sector-25, Chandigarh. | |||
| Construction Office | |||
| Supply of single phase propeller Type ventilating Fan (Exhaust fan) 4 pole of size 300mm heavy duty | 31-12-2010 | 31-12-2010 | 31-12-2010 |
| Supply of single phase propeller Type ventilating Fan (Exhaust fan) 4 pole of size 300mm heavy duty of make Crompton Greeves, usha | |||
| Construction Office | |||
| Providing Permanent Connection From M.C. Line To Medical Institute and Hospital (100 Bedded Hospital | 31-12-2010 | 04-01-2011 | 04-01-2011 at 05:00 |
| Providing Permanent Connection From M.C. Line To Medical Institute and Hospital (100 Bedded Hospital) In P.U. South Campus, Chandigarh | |||
| Construction Office | |||
| Providing Electrical Installation For The Construction of Boys Hostel No. 1 (2nd and 3rd floor) In P | 23-12-2010 | 27-12-2010 | 27-12-2010 at 05:00 |
| Providing Electrical Installation For The Construction of Boys Hostel No. 1 (2nd and 3rd floor) In P.U. South Campus, Chandigarh. | |||
| Construction Office | |||
| Construction of Bitumanstic Parking for Girls Hostel No .07 in Panjab University Campus Sector-14, C | 30-12-2010 | 04-01-2011 at 05:00 | 04-01-2011 at 05:00 |
| Construction of Bitumanstic Parking for Girls Hostel No .07 in Panjab University Campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Provision of work station in the Accounts Branch in Administrative Block in Panjab University Campus | 30-12-2010 | 04-01-2011 at 05:00 | 04-01-2011 at 05:00 |
| Provision of work station in the Accounts Branch in Administrative Block in Panjab University Campus, Sector-14 Chandigarh | |||
| Construction Office | |||
| Electrical installation / Renovation in Account Branch in Administrative Block in Panjab University | 30-12-2010 | 04-01-2011 at 05:00 | 04-01-2011 at 05:00 |
| Electrical installation / Renovation in Account Branch in Administrative Block in Panjab University Campus Sector-14, Chandigarh | |||
| Construction Office | |||
| Construction of footpath to Arts Block No .01 in Panjab University campus Sector-14, Chandig | 30-12-2010 | 04-01-2011 at 05:00 | 04-01-2011 at 05:00 |
| Construction of footpath to Arts Block No .01 in Panjab University campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Construction of approach road up to emerging area in Panjab University campus Sector-14, Chandigarh. | 30-12-2010 | 04-01-2011 at 05:00 | 04-01-2011 at 05:00 |
| Construction of approach road up to emerging area in Panjab University campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Various tenders of Electrical Work | 06-01-2011 | 14-01-2011 at 03:00 | 14-01-2011 at 04:30 |
| Rewiring (Recessed type) in. A type houses (80 nos.) Rewiring (Recessed type) in. E-1 type houses (20 nos.) Rewiring (Recessed type) in. T-3 type houses (18 nos.) Providing street lighting arrangements in P.U South campus, Sec-25 & providing extra lighting pole for CCTV camera near P.U. Gates, Sec-14, Chd. Corrigendum: >CORRIDGENDUM: The date of receipt and opening of tenders with date of opening on 14.01.2011 for (1) Rewiring (Recessed type) in A type houses (80 nos.) in P.U. Campus, Sec-14, Chd. (2) Rewiring (Recessed type) in E-1 type houses (20 nos.) in P.U. Campus, Sec-14, Chd (3) Rewiring (Recessed type) in T-3 type houses (18 nos.) in P.U. Campus, Sec-14, Chd. (4) Providing street lighting arrangements in P.U South campus, Sec-25 & providing extra lighting pole for CCTV camera near P.U. Gates, Sec-14, Chd is extended up to 28.01.2011. Applications for issue of tenders form will be accepted up to 21.01.2011 at 5.00 p.m. Bank receipt/draft of tenders’ fee and bank draft of earnest money will be deposited by the eligible form up to 24.01.2011 at 5.00 p.m. only. All other terms and conditions will remain unchanged. S.D.E. (Electrical) P.U., Chandigarh. | |||
| Construction Office | |||
| Various tenders of Electrical Work | 20-12-2010 | 24-12-2010 at 03:00 | 24-12-2010 at 03:30 |
| Replacement of cable from outdoor panel to indoor panel near lift in institute of Dental Sciences & Hospital Rewiring in Old Teacher’s Flats (21 nos. Rewiring (Recessed type) in 5 nos. T-1 houses Rewiring (Recessed type) in 5 nos. F type houses Rewiring (recessed type) in Warden Houses (8 nos.) Making Provision of enclosure for energy meters in Old Teacher's Flats Providing Under ground cable after dismantling Overhead conductor and poles for the construction of building for provision of additional class rooms at Panjab University Regional Centre, Bajwara, Hoshiarpur. | |||
| Accounts Branch | |||
| Consultancy for implementation of Quality Management System | 15-12-2010 | 04-01-2011 at 11:00 | 06-01-2011 at 02:00 |
| Consultancy for implementation of Quality Management System (i) The last date/time for sale of tender document 04.01.11, 11.00 a.m. (ii) Date and time for pre bid meeting to dispel the doubts, if any or clarification of the scope term and condition of the tender 05.01.11, 11.00 a.m. (iii) The last date/time for receipt of bids 06.01.11, 11.00 a.m. (iv) The last date/time of opening of technical bids 06.01.11, 02.00 p.m. (v) The last date/time of opening of price bids 06.01.11, 04.00 p.m. | |||
| Construction Office | |||
| Rewiring (Recessed type) in 10 nos. C type houses in Panjab University Campus, Sector-14 and South C | 15-12-2010 | 21-12-2010 at 03:00 | 21-12-2010 at 03:30 |
| Rewiring (Recessed type) in 10 nos. C type houses in Panjab University Campus, Sector-14 and South Campus, Chandigarh | |||
| Construction Office | |||
| Rewiring (Recessed type) in 10 nos. B type houses in Panjab University Campus, Sector-14 and South C | 15-12-2010 | 21-12-2010 at 03:00 | 21-12-2010 at 03:30 |
| Rewiring (Recessed type) in 10 nos. B type houses in Panjab University Campus, Sector-14 and South Campus, Chandigarh. | |||
| Construction Office | |||
| Provision of Earthing for newly setup Laboratory (i.e. Central Facility Laboratory) on the first flo | 14-12-2010 | 14-12-2010 at 03:00 | 14-12-2010 at 03:30 |
| Provision of Earthing for newly setup Laboratory (i.e. Central Facility Laboratory) on the first floor of University Institute of Chemical Engineering & Technology in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing L.T. cable for motor of Tubewell in S.S.G.P.U. Regional centre, Bajwara, Hoshairpur. | 14-12-2010 | 14-12-2010 at 03:00 | 14-12-2010 at 03:30 |
| Providing L.T. cable for motor of Tubewell in S.S.G.P.U. Regional centre, Bajwara, Hoshairpur. | |||
| Construction Office | |||
| Providing and Fixing Granite marble in Stairs portion of Directorate of sports Deptt. in Panjab Univ | 15-12-2010 | 21-12-2010 at 05:00 | 21-12-2010 at 05:00 |
| Providing and Fixing Granite marble in Stairs portion of Directorate of sports Deptt. in Panjab University campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Parking for Emerging Area in social science in Panjab University Campus, Sector-14, Chandigarh. | 15-12-2010 | 21-12-2010 at 05:00 | 21-12-2010 at 05:00 |
| Parking for Emerging Area in social science in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Foundation for Machines in Mechanical Labs of U.I.E.T. Deptt. in Panjab University Campus | 15-12-2010 | 21-12-2010 at 05:00 | 21-12-2010 at 05:00 |
| Providing Foundation for Machines in Mechanical Labs of U.I.E.T. Deptt. in Panjab University Campus, Sector-14 Chandigarh. | |||
| Construction Office | |||
| Renovation of Entrance Hall of CIL building in Panjab University Campus , Sector -14, Chandigarh. | 15-12-2010 | 21-12-2010 at 05:00 | 21-12-2010 at 05:00 |
| Renovation of Entrance Hall of CIL building in Panjab University Campus , Sector -14, Chandigarh. | |||
| Construction Office | |||
| Cement pointing and snowcem on boundary wall around Panjab University Campus, Sector-25, Chandigarh | 14-12-2010 | 21-12-2010 at 05:00 | 21-12-2010 at 05:00 |
| Cement pointing and snowcem on boundary wall around Panjab University Campus, Sector-25, Chandigarh | |||
| Conduct Branch | |||
| Sale of waste Paper,Marked Answer -Books | 09-12-2010 | 24-12-2010 at 03:00 | 24-12-2010 at 03:30 |
| Sealed Tenders are invited for sale of (i) Marked Answer-books, (ii) Marked answer-books with adhesive tapes and (iii) other waste paper material | |||
| Construction Office | |||
| Construction of 2nd Phase of Boys Hostel No.1 | 13-12-2010 | 22-12-2010 at 16:30 | 22-12-2010 at 17:00 |
| Construction of 2nd Phase of Boys Hostel No.1 In P.U. South Campus, Chandigarh. | |||
| Construction Office | |||
| Providing L.T. Cable From H-Pole Near Golden Jubilee Guest House | 13-12-2010 | 15-12-2010 | 15-12-2010 |
| Providing L.T. Cable From H-Pole Near Golden Jubilee Guest House to L.T. Panel Near Gymnasium Hall In P.U. Campus, Sector-14, Chandigarh. Date of opening will be decided by JPC | |||
| Construction Office | |||
| Providing Electrical Installation For The Construction of Boys Hostel No. 1 ( | 08-12-2010 | 10-12-2010 | 10-12-2010 |
| Providing Electrical Installation For The Construction of Boys Hostel No. 1 (2nd and 3rd floor) In P.U. South Campus, Chandigarh. Date of opening will decided by JPC. | |||
| Construction Office | |||
| Providing Permanent Connection From M.C. Line To Medical Institute and Hospital | 08-12-2010 | 10-12-2010 | 10-12-2010 |
| Providing Permanent Connection From M.C. Line To Medical Institute and Hospital (100 Bedded Hospital) In P.U. South Campus, Chandigarh. Date of opening will be fixed by JPC. | |||
| Construction Office | |||
| Renovation of toilets F-T1 type houses | 06-12-2010 | 14-12-2010 at 15:30 | 14-12-2010 at 15:30 |
| Renovation of toilets F-T1 type houses (6 nos.) in Panjab University Campus Sector -14, Chandigarh. | |||
| Construction Office | |||
| Painting and white washing in the U.I.E.T | 06-12-2010 | 14-12-2010 at 15:30 | 14-12-2010 at 15:30 |
| Painting and white washing in the U.I.E.T Block-1 in P.U. South Campus, Sector-25, Chandigarh. | |||
| Construction Office | |||
| Water proofing treatment of roof of Student Centre building in P.U. campus, Sector-14, Chandigar | 01-12-2010 | 07-12-2010 at 03:30 | 10-12-2010 at 03:30 |
| Water proofing treatment of roof of Student Centre building in P.U. campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Laying of paver blocks flooring outside the extension of Botany Deptt.,P.U. Sector-14 CHD. | 30-11-2010 | 07-12-2010 at 03:30 | 10-12-2010 at 03:30 |
| Laying of paver blocks flooring outside the extension of Botany Deptt.,P.U. Sector-14 CHD. | |||
| A. C. Joshi Library | |||
| Construction of shortcut paths (footpaths) | 30-11-2010 | 03-12-2010 at 15:30 | 03-12-2010 at 15:30 |
| Construction of shortcut paths (footpaths) Student Centre to Various Deptt. in Panjab University Campus Sec-14, Chandigarh. | |||
| Construction Office | |||
| Renovation of Entrance Hall of CIL building | 01-12-2010 | 07-12-2010 at 15:30 | 07-12-2010 at 15:30 |
| Renovation of Entrance Hall of CIL building in Panjab University Campus , Sector -14, Chandigarh. | |||
| Construction Office | |||
| Providing and Fixing Granite marble | 01-12-2010 | 07-12-2010 at 15:30 | 07-12-2010 at 15:30 |
| Providing and Fixing Granite marble in Stairs portion of Directorate of sports Deptt. in Panjab University campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Foundation for Machines in Mechanical Labs | 01-12-2010 | 07-12-2010 at 15:30 | 07-12-2010 at 15:30 |
| Providing Foundation for Machines in Mechanical Labs of U.I.E.T. Deptt. in Panjab University Campus, Sector-14 Chandigarh. | |||
| Construction Office | |||
| Providing Flood lighting & High mast lighting System & Rewiring | 29-11-2010 | 03-12-2010 at 15:30 | 03-12-2010 at 15:30 |
| Providing Flood lighting & High mast lighting System in Panjab University Campus, Sector-14 & South campus, Chandigarh. Rewiring of 1st block, 2nd block and Mess in Boys Hostel No 6, Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Injection grouting treatment for water proofing in pool | 22-11-2010 | 30-11-2010 at 15:30 | 30-11-2010 at 15:30 |
| Providing Injection grouting treatment for water proofing in pool of Gandhi Bhavan in P.U. campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Parking for Emerging Area in social science | 22-11-2010 | 30-11-2010 at 15:30 | 30-11-2010 at 15:30 |
| Parking for Emerging Area in social science in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Renovation of Toilets (Ladies/Gents) of U.S.O.L | 22-11-2010 | 30-11-2010 at 15:30 | 30-11-2010 at 15:30 |
| Renovation of Toilets (Ladies/Gents) of U.S.O.L (D.C.S) in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Renovation of toilets F-T1 type houses | 22-11-2010 | 30-11-2010 at 15:30 | 30-11-2010 at 15:30 |
| Renovation of toilets F-T1 type houses (6 nos.) in Panjab University Campus Sector -14, Chandigarh. | |||
| Construction Office | |||
| Renovation of toilets of 'G' type Houses | 22-11-2010 | 30-11-2010 at 15:30 | 30-11-2010 at 15:30 |
| Renovation of toilets of 'G' type Houses (6 nos.) in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Renovation of Toilet 'E-I' type houses | 22-11-2010 | 30-11-2010 at 15:30 | 30-11-2010 at 15:30 |
| Renovation of Toilet 'E-I' type houses (8 nos.) in Panjab University Campus Sector-14, Chandigarh. | |||
| Construction Office | |||
| Renovation of Toilet 'A' type/T-IV houses | 22-11-2010 | 30-11-2010 at 15:30 | 30-11-2010 at 15:30 |
| Renovation of Toilet 'A' type/T-IV houses (13 nos.) in Panjab University Campus Sector-14 & 25, Chandigarh. | |||
| Department of Economics | |||
| Providing Catering Services For The Participants | 19-11-2010 | 26-11-2010 at 16:00 | 29-11-2010 at 15:00 |
| Tender Documents For The Work Of Providing Catering Services For The Participants Of 93rd Annual Conference Of The Indian Economic Association - 2010 To Be Held W.E.F. 27.12.2010 Till 29.12.2010 | |||
| Department of Economics | |||
| Briefcases For The Participants | 19-11-2010 | 26-11-2010 at 16:00 | 26-11-2010 at 17:30 |
| Tender Documents For Purchasing Briefcases For The Participants Of 93rd Annual Conference Of The Indian Economic Association, December 27–29, 2010. | |||
| Department of Economics | |||
| Providing Transportion Services For The Participants | 19-11-2010 | 26-11-2010 at 16:00 | 29-11-2010 at 15:00 |
| Tender Documents For Work Of Providing Transportion Services For The Participants Of 93rd Annual Conference Of The Indian Economic Association, December, 27-29, 2010. | |||
| Construction Office | |||
| Cement pointing and snowcem on boundary wall | 10-11-2010 | 19-11-2010 at 15:00 | 19-11-2010 at 15:30 |
| Cement pointing and snowcem on boundary wall around Panjab University Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Cement pointing and snowcem on boundary wall - Sector 25 | 10-11-2010 | 19-11-2010 at 15:00 | 19-11-2010 at 15:30 |
| Cement pointing and snowcem on boundary wall around Panjab University Campus, Sector-25, Chandigarh. | |||
| Construction Office | |||
| Renovation of the office of Chief Security office | 10-11-2010 | 19-11-2010 at 15:00 | 19-11-2010 at 15:30 |
| Renovation of the office of Chief Security office at Admn. Block in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing L.T. cable for motor of Tubewell | 08-11-2010 | 26-11-2010 at 15:00 | 26-11-2010 at 15:30 |
| Providing L.T. cable for motor of Tubewell in S.S.G.P.U. Regional centre, Bajwara, Hoshairpur. | |||
| A. C. Joshi Library | |||
| Provision of Earthing for newly setup Laboratory | 08-11-2010 | 23-11-2010 at 15:00 | 23-11-2010 at 15:30 |
| Provision of Earthing for newly setup Laboratory (i.e. Central Facility Laboratory) on the first floor of University Institute of Chemical Engineering & Technology in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Replacement of cable from outdoor panel to indoor panel | 08-11-2010 | 23-11-2010 at 15:00 | 23-11-2010 at 15:30 |
| Replacement of cable from outdoor panel to indoor panel near lift in institute of Dental Sciences & Hospital in Panjab University South Campus, Sector-25, Chandigarh. | |||
| Construction Office | |||
| Providing street light through under ground cable on the road between Dusehara Ground to B.H. no.4 | 08-11-2010 | 23-11-2010 at 15:00 | 23-11-2010 at 15:30 |
| Providing street light through under ground cable on the road between Dusehara Ground to B.H. no.4 security light at gate no.2, A.C. Joshi Library round about to Chemical Engineering Deptt. in Panjab University campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Providing Under ground cable after dismantling Overhead conductor and poles | 08-11-2010 | 23-11-2010 at 15:00 | 23-11-2010 at 15:30 |
| Providing Under ground cable after dismantling Overhead conductor and poles for the construction of building for provision of additional class rooms at Panjab University Regional Centre, Bajwara, Hoshiarpur | |||
| Construction Office | |||
| Rewiring (Recessed type) in 5 nos. F type houses | 08-11-2010 | 19-11-2010 at 15:00 | 19-11-2010 at 15:30 |
| Rewiring (Recessed type) in 5 nos. F type houses in Panjab University Campus, Sector-14 and South Campus, Chandigarh. | |||
| Construction Office | |||
| Rewiring (Recessed type) in 5 nos. T-1 houses | 08-11-2010 | 19-11-2010 at 15:00 | 19-11-2010 at 15:30 |
| Rewiring (Recessed type) in 5 nos. T-1 houses in Panjab University, South Campus, Chandigarh. | |||
| Construction Office | |||
| Making Provision of enclosure for energy meters | 08-11-2010 | 19-11-2010 at 15:00 | 19-11-2010 at 15:30 |
| Making Provision of enclosure for energy meters in Old Teacher's Flats in Panjab University Campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Rewiring in Old Teacher's Flats (21 nos.) | 08-11-2010 | 19-11-2010 at 15:00 | 19-11-2010 at 15:30 |
| Rewiring in Old Teacher’s Flats (21 nos.) in Panjab University campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Rewiring (recessed type) in Warden Houses (8 nos.) | 08-11-2010 | 19-11-2010 at 15:00 | 19-11-2010 at 15:30 |
| Rewiring (recessed type) in Warden Houses (8 nos.) in Panjab University campus, Sector-14, Chandigarh. | |||
| Construction Office | |||
| Rewinding of ceiling fans, Exhaust fan etc. and replacement of ball bearing of fans | 10-11-2010 | 16-11-2010 at 15:00 | 16-11-2010 at 15:30 |
| Rewinding of ceiling fans, Exhaust fan etc. and replacement of ball bearing of fans of various deptt./ Hostels/ Offices in Panjab University Campus, Sector-14 and South Campus, Chandigarh. (Period of contract for the year 01.12.2010 to 31.10.2011). | |||
| Registrar's Office | |||
| Purchase of Heavy Duty Digital Color Multi-functional Devices | 02-11-2010 | 18-11-2010 at 15:00 | 22-11-2010 at 15:30 |
| Tender Documents For The Purchase Of Heavy Duty Digital Color Multifunctional MFD | |||
| Department of Economics | |||
| roviding Catering Services For The Participants | 03-11-2010 | 10-11-2010 at 16:00 | 11-11-2010 at 15:00 |
| Tender Documents For The Work Of Providing Catering Services For The Participants Of 93rd Annual Conference Of The Indian Economic Association - 2010 To Be Held W.E.F. 27.12.2010 Till 29.12.2010 | |||
| Department of Economics | |||
| Purchasing Briefcases For The Participants | 03-11-2010 | 10-11-2010 at 16:00 | 11-11-2010 at 16:00 |
| Tender Documents For Purchasing Briefcases For The Participants Of 93rd Annual Conference Of The Indian Economic Association, December 27–29, 2010. | |||
| Department of Economics | |||
| Work of Providing Transportion Services for the Participants | 03-11-2010 | 10-11-2010 at 16:00 | 16-11-2010 at 16:00 |
| Tender Documents For Work Of Providing Transportion Services For The Participants Of 93rd Annual Conference Of The Indian Economic Association, December, 27-29, 2010. | |||
| Construction Office | |||
| Tender | 03-11-2010 | 10-11-2010 at 17:00 | 10-11-2010 at 17:00 |
| Providing Air Conditioning (Cassette Type) in Seminar Hall in Guru Teg Bahadur Bhawan in P.U. Campus, Sector-14, Chandigarh. Date of Opening Tender is fixed by J.P.C. | |||
| Construction Office | |||
| Tender | 26-10-2010 | 29-10-2010 at 17:00 | 29-10-2010 at 17:00 |
| Construction of 3 Nos. Security Posts for New Girls Hostel No.1 In P.U. South Campus, Chandigarh. Date of opening Tender is fixed by J.P.C. | |||
| Construction Office | |||
| Renovation of Toilet 'A' type/T-IV, E1, G, F-T1 Type in Panjab University Campus. | 27-10-2010 | 29-10-2010 at 15:30 | 29-10-2010 at 15:30 |
| Renovation of Toilet 'A' type/T-IV houses (13 nos.),Renovation of Toilet 'E-I' type houses (8 nos.),Renovation of toilets of 'G' type Houses (6 nos.),Renovation of toilets F-T1 type houses (6 nos.) in Panjab University Campus Sector -14 & 25, Chandigarh. | |||
| Conduct Branch | |||
| Tender for Supply and Scanning of Answer Books | 21-10-2010 | 08-11-2010 at 15:00 | 08-11-2010 at 16:00 |
| Tender for Supply and Scanning of Answer Books are invited from reputed firms having a turnover of more than Rs. 10 crores per year for the last three years for supply of the following items. | |||
| Construction Office | |||
| Provision of Work Station in Accounts Branch - Administrative Block | 13-10-2010 | 21-10-2010 at 15:30 | 21-10-2010 at 15:30 |
| Provision of work station in the Accounts Branch in Administration Block in Panjab University Campus, Sector 14, Chandigarh | |||
| Construction Office | |||
| Providing Air-Conditioning in Guru Teg Bahadur Bhawan | 11-10-2010 | 14-10-2010 at 17:00 | 14-10-2010 at 17:00 |
| Providing Air conditioning (Cassette Type) in Seminar Hall in Guru Teg Bahadur Bhawan in PU Campus, Sector 14, Chandigarh Note: Opening date will be decided by JPC. | |||
| Construction Office | |||
| Providing and Fixing of False Ceiling - Golden Jubilee Guest House | 01-10-2010 | 06-10-2010 at 17:00 | 06-10-2010 at 17:00 |
| Providing and fixing of Aluminium work & false ceiling in Construction/Extension of Golden Jubilee Guest House in PU Campus, Sector 14, Chandigarh. Note: Opening date will be decided by JPC. | |||
| Construction Office | |||
| Construction/Extension of Golden Jubilee Guest House | 01-10-2010 | 06-10-2010 at 17:00 | 06-10-2010 at 17:00 |
| Construction/Extension of Golden Jubilee Guest House in PU Campus, Sector 14, Chandigarh Note: Opening date will be decided by JPC. | |||
| Construction Office | |||
| Providing & Fixing False Ceiling - Botany Department | 15-10-2010 | 20-10-2010 at 17:00 | 20-10-2010 at 17:00 |
| Providing and fixing of False Ceiling for the construction of Extension of Botany Department. Budilng (7 Bays) (22 to 28 Bays) in PU Campus, Sector 14, Chandigarh Note: Opening date will be decided by JPC. | |||
| Construction Office | |||
| Construction of Security Post for New Girls Hostel South Campus | 15-10-2010 | 20-10-2010 at 17:00 | 20-10-2010 at 17:00 |
| Construction of 3 Nos. Security Posts of New Girls Hotel No. 1 in PU South Campus, Chandigarh Note: Opening date may be later decided by JPC. | |||
| Construction Office | |||
| Shortlisting of Firms | 27-09-2010 | 11-10-2010 at 17:00 | 11-10-2010 |
| Applications are invited for the shortlisting of the Construction firms/Agencies for the Construction of Multipurpose Auditorium with 2500 seating capacity and other ancillary areas in Panjab University South Campus, Chandigarh Date of opening will be decided by the University Committee. | |||
| Construction Office | |||
| Construction of CEAST (Block-I,II, III, IV) and Extension of Construction Office | 07-10-2010 | 19-10-2010 at 17:00 | 20-10-2010 at 10:00 |
| Construction of Centre of Emerging Area in Science and Technology (Block-I) In P.U. South Campus, Chandigarh. Construction of Centre of Emerging Area in Science and Technology (Block-II) In P.U. South Campus, Chandigarh. Construction of Centre of Emerging Area in Science and Technology (Block-III) In P.U. South Campus, Chandigarh. Construction of Centre of Emerging Area in Science and Technology (Block-IV) In P.U. South Campus, Chandigarh. Construction of Extension of Construction Office in P.U. Campus, Sector-14, Chandigarh | |||
| Construction Office | |||
| Renovation of Student Centre | 24-09-2010 | 01-10-2010 at 14:30 | 01-10-2010 at 15:00 |
| Renovation of Student Centre building (Central Placement Cell) in Panjab University Campus Sector-14 Chandigarh. | |||
| Sophisticated Analytical Instrumentation Facility, CIL and UCIM | |||
| Purchase of WD-XRF Spectrometer | 23-09-2010 | 20-10-2010 at 03:00 | 21-10-2010 |
| Purchase of WD-XRF Spectrometer. Please Note. Date & Time of opening: To be notified later | |||
University Enquiry Toll Free Number: 1800-180-2065 (from 9:00 a.m. to 5:00 on working days including Saturday)
© 1997- 2013 - Panjab University, Chandigarh, India. Developed by: Computer Centre, Panjab University